Commercial kitchen design is a health-code exercise first: food must move one way, every prep, dispensing and warewashing area needs its own hand sink under FDA Food Code 2026 section 5-204.11, and plans pass review before construction.

Key takeaways

  • The FDA Food Code 2026 requires hand sinks located for convenient use in food preparation, food dispensing and warewashing areas and in or next to toilet rooms (section 5-204.11) (FDA, Food Code 2026).
  • The Conference for Food Protection’s 2025 plan review guidance calls for a splash guard as high as the faucet outlet when unpackaged food or clean equipment sits within about 18 inches of a hand sink, and a 36-inch minimum aisle (CFP Plan Review Guidance 2025).
  • Local rules can be stricter than the FDA model: California Health and Safety Code 113953 requires a 6-inch metal splashguard between a hand sink and a warewashing sink unless the drainboards are 24 inches apart, and Los Angeles County and Georgia’s design manual call for hand sink water of at least 100°F (Cal. H&S Code 113953).
  • Equipment that cannot be moved easily must be sealed or raised on 6-inch legs (floor) or 4-inch legs (counter) under Food Code 4-402.12; CFP recommends 6, 12 or 18 inches of side clearance for units up to 4 feet, 4 to 8 feet and over 8 feet long (CFP 2025, Fig. 5).
  • As of October 2026, Los Angeles County charges $1,530 to review a new 501 to 1,999 sq ft restaurant and targets an initial review in 20 business days (LA County fee form, Rev 11/2025); Florida reviews online applications within 30 days (Florida DBPR).
Key numberWhat it governsSource
85°F or 100°FHand sink water: 85°F under the 2022 and 2026 Food Code, 100°F under the 2017 and older editionsFood Code 2026, 5-202.12(A)
100°F to 108°FCalifornia hand sink water where the faucet temperature is not adjustableCal. Health and Safety Code 113953(c)
6 in / 24 inCalifornia splashguard height between hand and warewashing sinks / spacing that removes itCal. H&S Code 113953(b)(2)
15 secondsMinimum flow from a self-closing or metering faucetFood Code 2026, 5-202.12(C)
About 18 inDistance at which a hand sink needs a splash guardCFP 2025 guidance, p. 38
36 inMinimum aisle and working space widthCFP 2025 guidance, p. 27
6 in / 4 inLeg height for fixed floor / counter equipmentFood Code 2026, 4-402.12
50 / 20 / 10 foot-candlesLight at prep surfaces / handwash and warewash areas / walk-insFood Code 2026, 6-303.11
20 business daysInitial plan check in Los Angeles CountyLA County plan check guide

How do you design a commercial kitchen, step by step?

Design a commercial kitchen in the order a health reviewer reads it: menu first, then layout, food flow, hand sinks, storage, clearances and the plan review package. Each step below has a number you can check on your own drawings, and each links to the section that explains it. Most restaurant projects run these steps before a lease is final.

  1. Write the menu and count meals. Sort each dish into the 3 processes in the Conference for Food Protection (CFP) 2025 plan review guidance: no cook, same-day cook, or cook, cool and reheat.
  2. Pick a layout that fits the menu and the room. Assembly line, island, zone, galley or open kitchen; a galley still needs a 36-inch aisle.
  3. Draw one-way food flow. Receiving to storage, prep, cooking and the pass, with dirty dishes returning on their own path to warewashing.
  4. Place hand sinks. One in every prep, dispensing and warewashing area (Food Code 5-204.11), with a splash guard if open food sits within about 18 inches.
  5. Size storage and hot water. Walk-in space is 0.1 cubic feet per meal times meals between deliveries, divided by 0.40 (CFP 2025).
  6. Check clearances and light. Fixed equipment sealed or on 6-inch legs, food stored 6 inches up, 50 foot-candles at prep surfaces.
  7. File plan review before you build. Food Code 8-201.11 requires it; Los Angeles County charges $1,044 to $2,723 and targets 20 business days for the first review.

Which commercial kitchen layout fits your menu?

