Tenant Improvement Contractors for Office, Retail and Restaurant Space
Commercial construction service

Tenant Improvement Contractors for Office, Retail and Restaurant Space

Tenant improvement contractors build out leased commercial space to fit a tenant: walls, ceilings, lighting, HVAC distribution, plumbing, finishes and code upgrades. The job is shaped by the space's starting condition (shell or second-generation), the lease work letter, the TI allowance, permit review and the capacity of existing building systems.

Free Commercial Project Match

Tell us what you are building. We match you with licensed builders who fit it.

Step 1 of 3: Your project

Free for project ownersNo obligationAbout 60 seconds

  • Start with the leaseThe work letter decides who builds what and who pays for it.
  • Check the bonesHVAC, electrical service and restrooms often set the real budget.
  • Permit earlyLandlord approval comes before the building department sees a drawing.

What tenant improvement contractors build

A tenant improvement, or TI, is construction inside leased space to make it usable for a specific tenant. It can be as light as new carpet, paint and lighting in an office suite or as heavy as a restaurant with a grease duct through the roof. The contractor works inside someone else's building, which adds a second set of rules: the landlord's construction requirements, insurance minimums, working hours, elevator and loading dock bookings, and approvals before any work touches the roof, structure or shared systems.

  • Office: demising walls, private offices, conference rooms, break rooms, data cabling and lighting controls.
  • Retail: storefront, sales floor, fitting rooms, stockroom and signage coordination with the landlord.
  • Restaurant: kitchen hood and grease duct, grease interceptor, walk-in coolers, gas service and health department review; see our restaurant build-out contractors page.
  • Medical and dental: plumbing at every operatory or exam room, medical gas, lead shielding and infection control; see medical office construction.

TI work is one of the ten services on our commercial construction services hub. If you are building the shell itself, that is new commercial construction instead.

The sinks, finishes, hood and grease interceptor a food tenant must build are mapped to their code sections in our commercial kitchen requirements guide.

Shell space vs second-generation space

The single biggest driver of a TI budget is what the space looks like on the day you get the keys. Leasing brokers use loose labels, so ask for a written description of every system that will be delivered, and walk the space with your contractor before you sign the lease.

What you may get on day one, by space condition
ConditionUsually deliveredUsually missingTI scope
Cold or dark shellStructure, roof, exterior walls, slab (sometimes unfinished), utility stubsHVAC distribution, interior walls, ceilings, restrooms, lighting, often the electrical panelFull build-out of every interior system
Warm or vanilla shellShell plus base HVAC, electrical panel, core restrooms, finished slab, sometimes a ceiling gridInterior walls, finishes, tenant lighting and HVAC distributionLayout, finishes and system extensions
Second-generation spacePrevious tenant's walls, ceilings, lighting, restrooms and HVACA layout that fits you; sometimes current code complianceSelective demolition, reconfiguration, refresh and code upgrades

Market labels vary by landlord and region. Always rely on the written lease exhibit, not the listing label.

Second-generation space: Space that a previous tenant built out and used. It may keep walls, ceilings, restrooms and HVAC you can reuse, but it can also hide outdated wiring, abandoned equipment and code issues that surface once demolition starts.

A flat shell slab may need saw-cutting or a sloped screed before a kitchen can drain at 1:50, as our guide to commercial kitchen flooring requirements shows.

How the TI allowance and the work letter shape the job

Most commercial leases include a work letter, an exhibit that splits the construction into landlord's work and tenant's work and sets the rules for both. The landlord's side often covers the base building: structure, roof, a delivered HVAC unit, an electrical panel of a stated size, code-compliant core restrooms. The tenant's side covers everything that makes the space theirs. Read the work letter with your contractor, because every item it leaves vague becomes a change order later.

The TI allowance is the landlord's contribution toward tenant's work, usually stated per rentable square foot. Landlords often pay it as reimbursement after work is complete, on proof of payment and lien releases, so the tenant or contractor carries the cost in the meantime. Allowances may exclude furniture, cabling or signage, may charge a construction management fee, and may expire if unused. Our tenant improvement allowance guide explains the mechanics in detail. Lease terms are negotiated and vary; have your attorney or broker review them.

  • Landlord's work, in writingEach base building item with a delivery condition and date.
  • Allowance termsAmount, eligible costs, payment timing, documentation and deadline.
  • Contractor rulesApproved contractor lists, union requirements, insurance limits and supervision fees.
  • Plan approvalHow long the landlord takes to approve drawings and what it reviews.
  • Restoration clauseWhether you must remove your improvements at lease end.

