Skip to content
Commercial Builders Orlando: Compare Licensed Builders for Your Project
Local market

Commercial Builders Orlando: Compare Licensed Builders for Your Project

Commercial builders taking on Orlando projects need an active Florida license and must permit through the city's ProjectDox review or, outside city limits, Orange County's Fast Track. Orange County had 426 commercial building establishments employing 5,325 people in 2025, per BLS. CB&C introduces licensed builders free to owners.

Free Commercial Project Match

Tell us what you are building. We match you with licensed builders who fit it.

Step 1 of 3: Your project

Free for project ownersNo obligationAbout 60 seconds

  • 60 business daysCity of Orlando response time for complete commercial applications under 25,000 sq ft (F.S. 553.792).
  • 5,325 jobsOrange County commercial building employment in 2025, up 11.7% from 2020 (BLS QCEW).
  • One foot above BFERequired elevation for development in Orlando's designated flood hazard areas.

Commercial builders Orlando owners can draw on

The pool of commercial builders Orlando owners can hire is mostly based in Orange County, where BLS counted 426 private commercial building establishments employing 5,325 people in 2025. The city itself had 333,888 residents on July 1, 2025, inside a county of 1,528,002, so a large share of commercial work lands just outside city limits and goes through the county permit office instead of City Hall.

Firm counts grew faster than jobs. Establishments rose 29.1% from 330 in 2020, while employment rose 11.7% from 4,767. The average establishment now carries about 12.5 jobs, which means more small and mid-size general contractors competing for tenant improvement and mid-rise work. The latest quarterly reading is flat: March 2026 employment was 5,247, down 0.9% from 5,293 a year earlier (preliminary).

Orange County commercial building construction in numbers
MeasureOrange CountyPeriodComparison
NAICS 236220 establishments4262025 annual330 in 2020
NAICS 236220 employment5,3252025 annual4,767 in 2020
NAICS 236220 average weekly wage$2,0542025 annualU.S. $2,061
NAICS 236220 employment, March5,2472026 Q1 (preliminary)5,293 in March 2025
All construction (NAICS 23) employment46,5902025 annual43,639 in 2020
Active CGC / CBC licenses (holder address)1,260 / 650October 2026DBPR extract
Population, City of Orlando333,888July 1, 2025County 1,528,002

BLS QCEW private ownership; jobs are counted where the employing establishment is located, not at the jobsite. Licenses are held by individuals and are not a count of firms.

Source: [1][2][10][3][4]

Pay in the sector has caught up with the national level. The 2025 average weekly wage in Orange County NAICS 236220 was $2,054, 99.7% of the U.S. figure of $2,061. Compare Florida's other large counties in our commercial builders by state report.

Orange County commercial building wages, 2020 to 2025

Average weekly wage, private NAICS 236220, Orange County and United States

Orange County commercial building wages, 2020 to 2025Line chart: the Orange County NAICS 236220 weekly wage rose from $1,642 in 2020 to $2,054 in 2025, while the U.S. figure rose from $1,623 to $2,061.1,4001,6001,8002,0002,200USD per week202020212022202320242025Orange CountyUnited States

Source: U.S. Bureau of Labor Statistics, QCEW annual averages

Getting a commercial permit in Orlando

Inside city limits, the Permitting Services Division at 400 South Orange Avenue runs plan review digitally. After the application is processed, the applicant receives an invitation to upload drawings in ProjectDox. Commercial projects first receive an invoice for a 25% non-refundable plan review deposit, and uploads are pre-screened within two business days before routing to reviewers.

  1. Apply and pay the deposit

    The city emails a permit number within two business days of a complete application, then invoices the 25% commercial plan review deposit.

  2. Upload to ProjectDox

    Each drawing is uploaded as a single-page file, and sealed plans need a verified digital signature or seal.

  3. Answer comments on time

    For commercial buildings under 25,000 sq ft, the state timeline in F.S. 553.792 applies: the city responds within 60 business days of a complete application, and applicants have 10 business days to answer rejection comments.

  4. Record a Notice of Commencement

    Under Fla. Stat. 713.13 and 713.02(5), a direct contract above $2,500 needs a Notice of Commencement recorded with the Orange County Comptroller before work starts; above $5,000, the building department also needs a copy before the first inspection (Fla. Stat. 713.135(1)(e)).