The five layouts that commercial kitchen guides repeat (assembly line, island, zone-style, galley and open kitchen) are workflow choices, not code categories. A health reviewer does not approve a layout type. It checks whether food moves one way, whether each prep, dispensing and warewashing area has its own hand sink under Food Code 5-204.11, and whether aisles and equipment spacing leave room to clean.

LayoutHow work movesTypical fitDesign rule that decides itSource
Assembly lineOne direction, raw ingredient to finished plateLimited menus with similar steps: pizza, bowls, sandwichesHand sink at each station; a sink in another room or out of sight is not conveniently locatedCFP 2025, p. 38
IslandCooking block in the center, prep and storage on the wallsFull-service kitchens run from one passCFP recommends about 18 in from walls and other equipment for units 8 ft or longer, unless sealedCFP 2025, Fig. 5
Zone-styleSeparate stations for prep, cooking, baking, warewashingLarge or mixed menus, hotels, institutionsA hand sink in every prep, dispensing and warewashing zoneFood Code 2026, 5-204.11
GalleyTwo parallel lines with one aisle betweenNarrow tenant spacesAisle and working space at least 36 in, more where carts passCFP 2025, p. 27
Open kitchenCooking line visible from the dining roomChef-driven and fast-casual conceptsFood on display shielded by sneeze guards or counters that block a direct line from the guest’s mouthLA County guideline

Choose the layout after the menu, not before. The CFP 2025 guidance says the menu “dictates the space and equipment requirements” and sorts every item into 3 processes, each with a different equipment chain. A kitchen heavy on Process 3 items needs cooling and reheating capacity that a Process 2 burger line does not.

CFP processStepsMenu examplesLayout consequence
1. No cook stepReceive, store, prepare, hold, serveSalads, deli meat, cheeses, sashimiCold prep area kept apart from raw protein prep
2. Same-day serviceReceive, store, prepare, cook, hold, serveHamburgers, fried chicken, hot dogsShort path from cold storage to the cook line
3. ComplexAdds cool and reheat, so food crosses 41°F to 135°F more than onceRefried beans, leftoversRapid cooling space (ice baths, blast chiller) and hot holding

How should food flow through a commercial kitchen layout?

Food should move in one direction from the receiving door to the service pass, with soiled ware coming back on a separate path to warewashing. The CFP 2025 guidance asks reviewers to confirm that raw ingredients stay separate from ready-to-eat food and that traffic does not cross waste, and some health departments ask for a color-coded flow chart showing food, utensil and refuse paths.

  1. Receiving: a dock or door near storage; large cargo-type doors may not open directly into a prep or utensil washing area in Los Angeles County (LA County guideline).
  2. Storage: walk-in, reach-in and dry shelves, with food at least 6 inches above the floor (Food Code 2026, 3-305.11).
  3. Prep: raw and ready-to-eat work kept apart, with a hand sink in the area (5-204.11).
  4. Cooking: the line under the hood, with its own hand sink within the work area.
  5. Holding: cold at 41°F or below and hot at 135°F or above, the edges of the danger zone in the CFP guidance.
  6. Service: the pass to guests; a hand sink where food is dispensed.
  7. Soiled ware return: back to warewashing (a 3-compartment sink or dish machine), which needs its own hand sink, then to clean storage 6 inches above the floor.
Diagram: one-way commercial kitchen food flow with hand sink placement and clearance notesOne-way food flow and hand sink placementReceivingdock or doorStoragewalk-in, reach-in,dry shelvesPrepraw and ready-to-eat kept apartCookingline under hoodHolding41°F or below,135°F or aboveServicepass to guestsHand sinkHand sinkHand sinkSoiled ware returnfrom service and the lineWarewashing3-compartment sinkor dish machineClean storage6 in above the floorHand sinkSplash guard as high as the faucet outlet if food or clean ware is within about 18 in (CFP 2025)Hand sink in another room or out of sight is not conveniently located (CFP 2025)Aisles and working spaces: 36 in minimum (CFP 2025); verify with local code officialsHand sinks in prep, dispensing and warewashing areas and at toilet rooms (Food Code 5-204.11)
Food moves one way from receiving to service while soiled ware returns to warewashing; hand sinks sit in each work area under FDA Food Code 2026 section 5-204.11, with CFP 2025 splash and aisle notes. Accessed October 2026.

