Commercial Construction Blog
Practical guides for project owners, plus industry news, jobsite culture, safety and careers for the people who build.
Browse by topic: Owner guides · Industry and culture · Florida construction · Research · All guides
-

3 Phase Power: What It Is, How to Size It and What It Costs
Three-phase power explained for commercial buildings, with ANSI C84.1 voltage ranges, a worked load calculation and dated utility fees.
-

Knox Box: When the Fire Code Requires One, Where It Goes and What It Costs
A Knox box is a fire department key box required under IFC 506.1 on most sprinklered or alarmed commercial buildings, mounted 42 inches to 7 feet up depending…
-

Concrete PSI: Which Strength Commercial Concrete Needs and What It Costs
Concrete psi minimums run from 2,500 psi with no exposure to 5,000 psi for deicing salt, and 2026 public bids priced each 500 psi step at $2 to…
-

Concrete Curing Time: When to Walk, Strip Forms, Load and Lay Flooring
Concrete curing time is 7 days under ACI 301 (3 for Type III cement), with design strength tested at 28 days and flooring gated by a 75 percent…
-

Stair Riser Height: Commercial Stair Code Requirements Under IBC 1011
Commercial stair risers must be 4 to 7 inches with 11 inch treads under IBC 1011.5.2; here is how IRC, OSHA and ADA limits compare, with a worked…
-

Construction Schedule: How to Build One, Find the Critical Path and Keep It Current
How a commercial construction schedule is built and enforced: a 13-activity critical path example, a copyable template, planned durations from 17,587 Texas registrations and the schedule clauses in…
-

ADA Bathroom Requirements: Every Dimension for a Commercial Restroom
ADA bathroom requirements in one place: turning space, toilet and grab bar dimensions by code section, plus what 36 Texas restroom retrofits cost per sq ft.
-

Fire Rated Wall Guide: Fire Walls, Barriers, Partitions and Smoke Barriers
IBC Chapter 7 sorts fire rated walls into fire walls, fire barriers, fire partitions and smoke barriers, rated from 1/2 hour to 4 hours, with UL U419 the…
-

Occupancy Classification: IBC 2024 Groups, Occupant Load and What Each Group Triggers
The 2024 IBC sorts every space into 10 occupancy groups and 26 classifications, and the group sets the occupant load factor, the sprinkler trigger and the number of…
-

Types of Construction: IBC Types I to V Explained
The IBC sorts buildings into Types I to V with 12 subtypes; a Group B building values at $301.40 per sq ft in Type I-A and $209.02 in…