Pre-Engineered Metal Building: Frames, Purlins, Girts and the Codes Behind Them

Tapered steel rigid frames of a pre-engineered metal building standing on a slab with roof purlins installed

A pre-engineered metal building (PEMB) is a steel building whose frames, purlins, girts, bracing and panels are designed and fabricated by one manufacturer for a specific order, then bolted together on site.

Key takeaways

  • The 2024 International Building Code adds a special inspection category for metal building systems, Section 1705.2.6, according to MBMA Common Industry Practices (2024 edition) and the ICC Statement of Special Inspections template.
  • The MBMA Performance Guide Specification (August 2026) lists AISC 360-22 for hot-rolled and built-up frames and AISI S100-16 (2020) for cold-formed purlins and girts, with 55 ksi minimum yield for purlins, girts and eave struts.
  • OSHA 29 CFR 1926.758 requires at least 4 anchor rods per column and 50 percent of rigid-frame bolts, or the manufacturer’s number if greater, tightened before the crane lets go.
  • MBMA sets drift options from H/60 to H/400 for 10-year wind; the federal Unified Facilities Guide Specification UFGS 13 34 19 (August 2026) sets H/480, which is 0.5 in. of sway at a 20 ft eave against 4.0 in. at H/60.
  • Under MBMA Common Industry Practices Section 3.2.2, the manufacturer does not design the foundation; its anchor rod plan shows only rod location, diameter and projection.

What is a pre-engineered metal building?

A pre-engineered metal building is a complete structural and envelope system designed by the manufacturer as one unit. The MBMA guide specification (August 2026, Section 1.4 A) requires that “all components of the system shall be supplied or specified by the same manufacturer”, and its scope excludes foundations, the floor slab, cranes, plumbing, electrical, HVAC and interior finishing.

“Pre-engineered” does not mean one stock design sold off a shelf. Each order is designed to the loads, code edition and dimensions in the order documents, and the manufacturer’s engineer, registered in the project’s jurisdiction, seals a Letter of Certification and design calculations (MBMA Common Industry Practices, Section 3.3.2). The same section says that seal does not make the manufacturer’s engineer the engineer of record for the whole project.

OSHA calls the same product a “systems-engineered metal building” and gives it its own erection rule, 29 CFR 1926.758. MBMA reports that a metal building shell can be completed in 30 to 50 percent less time than competing framing systems (MBMA, accessed October 2026); that is an industry claim about the shell, not the full project. Owners choosing who to hire, rather than how the system works, will find bid scope and contractor checks on our page about metal building contractors.

What are the parts of a pre-engineered metal building?

A PEMB has four structural layers: primary frames, secondary framing, bracing and cladding, all tied to the foundation by anchor rods. MBMA lists primary framing as clear span or modular rigid frames, truss systems, braced end frames, endwall columns and canopy beams, and secondary framing as purlins, girts, eave struts and flange bracing (MBMA guide specification, August 2026, Section 1.1).

Parts of a pre-engineered metal building and the standard behind each Gable rigid frame, end view: each part and its governing standard Roof panelsASTM A653 G90 or A792 AZ55Tested to ASTM E1592 Purlins (cold-formed Z)Grade 55, 55 ksi; AISI S1005 ft on center in MBMA example Eave strutCold-formed C section Girts (Z or C)Grade 55; AISI S100 Rigid frameBuilt-up tapered I50 or 55 ksi plateAISC 360-22 Rod or cable X-bracingin braced wall and roof baysASTM A529 rod or A475 cable Anchor rods: minimum 4 per column (OSHA 1926.758(b))Foundation designed by others, not the manufacturer (MBMA CIP 3.2.2) Sources: MBMA Performance Guide Specification (Aug 2026); MBMA Roof Framing Design Guide (2024); OSHA 29 CFR 1926.758.
Each PEMB part with its material grade and governing standard, from the MBMA Performance Guide Specification (August 2026), MBMA Roof Framing Design Guide (2024) and OSHA 1926.758 (accessed October 20, 2026).
ComponentTypical memberMaterial and minimum yieldDesign standardSource
Rigid frame (columns and rafters)Built-up tapered I section welded from plateASTM A1011, A1018, A529 or A572, 50 or 55 ksiAISC 360-22MBMA guide spec 2.1 B
Hot-rolled frame membersWide-flange or other rolled shapesASTM A36 at 36 ksi; A572 or A992 at 50 ksiAISC 360-22MBMA guide spec 2.1 A
Purlins (roof)Cold-formed Z section, lapped over framesASTM A1011 or A1039 Grade 55 primed, A653 Grade 55 galvanized, 55 ksiAISI S100-16 (2020)MBMA guide spec 2.2 A
Girts (walls)Cold-formed Z or C sectionGrade 55, 55 ksiAISI S100-16 (2020)MBMA guide spec 2.2 A
Eave strutCold-formed C section at the roof edgeGrade 55, 55 ksiAISI S100-16 (2020)MBMA guide spec 2.2 A
Rod or cable X-bracingRods or cables in braced wall and roof baysASTM A529 rod at 50 ksi; ASTM A475 cableAISC 360-22MBMA guide spec 2.1 F
Roof and wall panelsStanding seam or through-fastened steel sheetASTM A653 G90 or A792 AZ55 coated sheet, 50 ksiASTM E1592 test; UL 580 uplift classMBMA guide spec 2.3, 2.4
Anchor rodsRods cast into the foundationSpecified by the foundation designerOSHA 1926.758(b): at least 4 per columnOSHA; MBMA CIP 3.2.2