  5. Book inspections

    Inspections are scheduled online through Permit Lookup, by text or by phone; the phone cut-off for same-day inspections is 6 a.m., and same-day cancellations cost $50.

Owners can also use a private provider for building code plan review and inspections under F.S. 553.791. The city's private provider page is explicit that those firms cannot review fire protection, site work, zoning, floodplain or appearance, so those reviews still go through city staff. A permit left six months without an inspection expires, which matters on phased projects. Our commercial building permits guide explains the general sequence.

For unincorporated parcels, the Orange County Division of Building Safety reviews plans, issues permits and inspects work, using Fast Track Online Services for applications, electronic plan submittal and inspection scheduling. Pre-review meetings with county reviewers can be requested and are held by video call.

Which office handles your Orlando-area permit
Site locationOfficePortalNotes
Inside Orlando city limitsCity of Orlando Permitting Services DivisionProjectDox digital plan review; Permit Lookup for status and inspectionsCommercial plan review deposit due before upload
Unincorporated Orange CountyOrange County Division of Building SafetyFast Track Online ServicesRemote pre-review meetings by request
Any site in a FEMA flood hazard area (city)City of Orlando Public Works, EngineeringFloodplain Development PermitElevation certificate required

Confirm jurisdiction with the parcel address before design; some Orlando addresses sit outside city limits.

Source: [13][18][20]

Digital plan review setup on an Orlando commercial jobsite
Illustrative photograph (generated image).

Wind, flood and rain rules for Central Florida buildings

Orange County sits outside the High-Velocity Hurricane Zone, which the 2023 Florida Building Code limits to Broward and Miami-Dade counties. Orlando projects design to the statewide wind speed maps instead, and Orange County requires construction documents for new buildings, additions and structural alterations to show compliance with the wind loading requirements of Section 1609, prepared by a Florida-licensed architect or engineer.

Water is the bigger site constraint. The city's floodplain information page notes that Orlando typically receives more than 53 inches of rain a year and that a summer thunderstorm can drop one to three inches within a few hours. All development in designated flood hazard areas must be elevated one foot above base flood elevation, commercial developments inside a FEMA Special Flood Hazard Area need a Floodplain Development Permit, and the 50% substantial improvement rule applies to renovations.

The Atlantic hurricane season runs June 1 to November 30, and the National Hurricane Center's 1991 to 2020 average is 14 named storms a year. Schedule roof dry-in and window installation with that window in mind on long builds.

Orlando districts, corridors and submarkets

The city's Neighborhood Maps library names the districts below, including several industrial and airport areas where warehouse and flex projects cluster. Commercial builders we introduce work across these 18 areas and the surrounding county.

  • Central Business District
  • South Eola
  • Thornton Park
  • Holden Parramore
  • North Orange
  • South Orange
  • Milk District
  • Baldwin Park
  • College Park
  • Millenia
  • Metro West
  • Florida Center
  • 33rd Street Industrial
  • Seaboard Industrial
  • Beltway Commerce
  • Airport North
  • Orlando International Airport
  • Lake Nona Central

Downtown has two public bodies shaping development. The Downtown Development Board, created by Special Act in 1971, covers a 1,000 acre boundary, and the Community Redevelopment Agency pursues redevelopment inside the 1,664 acre Downtown Redevelopment Area. Office conversions and storefront build-outs there tend to involve both bodies.

Access shapes logistics. FDOT has completed the I-4 Ultimate improvements through downtown, the 22-mile SR 408 carries more than 164,000 vehicles a day at its peak where it crosses downtown, and the Central Florida Expressway Authority operates 33 miles of SR 417 in Orange County, linking International Drive with the airport side of the county. The airport authority's plan targets a new cargo processing facility and an on-airport vertiport by 2030, and activation of 60% of the vacant real estate at Orlando Executive Airport by 2035, which points to continued warehouse construction demand near Airport North and Beltway Commerce.

Hospitality anchors the International Drive side. The Orange County Convention Center reports about $3.9 billion in annual economic impact and nearly 200 events a year across roughly 7 million total square feet; its West Building rests on more than 50 miles of pilings, a reminder of how much foundation work Central Florida soils can demand. Restaurant build-outs and retail construction near that corridor follow the convention calendar.