The space you lease is probably decades old

TI contractors rarely work in new buildings. The Energy Information Administration's most recent commercial buildings survey counted 970 thousand office buildings in 2018 with a median age of 38 years, and 47.2% of them were built before 1980. Older buildings bring smaller electrical services, aging air handlers, restrooms that do not meet current accessibility rules and, sometimes, asbestos in flooring or fireproofing. Interior reconfiguration is common: 709 thousand buildings, 12.0% of the stock, reported interior wall reconfiguration since 2000.

Age of U.S. commercial buildings where tenants build out, 2018
Building typeBuildings (thousand)Floorspace (million sq ft)Median age (years)Built before 1980 (share of buildings)
Office97016,6623847.2%
Retail (other than mall)3505,1934353.7%
Enclosed and strip malls1675,5883039.5%
Food service2861,3853950.3%
Health care1374,0182932.8%

2018 is the latest Commercial Buildings Energy Consumption Survey. Built-before-1980 shares are a CB&C calculation from EIA Table B8.

Source: [4][5]

For age data by building type and region, see our commercial building stock age report.

Second-generation office space during selective demolition showing aging ductwork
Illustrative photograph (generated image).

Permits and inspections for a build-out

Most TI work beyond paint and carpet needs a building permit, plus separate trade permits for electrical, mechanical, plumbing, fire sprinkler and fire alarm work. The sequence usually runs: landlord approves drawings, the architect submits, reviewers comment, the architect responds, and the permit issues. Fire sprinkler and alarm shop drawings often go through the fire marshal on their own track. Restaurants and medical uses add health department or state agency review.

In Florida, state law sets a review clock for many smaller projects: for nonresidential buildings under 25,000 square feet using a local plans reviewer, the local government has 60 business days after a complete application. Build those weeks into the rent commencement date you negotiate. Our commercial building permits guide lists what reviewers check most often.

Restaurant suites also go through health department plan review, and our commercial kitchen design guide lists what that submittal contains.

MEP: where tenant improvement budgets move

Walls and finishes are easy to price from a floor plan. Mechanical, electrical and plumbing are not, because they depend on what the building already has. A suite that needs more cooling than the existing rooftop unit can deliver, a new electrical panel, or a restroom far from the building's sanitary line can each change the budget more than the entire finish package. Ask bidders to visit the space with their MEP subcontractors before pricing.

Fire protection deserves its own line in every TI bid. New walls change sprinkler coverage, so heads are added or moved, and the sprinkler contractor submits hydraulic calculations and shop drawings for approval. Fire alarm devices, strobes and smoke detectors follow the new layout and must be tied into the building's existing panel, usually by the vendor that maintains it for the landlord. Ask each bidder whether the landlord's fire alarm vendor is required and whether that cost is carried or excluded, because it is one of the most common surprises in a build-out.

Producer price change for build-out materials

12 months to August 2026

Producer price change for build-out materialsBar chart of 12-month producer price changes to August 2026 for build-out materials: aluminum mill shapes up 27.3%, copper wire and cable up 27.2%, switchgear up 12.3%, flat glass up 2.8% and gypsum products up 0.2%.%Aluminum mill shapes27.3Copper wire and cable27.2Steel mill products23.4Switchgear and industrial controls12.3Transformers and power regulators7.6Flat glass2.8Insulation materials1.1Gypsum products0.2

Source: U.S. Bureau of Labor Statistics, Producer Price Indexes (August 2026, preliminary)

Material prices behind MEP work have been volatile. In the year to August 2026, federal producer prices for copper wire and cable rose 27.2% and switchgear and industrial controls 12.3%, while gypsum products rose 0.2%. The price index for electrical contractors on nonresidential work rose 5.3% and for plumbing and HVAC contractors 4.0%. The full series is in our commercial construction price index.

In a restaurant space, check whether the existing hood's kitchen fire suppression system is listed to the current UL standard for kitchen suppression before you budget the MEP work.

On a restaurant TI, the hood, grease duct and makeup air are sized together, as shown in our commercial kitchen hood sizing guide.

Building a TI schedule around your lease dates

  1. Test fit

    A space plan confirms the suite works before the lease is signed.

  2. Lease and work letter

    Allowance, landlord's work, approvals and rent start date are fixed.

  3. Construction drawings

    Architect and engineers produce permit drawings; contractors price them.

  4. Landlord approval

    Drawings go to the landlord before the building department.

  5. Permit

    Review and comment cycles; long-lead items are ordered in parallel.

  6. Build

    Demolition, rough-in, inspections, close-in, finishes.

  7. Final inspections and move-in

    Certificate of occupancy or completion, punch list, allowance paperwork.