Purlins sit between two labels. The MBMA Roof Framing Design Guide, 2nd edition (June 2024) calls purlins “the primary load carrying components of the roof system” but notes they are “commonly called secondary members with respect to the entire building system”. Z purlins are usually lapped over the frames with at least two structural bolts through the webs, which makes them continuous and lighter for the same span.

Coating choice is a code-adjacent detail owners often miss. The MBMA guide specification (Section 2.3) says G60 galvanized sheet “should be used only for interior applications”, while G90 galvanized or AZ55 aluminum-zinc coatings suit exposed exterior use.

Frame type is the next choice after the parts. The federal guide specification UFGS 13 34 19 (August 2026, Section 1.4.1) names six primary frame types, and its bay spacing options are 20, 25 or 30 ft with eave heights of 16, 20, 24 or 28 ft.

Frame type (UFGS 13 34 19 term)What it is (UFGS 1.4.1)Typical use (CB&C editorial)
Rigid clear spanSolid-member frame with no interior columnsWarehouses, gyms, hangars that need open floor
Rigid modularSolid-member frame with interior columnsVery wide buildings where interior columns are acceptable
Truss-frame clear spanTruss-member frame, no interior columnsLong spans where a deep truss is lighter than a plate rafter
Truss-frame modularTruss-member frame with interior columnsWide footprints with truss roofs
Long baySolid or truss frame without interior columns, named for long bays between framesProjects that want fewer frame lines
Lean-toFrame partly supported by another structureAdditions and sheds against an existing building

Which codes and standards govern PEMB design?

A PEMB is designed under the building code your jurisdiction adopted, its load standard and two steel specifications. As of October 2026, MBMA says its Metal Building Systems Manual, 2024 edition, conforms to the 2024 IBC and ASCE 7-22 (MBMA Design Resources), and its guide specification bases its reference list on the 2024 IBC.

DocumentEdition namedWhat it controls on a PEMBSource
International Building Code (IBC)2024Code path, construction documents, special inspection (Section 1705.2.6), deflection limits (Table 1604.3)MBMA guide spec 1.3; MBMA CIP 3.2
ASCE/SEI 7-227-22 with Supplements 1 to 3Wind, snow, rain (Chapter 8), seismic and tornado (Chapter 32) loadsASCE; MBMA guide spec 1.4
AISC 360360-22Hot-rolled and built-up primary frames, by LRFD or ASDAISC; MBMA guide spec 1.3 A
AISI S100S100-16 (2020) with S2-20Cold-formed purlins, girts and eave strutsMBMA guide spec 1.3 C
AISC Design Guide 32nd edition, 2003Serviceability: deflection and drift choicesMBMA guide spec 1.3 B
AWS D1.1 and D1.3D1.1:2020; D1.3:2018Welding of plate frames and of sheet steelMBMA guide spec 1.3
MBMA Metal Building Systems Manual2024Load combinations practice, crane guidance, nomenclature, climatological dataMBMA Design Resources
IAS AC4722023 criteriaAccreditation of the manufacturer’s design and fabrication inspection programIAS; MBMA guide spec 1.7 A

Edition matters because states and cities adopt codes on their own schedule. MBMA Common Industry Practices Section 3.2.1 makes the owner, or the owner’s design professional, responsible for naming “the applicable code or standard, including the specific edition”. Wind provisions for Broward and Miami-Dade are stricter again; our guide to high-velocity hurricane zone construction covers them. Insulation and air leakage follow the energy code your state adopted, which our commercial energy code by state report tracks.

