Metal building sizes for commercial use run from 30 x 60 ft shops to warehouses over 300 ft wide: clear spans of 20 to about 150 ft, eave heights of 16 to 28 ft and 20 to 30 ft bays.
Key takeaways
- Width is measured steel line to steel line (outside face of sidewall girts) and eave height from finished floor to the top of the eave strut, per the Nucor Building Systems Specification Guide, Section 1.2.
- Federal guide specification UFGS 13 34 19 (August 2026) offers eave heights of 16, 20, 24 or 28 ft and bay spacings of 20, 25 or 30 ft, so lengths step in those increments.
- Clear-span rigid frames are used from 40 ft to over 150 ft wide; frames with interior columns pay off from 80 ft to over 300 ft wide (Nucor guide, Section 1.3.1).
- Under the 2024 International Building Code, Section 903.2, a storage (S-1), factory (F-1) or retail (M) fire area over 12,000 sq ft needs automatic sprinklers, whatever the frame.
- An unsprinklered one-story Type IIB steel building is capped at 12,500 sq ft for retail, 17,500 sq ft for storage and 9,500 sq ft for a church by IBC Table 506.2.
What are the standard metal building sizes?
There is no code list of standard metal building sizes. Manufacturers build to any width and length, but quotes cluster around widths in 10 ft steps (30, 40, 50, 60, 80, 100 ft), lengths that are a whole number of 20, 25 or 30 ft bays, and eave heights from 14 to 28 ft. The chart below gives the common commercial footprints with floor area, a bay layout and the frame type that fits each width.
The code column uses storage (Group S-1) because it is the most common metal building use; the use table further down gives the limits for shops, retail and churches. Our metal building kit guide covers what a kit at each size includes and costs.
| Size (width x length) | Floor area | Example bay layout | Frame that fits the width | Typical commercial fit (editorial) | Storage (S-1) code status, 2024 IBC |
|---|---|---|---|---|---|
| 30 x 60 ft | 1,800 sq ft | 3 bays at 20 ft | Tapered beam, 20 to 60 ft | Contractor shop, equipment storage | Below sprinkler and area triggers |
| 40 x 60 ft | 2,400 sq ft | 3 bays at 20 ft | Tapered beam or rigid frame | 2 to 3 bay repair shop, small retail shell | Below triggers |
| 50 x 100 ft | 5,000 sq ft | 4 bays at 25 ft | Rigid frame, 40 to 150 ft | Flex warehouse, small church | Below triggers (churches: check occupants) |
| 60 x 100 ft | 6,000 sq ft | 4 bays at 25 ft | Rigid frame | Shop with office, retail store | Below triggers |
| 60 x 120 ft | 7,200 sq ft | 4 bays at 30 ft | Rigid frame | Distribution, fabrication shop | Below triggers |
| 80 x 100 ft | 8,000 sq ft | 4 bays at 25 ft | Rigid frame | Warehouse, church with fellowship hall | Below triggers |
| 80 x 150 ft | 12,000 sq ft | 6 bays at 25 ft | Rigid frame | Warehouse, big-box retail shell | At the 12,000 sq ft line; sprinklers start above it |
| 100 x 150 ft | 15,000 sq ft | 6 bays at 25 ft | Rigid frame | Warehouse, manufacturing | Sprinklers required (fire area over 12,000) |
| 100 x 200 ft | 20,000 sq ft | 8 bays at 25 ft | Rigid frame | Warehouse, manufacturing | Sprinklers; over the 17,500 sq ft unsprinklered cap |
| 150 x 300 ft | 45,000 sq ft | 12 bays at 25 ft | Rigid frame (upper end) or modular | Distribution warehouse | Sprinklered cap 70,000 sq ft: passes |
| 200 x 400 ft | 80,000 sq ft | 16 bays at 25 ft | Modular, 80 to 300 ft and over | Regional distribution | Over 70,000: needs frontage increase or unlimited-area rules |
Floor area is width times length at the steel line. Frame ranges come from Nucor guide Section 1.3.1; code status comes from IBC 2024 Section 903.2.9 and Table 506.2 for a one-story Type IIB building, accessed November 21, 2026.
How are width, length and eave height measured?