Equipment placement follows the same logic. Food Code 2026 section 4-401.11 bars equipment and food storage cabinets from toilet rooms, garbage rooms and mechanical rooms, from under unshielded sewer lines and open stairwells, and, since the 2026 edition, from under condensing or leaking pipes of water-based fire protection systems. Our restaurant build-out guide covers the hood, grease duct and suppression system that anchor the cook line.

What clearances does the Food Code set for equipment, aisles and storage?

The Food Code sets cleaning clearances, not ergonomic ones. Fixed floor equipment must be sealed or raised 6 inches, fixed counter equipment 4 inches, food stored 6 inches up, and an air gap must be at least 1 inch. Aisle width comes from fire and building codes; the CFP guidance treats 36 inches as the minimum and tells designers to confirm it locally.

ElementMinimumCondition or exceptionSource
Fixed floor-mounted equipmentSealed to floor, or legs giving 6 in4 in if no point under it is more than 6 in from cleaning accessFood Code 2026, 4-402.12(A), (B)
Fixed counter-mounted equipmentSealed, or legs giving 4 in3 in if the tabletop under it is 20 in deep or less; 2 in if 3 in or lessFood Code 2026, 4-402.12(D), (E)
Space to walls and other equipment6 in (unit 4 ft or less); 12 in (4 to 8 ft); 18 in (8 ft or more)Recommended where units are not sealedCFP 2025, Fig. 5, p. 28
Aisles and working spaces36 inVerify with the local code officeCFP 2025, p. 27
Accessible route to the kitchen36 in clear (32 in for 24 in max)Employee work areas need only approach, enter and exit2010 ADA Standards 203.9, 403.5.1
Food storage6 in above the floorCase lot dollies and sealed cans or bottles exceptedFood Code 2026, 3-305.11
Dry storage shelvingLowest shelf 6 in; top shelf 7 ft max; 15 in between shelvesRecommendedCFP 2025, p. 41
Exposed utility lines6 in off the floorPenetrations sealedCFP 2025, p. 28
Air gap at fixtures2 times the inlet diameter, at least 1 inOr an approved backflow deviceFood Code 2026, 5-202.13
Dish machine direct drainWithin 5 ft of a trapped floor drainOnly where the plumbing code allowsFood Code 2026, 5-402.11(C)
Janitorial sink30 in from other equipmentOr a solid partition 18 in above the rimLA County guideline
Light at prep surfaces50 fc (540 lux)20 fc at handwash and warewash areas; 10 fc in walk-insFood Code 2026, 6-303.11

Check the CFP spacing table against the equipment schedule early. A 10-foot cook line set 18 inches off the wall gives up 1.5 feet of depth along its full length unless the units are sealed to the wall, and that choice changes the aisle behind it. The 2010 ADA Standards do not set a kitchen aisle width: section 203.9 only requires that employees can approach, enter and exit the work area. A preconstruction review is the stage to resolve these dimensions.

Where do hand sinks go, and how far from food prep?

Under Food Code 5-204.11, a hand sink must be convenient to employees in every food preparation, food dispensing and warewashing area and in or next to each toilet room. The model code sets no distance in feet. Distances come from guidance and local rules: about 18 inches for a splash guard (CFP 2025), and a 25-foot rule of thumb in Georgia’s design manual.