Who is responsible for what on a PEMB order?

Four parties split a PEMB: the owner (MBMA’s “End Customer”) sets design criteria, the builder orders the system, the manufacturer designs and fabricates it, and the erector assembles it. MBMA Common Industry Practices (2024 edition, Section 1.2) defines each role and says the builder “is an independent contractor and is not an agent for the Manufacturer”.

Seven steps from design criteria to special inspection on a PEMB order How a PEMB order moves from design criteria to inspection 1. Set design criteriaCode + edition, loads,drift and deflection limits 2. Builder ordersOrder documents carryevery load to the plant 3. Manufacturer designsEngineer seals Letterof Certification + calcs 4. Anchor rod planLocation, diameter,projection only 5. FabricationAC472-accredited plant,IAS audit each year 6. ErectionOSHA 1926.758,RCSC bolt tightening 7. Special inspectionIBC 2024 Section 1705.2.6before final approval Sources: MBMA Common Industry Practices (2024 ed.), 3.2 to 3.3; IAS; OSHA 29 CFR 1926.758; ICC.
The seven steps of a PEMB order and who owns each, from MBMA Common Industry Practices (2024 edition) Sections 3.2 to 6.4, OSHA 1926.758 and IBC 2024 Section 1705.2.6 (accessed October 20, 2026).
  1. Set design criteria. The owner or engineer of record supplies the code and edition, building geometry, all loads (live, snow, wind, tornado, seismic, collateral, auxiliary), risk category and exposure factors, and serviceability limits (MBMA CIP 3.2.1, items 1 to 9).
  2. Builder orders. The builder passes every criterion to the manufacturer in the order documents. Under Section 3.2.1, item 3, “the Manufacturer assumes that no such loads or conditions exist” unless they are written in.
  3. Manufacturer designs. The manufacturer’s engineer seals the Letter of Certification and calculations listing codes, standards and loads (CIP 3.3.2).
  4. Anchor rod plan. The manufacturer issues rod location, diameter and projection only; a local engineer designs footings, embedment and slab (CIP 3.2.2).
  5. Fabrication. Frames and cold-formed parts are made at a plant; every MBMA manufacturer member is AC472 accredited and IAS audits member plants annually (MBMA Accreditation).
  6. Erection. The erector checks concrete dimensions and anchor rod locations before setting steel (CIP 6.4), then erects to OSHA 1926.758 and tightens bolts per the RCSC specification (MBMA guide spec 3.2 E).
  7. Special inspection. The approved agency inspects the erected system under IBC 2024 Section 1705.2.6 before final approval.

Errors in the slab, foundation or anchor rods are costly for the owner. CIP Section 6.4 says the owner pays “all additional costs resulting from errors in the concrete slab and foundation or in the setting of anchor rods”, except where the builder built that work. When one firm carries design and construction under a single contract, our page on design-build contractors explains how that changes the chain.

What loads and stiffness limits should the owner specify?

The order must carry every load beyond the frame’s own weight, plus the stiffness the walls and roof need. The MBMA guide specification (August 2026, Section 1.4) sets a 20 psf minimum roof live load, reducible per code, and leaves blanks for collateral load (sprinklers, mechanical and electrical systems, ceilings), solar-ready load, snow, wind, rain, tornado and crane loads.

The arithmetic below uses the published roof example in the MBMA Roof Framing Design Guide (2024, Section 5.5.4.7): four 25 ft bays, 12 purlin lines at 5 ft on center, 8ZS2.75×085 purlins in the end bays and 8ZS2.75×059 in the interior bays, a 1/2:12 slope, 3 psf dead load and 20 psf live load. The 5 psf collateral row is a CB&C illustration of an owner-supplied value, not a code minimum.