Metal building dimensions are nominal steel-line numbers, not clear inside dimensions. Width runs from the outside face of one sidewall girt to the outside face of the other, length runs the same way between endwall girts, and eave height runs from finished floor to the top of the eave strut. Usable clear height under the rafter haunch is lower than the eave height, so state clear height separately when racking, cranes or doors depend on it.
| Dimension | How it is measured | Source |
|---|---|---|
| Width | Outside face of sidewall girt to outside face of sidewall girt (steel line to steel line) | Nucor guide 1.2.1 |
| Length | Outside face of endwall girt to outside face of endwall girt | Nucor guide 1.2.2 |
| Eave height (manufacturer) | Finished floor to top of eave strut or purlin at the steel line, even with curbs or column recesses | Nucor guide 1.2.3 |
| Eave height (federal spec) | Finished floor to the line where the roof and wall planes intersect | UFGS 13 34 19 1.3 c |
| Bay | Center to center of primary frames for interior bays; end bay from steel line to center of first interior frame | Nucor guide 1.2.4; UFGS 1.3 a |
| Roof slope | Rise per 12 in of run; minimum 1/4 in per 12 for standing seam, 1/2 in per 12 for through-fastened panels | Nucor guide 1.2.6 |
| Size notation | Usually width x length x eave height, such as 30 x 60 x 14; confirm which number is the frame span | Federal award text (table below) |
Roof pitch sets the ridge height. On a 60 ft wide gable at 1:12, each half rises 30 ft x 1/12 = 2.5 ft, so a 20 ft eave gives a 22.5 ft ridge. The two eave definitions differ by the depth of the roof build-up at the eave, so put the definition in the purchase order. Our pre-engineered metal building guide explains the frame parts these dimensions are measured to.
Which sizes have public owners ordered?
Federal award records on USAspending.gov name the size in the award text, which shows how buyers write the dimensions. Two of the seven records below put the length first (48 x 30, 100 x 30) and a third (120 x 45 clear span) does not say which number is the span, so read every quote for the frame span. Our steel building prices guide covers what these orders cost.
| Size as written | Floor area | Use | Agency, date | Record |
|---|---|---|---|---|
| 30 x 60 x 14 steel building kit | 1,800 sq ft | Kit supply | Defense Logistics Agency, Feb 2019 | SPE8E319FJB4W |
| 48 x 30 x 13 pre-engineered metal building | 1,440 sq ft | Farm equipment storage | USDA, Sep 2023 | 12905B23P0264 |
| 40 x 60 pre-engineered steel building | 2,400 sq ft | Construction | USDA, Aug 2019 | 12639519C0067 |
| 100 x 30 steel building kit | 3,000 sq ft | Kit with design and delivery, Cedar City, UT | Bureau of Land Management, Dec 2018 | 140L5719F0004 |
| 50 x 100 pre-engineered metal building | 5,000 sq ft | Training building, Beckley, WV | Department of Labor, Sep 2021 | 1605C421C0006 |
| 120 x 45 clear span pre-engineered metal building | 5,400 sq ft | Non-occupied building | Department of Defense (Air Force office), Apr 2020 | FA820120P0021 |
| 110 x 200 pre-engineered building | 22,000 sq ft | Tank and vehicle storage | Department of Defense (Army office), Sep 2018 | W9136418F0160 |
Why do metal building widths and lengths step the way they do?
Lengths step by the bay: a building is a row of identical frames, so 100 ft is four 25 ft bays and 120 ft is four 30 ft bays or six 20 ft bays. Widths step by frame type: a tapered beam frame covers 20 to 60 ft, a clear-span rigid frame 40 ft to over 150 ft, and a frame with interior columns 80 ft to over 300 ft, per Nucor guide Section 1.3.1.
The 10 ft width steps on seller charts are a quoting habit, not a structural rule; a 64 ft frame is as buildable as a 60 ft one. Panel width does not explain the steps either: at the 36 in net coverage of a common through-fastened wall panel (Nucor guide 11.3.1), a 60 ft endwall takes exactly 20 panels and a 50 ft endwall takes 16.67, so one panel is field cut.
