Category: Owner Guides
Steel Building Insulation: What the Energy Code Requires, Zone by Zone
Steel building insulation is set by an assembly U-factor: ASHRAE 90.1-2022 caps a conditioned zone 4 metal roof at U-0.037, which a single R-19 blanket on a through-fastened roof (U-0.151) misses.
Building Commissioning: What It Is, When Code Requires It and What It Costs
Building commissioning tests HVAC, water heating and lighting controls against the owner’s requirements; the 2024 IECC requires it from 10,000 sq ft, at an LBNL median $1.03 per sq ft.
AIA G702 Application and Certificate for Payment: Every Line, a Worked Example and the A201 Pay Cycle
The AIA G702 turns G703 totals into the current payment due across 9 lines; the architect has 7 days under A201-2017 to certify it.
AIA A201-2017 General Conditions: Articles, Deadlines and What Owners Change
AIA A201-2017 has 15 articles, a 21-day claim notice rule and a 14-day concealed-conditions notice, and two public owners we compared edited it very differently.
Lien waiver: conditional vs unconditional, the 4 types and state forms
A lien waiver trades lien rights for a payment; 11 states print the form in their statutes, and the conditional or unconditional choice decides whether you are protected if the check fails.
Builder’s Risk Insurance for Commercial Projects: Who Buys It, What It Covers and What It Costs
Builder’s risk insurance explained from AIA Exhibit A, three public policies and Florida school board rates of 0.5445% to 0.935%.
Bid Bond: What It Guarantees, How Much It Is and What Happens on Default
Federal construction bids over $150,000 need a bid bond of at least 20% of the bid price, capped at $3 million, on Standard Form 24.
Preconstruction Services: What Owners Get, Sign and Pay For
Preconstruction services are the estimates, constructability reviews, schedules and long-lead planning a builder delivers during design, bought under AIA A133, ConsensusDocs 500 or state CMAR statutes.
RFI in Construction: What Goes in One, What A201 Says and When It Becomes a Change Order
AIA A201-2017 sets no fixed RFI response time; published benchmarks run 7.1 to 13.9 days, and about 17% of RFIs became contract modifications in a WisDOT study.
Tilt-Up Construction: How It Works, Step by Step, and the Rules Behind It
Tilt-up construction casts concrete wall panels flat on site and lifts them by crane; OSHA 29 CFR 1926.704 requires tilt-up inserts rated at 2 times the maximum intended load.