StepInputsArithmeticResultSource
Purlin line load, MBMA example3 psf dead + 20 psf live, 5 ft spacing(3 + 20) x 5115 plfMBMA Roof Framing Design Guide 5.5.4.7
Add 5 psf collateral (illustration)3 + 5 + 20 psf, 5 ft spacing(3 + 5 + 20) x 5140 plf, 21.7% moreCB&C arithmetic
Load on one interior rafter, no collateral23 psf, 25 ft bay23 x 25575 plfCB&C arithmetic
Load on one interior rafter, with collateral28 psf, 25 ft bay28 x 25700 plfCB&C arithmetic
Purlin deflection allowed at L/150 (dead plus snow, or 10-year wind)25 ft span = 300 in.300 / 1502.0 in.MBMA guide spec 1.4 O

The point of the arithmetic: 5 psf left off the order is a 21.7% heavier purlin load that nobody designed for. MBMA guide specification Section 1.4 E also bars applying collateral loads to roof panels, so hanging items must land on purlins or frames.

Stiffness is the second half. A drift limit caps how far the eave may sway in wind as a fraction of eave height H, so H/100 on a 20 ft (240 in.) eave allows 2.4 in.; a deflection limit does the same for sag along a member’s span L. The MBMA guide specification lists drift options of H/60, H/100, H/200 and H/400 for 10-year wind and notes that “H/60 or H/100 is common for metal wall panels”, while masonry, concrete or glass “may require lower allowable drift limits”. UFGS 13 34 19 (August 2026, Section 1.6.3) sets H/480 for federal work.

LimitApplies toSway or sag at a 20 ft eave or 25 ft spanSource
H/60Drift, 10-year wind, metal walls4.0 in.MBMA guide spec 1.4 P
H/100Drift, 10-year wind, metal walls2.4 in.MBMA guide spec 1.4 P
H/200Drift, 10-year wind1.2 in.MBMA guide spec 1.4 P
H/400Drift, 10-year wind0.6 in.MBMA guide spec 1.4 P
H/480Drift, 10-year MRI wind, federal projects0.5 in.UFGS 13 34 19, 1.6.3
L/180Primary frame, roof snow1.67 in. per 25 ft of spanMBMA guide spec 1.4 O
L/90Wall girts, 10-year wind3.33 in.MBMA guide spec 1.4 O
L/60Metal panels, 10-year wind5.0 in.MBMA guide spec 1.4 O
How far a 20 ft tall PEMB wall may sway in a 10-year windBar chart: at a 20 ft eave, H/60 allows 4.0 in. of drift, H/100 2.4 in., H/200 1.2 in., H/400 0.6 in. and the federal H/480 limit 0.5 in.in.H/60 (MBMA option, metal walls)4H/100 (MBMA option, metal walls)2.4H/200 (MBMA option)1.2H/400 (MBMA option)0.6H/480 (UFGS 13 34 19, federal)0.5
A federal H/480 drift limit allows one eighth of the sway of H/60 at a 20 ft eave: 0.5 in. against 4.0 in. (MBMA guide specification and UFGS 13 34 19, both August 2026; CB&C arithmetic).

How is a pre-engineered metal building erected and inspected?

Erection of a pre-engineered metal building falls under OSHA 29 CFR 1926.758, which applies the steel erection subpart except the general column anchorage rule (1926.755) and the open web joist rule (1926.757). Inspection falls under IBC 2024 Section 1705.2.6, which MBMA Common Industry Practices describes as new special inspection requirements for metal building systems.

OSHA 1926.758 text with paragraphs (a), (b) on four anchor rods and (c) on 50 percent of frame bolts boxed
OSHA 29 CFR 1926.758, paragraphs (a) to (c): the 1926.755 exclusion, the 4-anchor-rod minimum and the 50 percent bolt rule before hoist release (osha.gov, accessed October 20, 2026).
  • 1926.758(b): each structural column is anchored by at least 4 anchor rods.
  • 1926.758(c): rigid frames have 50 percent of their bolts, or the manufacturer’s number if greater, installed and tightened on both sides of the web at each flange before hoisting equipment is released.
  • 1926.758(e): where girts or eave struts share connection holes, at least one bolt with its wrench-tight nut stays on the first member, unless a manufacturer-supplied seat secures it.
  • 1926.758(g) and (h): purlins and girts are not fall-arrest anchorages without written approval from a qualified person, and purlins are walked on only to install safety systems after permanent bridging and fall protection are in place.