| Limit | Value | What it means for size | Source |
|---|---|---|---|
| Tapered beam frame (TCG) | 20 to 60 ft wide | Small shops; straight columns, flat bottom rafter | Nucor guide 1.3.1.2 |
| Rigid clear-span frame (RCG) | 40 ft to over 150 ft | No interior columns; the default for warehouses and churches | Nucor guide 1.3.1.1 |
| Rigid frame with interior columns (RMG-X) | 80 ft to over 300 ft | Cheaper steel when interior columns are acceptable | Nucor guide 1.3.1.3 |
| Through-fastened roof panel | 240 ft gable, 120 ft single slope | Maximum recommended width on Z purlins | Nucor guide 6.1.2 |
| Cold-formed purlins, no expansion joint | 640 ft with metal walls | Longer buildings need a longitudinal expansion joint | Nucor guide Section 15 |
| Bay spacing options | 20, 25 or 30 ft | Longer “long bay” layouts switch purlins to bar joists | UFGS 13 34 19 1.4.6; Nucor 5.3.2 |
| Purlin spacing for rated roof uplift | 5 ft 0 in on center or less | UL 580 Class 90 and FM 1-120 ratings for the 26 ga panel | Nucor guide 6.1.3, 6.1.4 |
Frame design itself follows AISC 360 for hot-rolled and built-up members and AISI S100 for cold-formed purlins and girts (Nucor guide 2.1), with industry practices set by the MBMA Metal Building Systems Manual, 2024 Edition. Our red iron building guide compares the I-beam frames above with tube-steel kits that stop at much smaller spans.
What eave height does a commercial metal building need?
Pick eave height from what has to fit inside: the tallest door, the top of storage and any crane. UFGS 13 34 19 offers 16, 20, 24 and 28 ft as standard choices. Two code lines sit inside that range: storage piled above 12 ft becomes high-piled storage under the fire code, and a 24 ft clear height lets a sprinklered one-story warehouse stretch exit travel distance to 400 ft.
| Eave or clear height | What it allows or triggers | Rule | Source |
|---|---|---|---|
| 14 ft door opening | Drive-in trailer door; the eave must clear the door plus its header framing, so a 14 ft eave is too low | Door height from our door guide; header from the maker’s framed-opening detail | CB&C door sizes |
| Top of storage over 12 ft | High-piled combustible storage; over 6 ft for tires, Group A plastics or idle pallets where the fire code official requires | IFC 2024 Section 202; Chapter 32 applies | IFC 2024 Ch. 2 |
| 24 ft to underside of roof deck | Exit access travel distance of 400 ft instead of 250 ft in F-1 or S-1, one story, sprinklered | IBC 1017.2.2 | IBC 2024 Ch. 10 |
| 20 ft eave, metal walls | Frame may sway up to 4.0 in in wind (H/60 = 240 in / 60) | Manufacturer drift standard | Nucor guide Sec. 14 |
| 20 ft eave, pinned-base masonry walls | Sway limited to 2.4 in (H/100), so a stiffer, heavier frame | Manufacturer drift standard | Nucor guide Sec. 14 |
| 55 ft (unsprinklered) or 75 ft (sprinklered) | Height cap for Type IIB in Groups A, B, F, M and S; far above normal eaves | IBC Table 504.3 | IBC 2024 Ch. 5 |
Mezzanines are the other way to use a tall eave. IBC 2024 Section 505.2.1 caps the mezzanines in a room at one-third of that room’s floor area, so a 60 x 100 ft shop can hold up to 2,000 sq ft of mezzanine office without the mezzanine counting as a story.
Which footprint fits a shop, warehouse, retail store or church?
The use, not the steel, decides how big a metal building can get before the code adds cost. Each use falls in an IBC occupancy group with its own sprinkler trigger and area cap, and each has an occupant load factor that sets exits. The table compares one-story Type IIB buildings, the usual class for unprotected steel; our occupancy classification guide explains how a group is assigned.
