Commercial Construction Blog
Practical guides for project owners, plus industry news, jobsite culture, safety and careers for the people who build.
Browse by topic: Owner guides · Industry and culture · Florida construction · Research · All guides
-

Builder’s Risk Insurance for Commercial Projects: Who Buys It, What It Covers and What It Costs
Builder’s risk insurance explained from AIA Exhibit A, three public policies and Florida school board rates of 0.5445% to 0.935%.
-

Bid Bond: What It Guarantees, How Much It Is and What Happens on Default
Federal construction bids over $150,000 need a bid bond of at least 20% of the bid price, capped at $3 million, on Standard Form 24.
-

Preconstruction Services: What Owners Get, Sign and Pay For
Preconstruction services are the estimates, constructability reviews, schedules and long-lead planning a builder delivers during design, bought under AIA A133, ConsensusDocs 500 or state CMAR statutes.
-

RFI in Construction: What Goes in One, What A201 Says and When It Becomes a Change Order
AIA A201-2017 sets no fixed RFI response time; published benchmarks run 7.1 to 13.9 days, and about 17% of RFIs became contract modifications in a WisDOT study.
-

Tilt-Up Construction: How It Works, Step by Step, and the Rules Behind It
Tilt-up construction casts concrete wall panels flat on site and lifts them by crane; OSHA 29 CFR 1926.704 requires tilt-up inserts rated at 2 times the maximum intended…
-

Certificate of Occupancy for Commercial Buildings: How to Get One, Time, Cost and TCOs
A certificate of occupancy is issued after final inspections and is required before a new building or change of use opens; Philadelphia charges $253 per space for a…
-

Substantial Completion in Construction: AIA §9.8, the G704 and the Clocks It Starts
Substantial completion under AIA A201-2017 §9.8 starts warranties, retainage release and a 10-year claims cap; Florida’s repose now runs from the certificate of occupancy.
-

Phase 1 Environmental Site Assessment: Cost, Timing, the 180-Day Rule and SBA Triggers
A Phase I ESA costs about $2,000 to $3,500 in published estimates, takes 10 to 15 business days, and five of its parts must fall within 180 days…
-

Schedule of Values: How to Build, Bill and Review One
A worked $2.4 million schedule of values with G703 column math, 10 percent retainage, a priced front-loading example and review thresholds from AIA, FAR and FDOT.
-

AIA Contract Documents: Which Forms Go Together and What They Cost
The AIA’s A to G document series, the 13 key commercial forms with current editions and one-time prices, how they pair by delivery method, and the ConsensusDocs alternative.