The MBMA guide specification adds two erection rules owners can write into the contract: bracing furnished by the manufacturer “cannot be assumed to be adequate during erection” (Section 3.2 F1), and no field cutting or modifying of structural members without the manufacturer’s approval (Section 3.2 G). Fabrication tolerances are published too: MBMA CIP Table 9.1 allows plus or minus 1/8 in. on cold-formed member length and a minimum thickness of 0.95 times design thickness.

Plan the special inspection at permit stage. The ICC Statement of Special Inspections template now carries a “Metal Building Systems (1705.2.6)” line, and IBC Section 1704.2.5.1 lets a building official accept an approved fabricator in place of in-plant inspection; IAS says AC472 ties to IBC Chapter 17. Our guide to commercial building permits explains when the statement is filed.

How does a PEMB compare with conventional structural steel?

The difference is who designs the system and which members carry the roof. A PEMB is designed by its manufacturer as one package of tapered plate frames and cold-formed purlins and girts (MBMA Common Industry Practices, Section 3.3.2); a conventional steel building is designed by the project’s engineer of record from rolled shapes, joists and deck sourced from several suppliers.

ItemPre-engineered metal buildingConventional structural steelSource
Structural designerManufacturer’s engineer, sealing for the system onlyProject engineer of recordMBMA CIP 3.3.2
Primary membersBuilt-up tapered I frames, 50 or 55 ksi plateRolled wide-flange beams and columnsMBMA guide spec 2.1
Roof framingLapped cold-formed Z purlins, AISI S100Steel joists (SJI 100) and roof deckMBMA guide spec 2.2; MBMA Roof Framing Design Guide
SupplySingle source for frame, secondary and panelsSeparate fabricator, joist and deck suppliersMBMA guide spec 1.4 A
OSHA erection rule29 CFR 1926.75829 CFR 1926.755 column anchorage and the rest of Subpart ROSHA
Plant credential to ask forIAS AC472Approved fabricator per IBC 1704.2.5.1, or in-plant special inspectionIAS; ICC
Shell schedule claim30 to 50% less time than competing framing (MBMA claim)Set by design, detailing and fabrication queueMBMA

Neither system is limited to a plain metal look: UFGS 13 34 19 (Section 2.3.2) lists load-bearing wall and multistory configurations, and many PEMB shells carry masonry or concrete walls, which is where the drift limit in the previous section matters. For concrete shells on large distribution buildings, our guide to tilt-up construction compares the code paths, and the shell trade-offs for storage and logistics are on our warehouse construction page.

What does a PEMB cost, and what moves the price?

In federal purchase records that state the size, a pre-engineered metal building package cost $16.17 to $17.30 per sq ft for 1,200 to 8,000 sq ft buildings (2021 to 2024), and an erected 1,440 sq ft PEMB shell cost $50.20 per sq ft in 2023. The BLS index for complete metal building systems (WPU107901) rose 4.7% in the 12 months to September 2026.

RecordScopePer sq ftDateSource
80 x 100 x 20 ft metal building, 8,000 sq ft, Federal Law Enforcement Training CenterPackage$16.17Jun 2021USAspending
48 x 30 x 13 ft PEMB, 1,440 sq ft, USDA Agricultural Research Service, CaliforniaErected shell$50.20Sep 2023USAspending
10,023 sq ft insulated pre-engineered building, U.S. Fish and Wildlife Service, TexasSlab, delivery, erection, insulation$122.10Sep 2025USAspending

These are federal awards, which can carry prevailing wages and vendor margins; all ten records we found, with sizes and finished-building ranges, are in our guide to steel building prices. Steel moved faster than the package: Bureau of Labor Statistics data show steel mill products (WPU1017) at 388.580 in September 2026 (preliminary), up 27.6% from 304.579 a year earlier (BLS PPI, re-checked October 26, 2026).