| Use | IBC group | Occupant load factor (Table 1004.5) | Sprinkler trigger (Section 903.2) | Type IIB area cap: unsprinklered / sprinklered (Table 506.2) |
|---|---|---|---|---|
| Warehouse, storage, self-storage | S-1 | 500 gross (warehouses) | Fire area over 12,000 sq ft; upholstered furniture or mattress storage over 2,500 sq ft | 17,500 / 70,000 sq ft |
| Noncombustible storage (metal parts, glass) | S-2 | 500 gross | Enclosed parking over 12,000 sq ft; otherwise none by area | 26,000 / 104,000 sq ft |
| Vehicle repair shop | S-1 (repair garage) | No repair-garage row; the official assigns one | One story: fire area over 12,000 sq ft; commercial truck repair over 5,000 sq ft (903.2.9.1) | 17,500 / 70,000 sq ft |
| Fabrication or woodworking shop | F-1 | 100 gross (industrial) | Fire area over 12,000 sq ft; dust-producing woodworking over 2,500 sq ft (903.2.4.1) | 15,500 / 62,000 sq ft |
| Retail store | M | 60 gross | Fire area over 12,000 sq ft; furniture or mattress display over 5,000 sq ft | 12,500 / 50,000 sq ft |
| Church, community hall | A-3 | 7 net (chairs only), 15 net (tables and chairs) | Fire area over 12,000 sq ft or 300 or more occupants | 9,500 / 38,000 sq ft |
| Office, showroom office | B | 150 gross | Only ambulatory care | 23,000 / 92,000 sq ft |
Sources: IBC 2024 Table 506.2, Section 903.2 and Table 1004.5, accessed November 21, 2026. Local amendments can lower these triggers, so confirm them with the building department before fixing the footprint.
Occupant load changes far more than area does. The same 10,000 sq ft holds 20 people as a warehouse but about 1,429 as a chairs-only worship space, which is why a church hits sprinkler, alarm and exit rules at footprints where a warehouse hits none. Our occupant load factor guide shows the net versus gross arithmetic.
At what size does a metal building need sprinklers?
For storage, factory and retail uses the answer is a fire area over 12,000 sq ft (IBC 903.2.4, 903.2.7 and 903.2.9), so an 80 x 150 ft building at exactly 12,000 sq ft stays under the trigger and a 100 x 150 ft building does not. A church triggers earlier: at 300 occupants, which chairs-only seating reaches at 2,100 net sq ft (300 x 7).
A fire area is the floor area bounded by fire walls, fire barriers and exterior walls, so a large building can be divided into fire areas of 12,000 sq ft or less instead of sprinklered. The combined F-1, M or S-1 fire areas still cannot pass 24,000 sq ft. Our fire sprinkler system cost guide prices the system once it is required.
How does a larger footprint go past the area limits?
Three code paths let a one-story steel building grow. Sprinklers multiply the Type IIB storage cap from 17,500 to 70,000 sq ft (Table 506.2, S1 column). Open frontage adds up to 0.75 times the unsprinklered value (Table 506.3.3, 75 to 100 percent of perimeter facing 30 ft or more). Unlimited area applies to sprinklered one-story B, F, M and S buildings with 60 ft yards on every side (Section 507.4).
A 200 x 400 ft storage building of 80,000 sq ft shows the math: 70,000 + (17,500 x 0.75) = 83,125 sq ft allowed with full frontage, so it passes without the unlimited-area path. Noncombustible storage (F-2, S-2) one story high gets unlimited area even without sprinklers when 60 ft yards surround it (Section 507.3). Our types of construction guide covers the other construction types if a steel frame needs fireproofing to reach a bigger cap.
Worked example: what does a 100 x 150 ft warehouse trigger?
A 100 x 150 ft storage building with a 20 ft eave and 1:12 roof is a common mid-size request. Running it through the code steps shows that the 15,000 sq ft footprint passes the unsprinklered area cap but still needs sprinklers and a second exit, and that trimming it to 80 x 150 ft removes both triggers.
| Step | 100 x 150 ft | 80 x 150 ft | Rule |
|---|---|---|---|
| Floor area | 100 x 150 = 15,000 sq ft | 80 x 150 = 12,000 sq ft | Width x length |
| Bays and frame | 6 bays at 25 ft; 100 ft rigid clear span | 6 bays at 25 ft; 80 ft rigid clear span | Nucor guide 1.3.1.1 |
| Ridge height at 1:12 | 20 + 50/12 = 24.17 ft | 20 + 40/12 = 23.33 ft | Eave + half width x slope |
| Sprinklers (S-1) | Required: 15,000 is over 12,000 | Not required by area: 12,000 does not exceed 12,000 | IBC 903.2.9 |
| Unsprinklered Type IIB area cap | 15,000 is under 17,500: passes | Passes | Table 506.2 |
| Occupant load (500 gross) | 15,000 / 500 = 30 | 12,000 / 500 = 24 | Table 1004.5 |
| Exits from the space | 30 is over the 29 allowed with one exit: two exits | Occupant load alone does not force a second exit | Table 1006.2.1 |
| Corner to corner diagonal | Square root of (100 squared + 150 squared) = 180.3 ft, under the 250 ft sprinklered limit | 170.0 ft, under the 200 ft unsprinklered limit | Table 1017.2 |
The arithmetic is CB&C’s, from IBC 2024 tables accessed November 21, 2026; travel distance is measured along the actual walking path, so the diagonal is a screening check only. Change the use and the answer changes: the same 12,000 sq ft as a chairs-only church would hold far more than 300 occupants and need sprinklers.