Long-lead items run in parallel with permit review. Rooftop units, electrical panels, specialty doors, storefront systems and restaurant kitchen equipment can take longer to arrive than the build itself, so ask your contractor which items need release before the permit issues and whether the landlord or tenant carries the deposit risk. The common failure is a rent start date that assumes construction can begin the day the lease is signed. Negotiate rent commencement tied to permit issue or substantial completion where you can.

Why tenant improvement contractors stay busy while office construction shrinks

Ground-up office construction has fallen for several years. Census data shows private office spending outside data centers at $49.2 billion at an annual rate in August 2026, down from $74.0 billion in August 2019 and 9.4% lower than a year earlier. Fewer new offices mean more tenants moving into existing space, which keeps build-out and refresh work steady even when new starts are weak.

Private office construction spending excluding data centers

August of each year, seasonally adjusted annual rate

Private office construction spending excluding data centersLine chart of U.S. private office construction spending excluding data centers each August: $37.3 billion in 2014, a peak of $74.0 billion in 2019, then a decline to $49.2 billion in 2026.30.040.050.060.070.080.0$ billions2014201620182020202220242026

Source: U.S. Census Bureau, Construction Spending, privsatime.xlsx (August 2026 release); CB&C calculation subtracting data centers from private office

Monthly figures by building type are in our commercial construction spending tracker.

Tenant improvements in South Florida

In Miami-Dade and Broward, any new or replaced storefront, exterior door, window or rooftop equipment in a TI falls under High-Velocity Hurricane Zone rules, which require approved products and can add lead time. If your build-out touches the envelope, read our HVHZ construction primer and ask bidders which approved products they have used recently. Local market data is in the South Florida commercial construction report.

New impact-rated aluminum storefront installed in a South Florida retail bay
Illustrative photograph (generated image).

How to compare tenant improvement contractors

  • Similar suitesAsk for recent build-outs of the same use and size, ideally in occupied buildings.
  • Landlord familiarityContractors who have worked in the building know its rules, engineers and quirks.
  • MEP walk-throughBids priced after a site visit with MEP subcontractors are more reliable.
  • Allowance paperworkAsk how they document costs and lien releases for allowance reimbursement.
  • After-hours capacityNoisy work in occupied buildings is often limited to nights or weekends.
  • Clear exclusionsFurniture, cabling, security, signage and appliances are often outside the bid.

Our guide to choosing a commercial contractor covers licensing and references. Retail landlords with several tenants fitting out at once may also want a builder from our retail construction page.

After turnover, the tenant's hood and duct go on the inspection schedule explained in our guide to commercial kitchen hood cleaning.

Frequently asked questions

What do tenant improvement contractors do?

They build out leased space for a tenant: demolition, framing, drywall, ceilings, doors, lighting, HVAC distribution, plumbing, finishes and the code upgrades the work triggers. They also coordinate with the landlord's rules, engineers and approval process.

Who hires the TI contractor, the landlord or the tenant?

Either, depending on the lease. In a landlord-build arrangement the landlord hires and manages the contractor and the tenant pays costs above the allowance. In a tenant-build arrangement the tenant hires its own contractor, often from a landlord-approved list, and is reimbursed up to the allowance.

How is a TI allowance usually paid?

Often as reimbursement after work is complete, against invoices, proof of payment and lien releases, though some leases pay in progress draws. Terms vary; our TI allowance guide explains common structures.

What is the difference between a warm shell and second-generation space?

A warm shell has base systems such as HVAC, an electrical panel and core restrooms but no tenant layout. Second-generation space was already built out by a previous tenant, so you may reuse walls and systems but inherit their condition.

Do I need a permit for an office build-out?

Almost always, once work goes beyond paint, carpet and like-for-like fixtures. Moving walls, adding circuits, relocating sprinkler heads or changing HVAC typically requires building and trade permits. Check with the local building department.

Will my build-out trigger ADA upgrades?

Often. Altered areas must meet the 2010 ADA Standards, and alterations to primary function areas can require path-of-travel upgrades up to the disproportionality limit of 20% of the alteration cost. Your architect should confirm what applies; this is not legal advice.

How do I estimate what a build-out will cost before I sign a lease?

Ask a contractor to walk the space and price a test-fit plan before you sign, with MEP subcontractors present. Compare that figure with the allowance on offer. Our cost per square foot guide explains which published benchmarks are useful and which are not.

How long does a tenant improvement take?

Design, landlord approval and permitting often take longer than construction itself. Ask bidders for a schedule from lease signing to move-in, with landlord review and permit time shown separately.