BLS seriesIDSept 2025Sept 2026 (P)12-month change
Prefabricated metal building systems (complete packages)WPU107901594.686622.532+4.7%
Steel mill productsWPU1017304.579388.580+27.6%
Hot rolled bars, plates and structural shapesWPU101704277.952319.693+15.0%
Fabricated structural metalWPU107405359.691380.544+5.8%

Design inputs move weight, and weight moves price. In the MBMA roof example, adding 5 psf of collateral load raises the purlin line load from 115 to 140 plf, and a drift limit tightened from H/100 to H/400 cuts allowed sway from 2.4 in. to 0.6 in. at a 20 ft eave, which needs stiffer frames. An expandable endwall in UFGS 13 34 19 (Section 1.4.3) carries full-bay loads against one-half of a bay load for a fixed endwall frame. Monthly series are tracked in our commercial construction price index.

What do common guides get wrong about PEMBs?

Several top-ranking guides blur three points: what “pre-engineered” means, who carries engineering responsibility, and how fast a PEMB is. The table sets five claims, described neutrally, against the primary document that answers it, so an owner can quote the source in a bid review.

What several guides sayWhat the primary source saysSource
A reference encyclopedia entry describes a pre-engineered building as one supplier design built many times.Each order is designed to the loads and code edition in its order documents, and the design is sealed by an engineer registered where the building stands.MBMA CIP 3.2.1, 3.3.2
Manufacturer guides say a PEMB is built in “half the time” of conventional construction.MBMA’s own figure is 30 to 50 percent less time for the shell, compared with competing framing systems.MBMA
Guides imply the manufacturer’s engineer is the project engineer.Sealed calculations do not make the manufacturer’s engineer the engineer of record, and the manufacturer is not responsible for foundation design.MBMA CIP 3.2.2, 3.3.2
Guides list purlins and girts as minor secondary parts.Purlins are “the primary load carrying components of the roof system”; secondary refers only to their place in the whole building.MBMA Roof Framing Design Guide, Ch. 1
Guides apply the general OSHA column anchorage rule, 1926.755, to metal buildings.1926.758(a) excludes 1926.755 for systems-engineered metal buildings; 1926.758(b) sets the 4-rod minimum.OSHA 1926.755; OSHA 1926.758

Should your project use a pre-engineered metal building?

A pre-engineered metal building fits low-rise projects with repeating frame bays and a simple roof shape, where the owner can fix loads and openings before fabrication. Bridge cranes in severe or continuous severe service (Service Class E or F, which the MBMA guide specification sends to the AIST TR-13 mill building guide) and brittle wall finishes are the two conditions that change the design most.

Decision flowchart: when a pre-engineered metal building fits a project Does a pre-engineered metal building fit the project? Low-rise building with repeatingframe bays and a simple roof shape? Price conventionalstructural steel, tilt-upor concrete as well Crane design toAIST TR-13; priceconventional steel too No Bridge cranes in ServiceClass E or F (severe orcontinuous service)? Yes Yes Walls of masonry, concreteor glass attached tothe frame? No PEMB with a lower drift limitsuch as H/200 or H/400,set by the EOR (AISC DG3) PEMB with H/60 to H/100drift for metal wall panels(MBMA guide spec, Aug 2026) Yes No Sources: MBMA Performance Guide Specification, Sections 1.4 N to P (Aug 2026); UFGS 13 34 19 (Aug 2026).
Three questions that decide whether a PEMB fits and which drift limit to order, based on the MBMA Performance Guide Specification Sections 1.4 N to P and UFGS 13 34 19 (both August 2026).
IfThenRule or source
The building is low-rise with repeating bays of 20 to 30 ft and a single or multiple gable roofPrice a PEMB; it is the standard case in UFGS 13 34 19UFGS 13 34 19, 1.4.6, 2.3.2
The roof shape or framing is irregularPrice conventional structural steel, tilt-up or concrete as wellMBMA guide spec 1.4 A (single-source system)
Bridge cranes are in Service Class E or FRequire crane design to AIST TR-13 and price conventional steel tooMBMA guide spec 1.4 N
Walls are masonry, concrete or glassHave the engineer of record set a lower drift limit, such as H/200 or H/400, in the orderMBMA guide spec 1.4 P; AISC Design Guide 3
Walls are metal panelsH/60 to H/100 drift is the common rangeMBMA guide spec 1.4 P
The project is federalPlan for H/480 drift and an MBMA-member manufacturer with at least 5 years of experienceUFGS 13 34 19, 1.6.3
Sprinklers, ducts, ceilings or solar may be added laterWrite collateral and solar-ready loads in psf into the order nowMBMA guide spec 1.4 E, F; MBMA CIP 3.2.1
The building may growSpecify an expandable endwall frame for full-bay loadsUFGS 13 34 19, 1.4.3

For ground-up projects where the structural system is still open, our guide to new commercial construction sets PEMB beside steel, concrete, masonry and tilt-up. CB&C is a matching service, not a contractor or engineer, and this page is not engineering advice; the engineer of record for your project confirms loads and limits.