Does a bigger metal building change accessibility rules?
Yes, at the second level. Under the 2010 ADA Standards, Section 206.2.3 Exception 1, a private building that is under three stories or has under 3,000 sq ft per story does not need an accessible route between stories, unless it is a shopping center, a health care provider’s professional office or a transit terminal. A mezzanine is not a story, but where a route between levels is required it must serve mezzanines too (Advisory 206.2.3).
Ground-floor rules do not shrink with size: every public entrance, toilet room and work area on the accessible level still has to comply. For a 60 x 100 ft shop with a 2,000 sq ft office mezzanine, ask the plan reviewer two questions: whether the mezzanine houses services the public uses, and whether the state code adopts a lower threshold than the ADA exception.
How do residential garage and barn sizes compare?
Residential sizes are a different code path, shown here only as a labelled contrast. Seller size charts on page 1 for this search in November 2026 start at 24 x 30 ft hobby garages (720 sq ft); on a house lot those are accessory structures under the International Residential Code, and a detached one-story accessory structure of 200 sq ft or less needs no permit (IRC 2024 R105.2).
| Item | Residential (contrast only) | Commercial | Source |
|---|---|---|---|
| Permit exemption for small sheds | 200 sq ft or less, detached, one story | 120 sq ft or less, detached, one story | IRC R105.2; IBC 105.2 |
| Governing code | IRC, accessory structure | IBC, occupancy group and construction type | IRC and IBC 2024 Ch. 1 |
| Sprinkler trigger by size | None for a detached garage | Fire area over 12,000 sq ft (F-1, M, S-1) | IBC 903.2 |
| Typical sizes on seller charts | 24 x 30 to 40 x 60 ft | 50 x 100 ft and up | Page 1 seller charts, Nov 2026 |
Which metal building size should you choose?
Start from the use and the code thresholds, then fit the frame to them. The decision table puts the thresholds from the sections above in one place for a one-story Type IIB building under the 2024 IBC, with storage as the reference use unless the row names another.
| If | Then | Rule |
|---|---|---|
| Storage, factory or retail and you want no sprinklers | Keep each fire area at 12,000 sq ft or less (80 x 150 ft is the largest common size that fits) | IBC 903.2.4, 903.2.7, 903.2.9 |
| Church seating is chairs only | Budget sprinklers once net seating area reaches 2,100 sq ft (300 occupants) | IBC 903.2.1.3; Table 1004.5 |
| Retail over 12,500 sq ft | Sprinklers are needed for area too (unsprinklered cap 12,500) | Table 506.2 |
| Width 60 ft or less | A tapered beam frame can serve; above 60 ft use a rigid frame | Nucor guide 1.3.1 |
| Width over 150 ft and interior columns are acceptable | Price a modular frame with interior columns | Nucor guide 1.3.1.3 |
| Racking above 12 ft | Plan for IFC Chapter 32 high-piled storage rules and an eave of 16 ft or more | IFC 2024 Section 202 |
| One-story sprinklered warehouse with long walking paths | Specify 24 ft clear to the deck to reach 400 ft travel distance | IBC 1017.2.2 |
| Storage building over 70,000 sq ft | Use frontage (up to 83,125 sq ft) or 60 ft yards for unlimited area | IBC 506.3, 507.4 |
Our church construction guide applies the A-3 thresholds to a full worship building, including fellowship halls and classrooms.
Size also sets the price, so read steel building prices next to warehouse construction cost before picking a footprint.
How we compiled this
We read 12 primary documents in November 2026: a manufacturer specification guide (Nucor Building Systems), federal guide specification UFGS 13 34 19, the 2024 IBC Chapters 1, 5, 6, 9 and 10, the 2024 IFC definitions, the 2024 IRC Chapter 1, the 2010 ADA Standards, the MBMA design resources page and seven USAspending award records. Code thresholds are model-code values; we did not check state or local amendments. Seller size charts were read only to see what page 1 offers and are not used as a source of facts.