Tilt-up warehouse construction near an Orlando airport industrial area
Illustrative photograph (generated image).

How CB&C matches Orlando projects

CB&C is an independent matching service, not a contractor; we sign no construction contracts. We introduce builders who already work in Orange County and hold an active Florida license that you can confirm yourself on the DBPR license search. The state extract downloaded on October 3, 2026 listed 1,260 current, active Certified General Contractor licenses and 650 Certified Building Contractor licenses with an Orange County address.

CGC vs CBC: Under Florida Statutes s. 489.105, a general contractor's scope is unlimited, while a building contractor may build commercial buildings that do not exceed three stories and may remodel buildings of any size if the work does not affect structural members. A five-story office needs a general contractor.

Our vetting checklist covers insurance, recent comparable work and references. For the decision itself, read how to choose a commercial contractor and decide early between design-build and design-bid-build, since that choice changes who manages the ProjectDox submittal.

Trade pay in metro Orlando

Field wages in metro Orlando sit below national averages, while management pay is close to them. In May 2025 the mean construction manager salary in the Orlando-Kissimmee-Sanford MSA was $125,240, against $124,360 nationally; electricians averaged $55,310 against $71,490, and construction laborers $43,130 against $52,030. Cost estimators were close to parity at $83,350.

Construction pay in metro Orlando vs the U.S., May 2025

Annual mean wage by occupation, Orlando-Kissimmee-Sanford MSA and United States

Construction pay in metro Orlando vs the U.S., May 2025Bar chart comparing May 2025 mean wages: construction managers $125,240 in Orlando vs $124,360 nationally; electricians $55,310 vs $71,490; construction laborers $43,130 vs $52,030.050,000100,000150,000USD per year125,240124,360Constructionmanagers83,35085,390Costestimators78,87086,450Tradesupervisors55,99072,170Plumbers andpipefitters55,31071,490Electricians51,41065,630Carpenters43,13052,030ConstructionlaborersOrlando MSAUnited States

Source: U.S. Bureau of Labor Statistics, OEWS May 2025 metropolitan and national estimates

Lower field wages do not translate into a fixed discount on bids, because materials, flood elevation and schedule risk weigh heavily. Our cost per square foot guide explains how to read those drivers, and the construction pay by metro report ranks Orlando against other large metros.

Other Florida markets near Orlando

The statute calls for a recorded notice above $2,500 and a building-department copy above $5,000; our notice of commencement guide shows both rules and the Orange County Comptroller's eFile fees.

Frequently asked questions

Do Orlando commercial permits require a deposit before plan review?

Yes. Inside city limits, commercial projects receive an invoice for a 25% non-refundable plan review deposit before the ProjectDox upload invitation is sent.

How long does the City of Orlando take to review a commercial permit?

For non-residential buildings under 25,000 sq ft, the city responds with approval or comments within 60 business days of a complete application under F.S. 553.792. Larger projects vary by scope; status is on Permit Lookup.

Is Orlando in the High-Velocity Hurricane Zone?

No. The 2023 Florida Building Code defines the zone as Broward and Miami-Dade counties. Orange County projects use the statewide wind provisions, and construction documents must show Section 1609 wind loading compliance.

What flood rule affects new commercial buildings in Orlando?

Development in designated flood hazard areas must be elevated one foot above base flood elevation, and commercial projects in a FEMA Special Flood Hazard Area need a Floodplain Development Permit from the city.

Who issues permits for sites near International Drive or the airport?

It depends on the parcel. Inside city limits the City of Orlando issues the permit; unincorporated parcels go to the Orange County Division of Building Safety through Fast Track. Confirm with the parcel address before design.

Can a private provider speed up an Orlando project?

Private providers can handle building code plan review and inspections under F.S. 553.791, but not fire protection, site work, zoning, floodplain or appearance review, which stay with the city.

How do I check an Orlando builder's license?

Search the company or qualifier by name or license number on the Florida DBPR license portal. Check that the license is current and active and that its class covers your building's height.

Does CB&C charge Orlando project owners?

No. Owners pay nothing. CB&C is an independent matching service, and some builders pay for introductions.

Sources