Buying a packaged building is covered in our metal building kits guide, and the choice of frame material in our red iron building guide.

How we compiled this

We read 13 primary documents in October 2026: the MBMA Performance Guide Specification (August 2026), MBMA Common Industry Practices (2024 edition), the MBMA Roof Framing Design Guide (2024), MBMA and IAS accreditation pages, OSHA 29 CFR 1926.758 and 1926.755, UFGS 13 34 19 (August 2026), the ICC special inspection template, ASCE and AISC standard pages, and the BLS producer price file. On October 26, 2026 we added federal award records from USAspending.gov for the price section. The ICC code text was not reachable without a CAPTCHA, so IBC section citations come from MBMA and ICC documents that quote them. Arithmetic rows labeled CB&C are our calculations from the inputs shown.

Frequently asked questions

What is the difference between a pre-engineered metal building and a regular steel building?

A pre-engineered metal building is designed by its manufacturer as one system of tapered plate frames, cold-formed purlins and girts, and panels, sealed by the manufacturer’s engineer under MBMA Common Industry Practices Section 3.3.2. A conventional steel building is designed by the project’s engineer of record from rolled shapes, joists and deck, and its erection falls under OSHA 1926.755 rather than 1926.758.

Do pre-engineered metal buildings meet building codes?

Yes, when the order names the adopted code and edition. MBMA says its 2024 Metal Building Systems Manual conforms to the 2024 IBC and ASCE 7-22, and its August 2026 guide specification references AISC 360-22 and AISI S100. The owner supplies the code, loads and factors; MBMA Common Industry Practices Section 3.2.1 says the manufacturer assumes no load that is not written into the order.

What is the framing system in a pre-engineered metal building?

Primary framing is rigid frames: built-up tapered I-section columns and rafters of 50 or 55 ksi plate, designed to AISC 360-22. Secondary framing is cold-formed Z or C purlins, girts and eave struts of Grade 55 steel, designed to AISI S100, with rod or cable X-bracing in braced bays, per the MBMA Performance Guide Specification (August 2026).

How long does it take to build a pre-engineered metal building?

MBMA states a metal building shell can be completed in 30 to 50 percent less time than competing framing systems. That figure covers the shell only. Foundations, the special inspection required by IBC 2024 Section 1705.2.6, fabrication queue and interior work add to the schedule, so ask each bidder for fabrication and delivery dates in writing.

Who designs the foundation for a pre-engineered metal building?

A local engineer hired by the owner or builder designs it, not the manufacturer. MBMA Common Industry Practices Section 3.2.2 says the manufacturer’s anchor rod plan shows only rod location, diameter and projection. OSHA 1926.758(b) requires at least 4 anchor rods per column, and Section 6.4 puts the cost of anchor rod errors on the owner unless the builder did that work.

What is a collateral load on a metal building?

Collateral load is the weight of permanent items hung from the structure other than the building itself: sprinklers, mechanical and electrical systems and ceilings, per the MBMA guide specification (August 2026, Section 1.4 E). It is written in psf on the order and is not applied to roof panels. In the MBMA roof example, 5 psf of collateral raises purlin load from 115 to 140 plf.

How much does a pre-engineered metal building cost?

In federal purchase records, the PEMB package alone cost $16.17 to $17.30 per sq ft for 1,200 to 8,000 sq ft buildings bought from 2021 to 2024. An erected 1,440 sq ft shell cost $50.20 per sq ft in 2023, and a 10,023 sq ft insulated building with its slab cost $122.10 per sq ft in 2025. Loads, size and finish move the number.

Sources

Last reviewed October 2026 by the CB&C Editorial Team. See our editorial standards.