Frequently asked questions
What is the most common metal building size?
No national data counts sizes, so no one can rank them reliably. Seller charts on page 1 in November 2026 repeat 30 x 40, 40 x 60 and 50 x 100 ft, and seven federal award records name sizes from 30 x 60 x 14 ft (1,800 sq ft) to 110 x 200 ft (22,000 sq ft). For commercial work, size from the use and the 12,000 sq ft sprinkler line.
How wide can a metal building be without interior columns?
A rigid clear-span frame is commonly used from 40 ft to over 150 ft wide, per the Nucor Building Systems Specification Guide, Section 1.3.1.1. Past that, frames with interior columns are economical from 80 ft to over 300 ft wide. A through-fastened roof panel on Z purlins has a maximum recommended width of 240 ft for a gable roof and 120 ft for a single slope.
How is metal building size measured?
Width and length are measured steel line to steel line, from the outside face of one wall girt to the outside face of the opposite girt. Eave height runs from finished floor to the top of the eave strut in the Nucor guide, but to the intersection of roof and wall planes in UFGS 13 34 19, so state the definition in the order.
What size metal building needs fire sprinklers?
Under 2024 IBC Section 903.2, a storage (S-1), factory (F-1) or retail (M) fire area over 12,000 sq ft needs automatic sprinklers, as does a combined total over 24,000 sq ft. A church (A-3) needs them over 12,000 sq ft or at 300 occupants, which chairs-only seating reaches at 2,100 net sq ft. Local amendments can set lower triggers.
What eave height should a commercial shop have?
UFGS 13 34 19 offers 16, 20, 24 and 28 ft as standard eave heights. The eave has to clear the tallest door plus its header framing, so a 14 ft trailer door needs more than a 14 ft eave. Storage stacked above 12 ft is high-piled storage under IFC 2024, and 24 ft clear lets a sprinklered one-story warehouse use 400 ft travel distance.
How far apart are the frames in a steel building?
Frames are usually 20, 25 or 30 ft apart, the bay options listed in federal guide specification UFGS 13 34 19, Section 1.4.6. Interior bays are measured center to center of frames and end bays from the outside face of the endwall girt to the first interior frame. Longer long-bay layouts replace cold-formed purlins with bar joists (Nucor guide 5.3.2).
Sources
- Nucor Building Systems, Specification Guide, Sections 1 to 15 (revisions 2015 to 2020), accessed November 21, 2026.
- USACE, NAVFAC and AFCEC, UFGS 13 34 19, Metal Building Systems (August 2026), accessed November 21, 2026.
- International Code Council, 2024 IBC Chapter 5, General Building Heights and Areas (Tables 504.3, 504.4, 506.2, 506.3.3; Sections 505.2.1, 507.3, 507.4, 507.6), accessed November 21, 2026.
- International Code Council, 2024 IBC Chapter 6, Types of Construction (Section 602.2, Table 601), accessed November 21, 2026.
- International Code Council, 2024 IBC Chapter 9, Fire Protection and Life Safety Systems (Section 903.2), accessed November 21, 2026.
- International Code Council, 2024 IBC Chapter 10, Means of Egress (Tables 1004.5, 1006.2.1, 1017.2; Section 1017.2.2), accessed November 21, 2026.
- International Code Council, 2024 IBC Chapter 1, Scope and Administration (Section 105.2), accessed November 21, 2026.
- International Code Council, 2024 IRC Chapter 1, Scope and Administration (Section R105.2), accessed November 21, 2026.
- International Code Council, 2024 IFC Chapter 2, Definitions (high-piled combustible storage), accessed November 21, 2026.
- U.S. Department of Justice, 2010 ADA Standards for Accessible Design (Section 206.2.3), accessed November 21, 2026.
- Metal Building Manufacturers Association, Design Resources: Metal Building Systems Manual, 2024 Edition, accessed November 21, 2026.
- American Institute of Steel Construction, ANSI/AISC 360, Specification for Structural Steel Buildings, accessed November 21, 2026.
- U.S. Department of the Treasury, USAspending.gov award records (seven awards linked in the table), accessed November 21, 2026.