Steel Building Prices: Sourced Costs per Sq Ft and What Moves Them
Federal purchase records put steel building packages at $16 to $17 per sq ft and erected buildings at $50 to $123 per sq ft; the BLS package index…
-

Commercial Kitchen Fire Suppression System: Code Rules, Service and Prices
IFC 904.13 and IMC 507 rules, the 6-month service and fusible link intervals by code edition, Class K counts and 14 federal price records for a commercial kitchen…
-

Commercial Kitchen: What Legally Counts and What It Takes to Build One
Only 11 of 64 state food agencies enforced the 2022 FDA Food Code at the end of 2024, so a commercial kitchen is built to whichever edition its…
-

Pre-Engineered Metal Building: Frames, Purlins, Girts and the Codes Behind Them
A pre-engineered metal building is a manufacturer-designed steel system of tapered frames and cold-formed purlins and girts, now subject to IBC 2024 Section 1705.2.6 special inspection.
-

Steel Building Insulation: What the Energy Code Requires, Zone by Zone
Steel building insulation is set by an assembly U-factor: ASHRAE 90.1-2022 caps a conditioned zone 4 metal roof at U-0.037, which a single R-19 blanket on a through-fastened…
-

Notice of Commencement in Florida: Thresholds, Form, Recording and Expiry
Florida requires a recorded notice of commencement above a $2,500 direct contract, with a building-department copy above $5,000, under Fla. Stat. 713.13 and 713.135.
-

Building Commissioning: What It Is, When Code Requires It and What It Costs
Building commissioning tests HVAC, water heating and lighting controls against the owner’s requirements; the 2024 IECC requires it from 10,000 sq ft, at an LBNL median $1.03 per…
-

AIA G702 Application and Certificate for Payment: Every Line, a Worked Example and the A201 Pay Cycle
The AIA G702 turns G703 totals into the current payment due across 9 lines; the architect has 7 days under A201-2017 to certify it.
-

AIA A201-2017 General Conditions: Articles, Deadlines and What Owners Change
AIA A201-2017 has 15 articles, a 21-day claim notice rule and a 14-day concealed-conditions notice, and two public owners we compared edited it very differently.
-

Lien waiver: conditional vs unconditional, the 4 types and state forms
A lien waiver trades lien rights for a payment; 11 states print the form in their statutes, and the conditional or unconditional choice decides whether you are protected…