Rule sourceWater temperatureSeparation or splash ruleLocation ruleSource
FDA Food Code 2026 (model)At least 85°FNone in inches; sink may not be blockedPrep, dispensing and warewashing areas; at toilet rooms5-202.12, 5-204.11, 5-205.11
CFP plan review guidance, 2025At least 85°FSplash guard as high as the faucet outlet if food or clean ware is within about 18 inNot conveniently located if in another room or not visibleCFP 2025, p. 38
Florida DBPR (2017 Food Code)100°F under the 2017 Food Code text, unless Florida amended it; hot and cold water under pressureSplash protection where splash can reach food, prep surfaces, clean equipment or paper goodsEach prep, warewashing and dispensing area, including ice dispensingDBPR plan review guidelines
California H&S Code 113953 (state law)Warm water for 15 seconds; 100 to 108°F if not adjustable at the faucet6 in metal splashguard between hand sink and warewashing drainboard, unless 24 in or more apartPrep areas, and warewashing areas not next to prep (built or remodeled after Jan. 1, 1996)Cal. H&S Code 113953
Los Angeles County guidelineAt least 100°F; automatic faucets preset 100 to 108°FApplies 113953Same as 113953LA County guideline
Georgia DPH design manual, Section FAt least 100°FWashable baffle may be needed next to a prep sink, table or counterRule of thumb: within 25 ft of prep, dispensing and warewashingGeorgia DPH, dated 01/04/2013
Minimum hand sink water temperature by rule sourceBar chart: hand sink water minimum is 85°F under the 2022 and 2026 Food Code and CFP, 100°F under 2017 and older, Georgia and LA County.025.050.075.0100125°F85.0FDA Food Code 2022and 2026100FDA Food Code 2017and older85.0CFP guidance 2025100Georgia DPH manual100LA County guideline
Hand sink water must reach at least 85°F under the 2022 and 2026 FDA Food Code but 100°F under the 2017 and older editions, Georgia DPH’s manual and Los Angeles County’s guideline; documents accessed October 2026.

The temperature split tracks which Food Code edition a state adopted and how it amended it: the 2017 and older editions required 100°F, and the 2022 edition cut the minimum to 85°F (FDA Food Code 2022, Summary of Changes). FDA’s adoption table shows California’s health department on the 2005 Food Code and Georgia’s Department of Public Health on the 2013 edition, while Florida DBPR and Arizona adopted 2017 (FDA Food Code adoption report, 2024). As of 2024, only 11 state agencies in 7 states had adopted the 2022 edition (FDA). Size the water heater and mixing valve to the code your county enforces.

The Food Code annex cites one finding that favors more sinks: workers washed hands more often in restaurants with more than one hand sink and with a sink in the worker’s line of sight (Green et al., Journal of Food Protection, March 2007, cited in Food Code 2026 Annex 3). A hand sink behind a door or blocked by a cart fails 5-205.11, which requires it to be accessible at all times and used only for handwashing.

How big should storage, sinks and hot water be?

The CFP 2025 guidance gives formulas reviewers use to test whether storage and hot water match the menu. Walk-in space equals volume per meal times meals between deliveries, divided by 0.40, because only 40% of a walk-in is usable once aisles and air gaps are counted. Reach-ins use 0.75. Dish machine booster sizing belongs to the plumbing engineer and the machine spec sheet. The table runs those formulas for an example kitchen; replace the inputs with your own.

ItemFormula (CFP 2025)Example inputsResult
Meals between deliveriesMeals per day x days between deliveries300 meals x 4 days1,200 meals
Walk-in usable volume0.1 cu ft per meal x meals / 0.400.1 x 1,200 / 0.40300 cu ft
Walk-in floor areaUsable volume / cooler height300 / 6 ft50 sq ft
Reach-in volume (if no walk-in)0.1 x meals / 0.750.1 x 1,200 / 0.75160 cu ft
Dry shelving0.1 x meals / (depth x clearance x 0.80)120 / (1.5 ft x 1.25 ft x 0.80)80 linear ft
3-compartment sink hot waterSink in3 x compartments x 0.00325518 x 18 x 12 in = 3,888 in3 x 338 gallons per hour

The 300-meal, 4-day inputs are a CB&C example; the 0.1 cubic feet per meal, the 0.40 and 0.75 usable factors and the 0.80 shelf factor are the CFP 2025 guidance defaults. The sink uses the 18 by 18 by 12 inch minimum compartment in Los Angeles County’s guideline, and the 15-inch shelf clearance is CFP’s recommended minimum.

When does a kitchen need health department plan review?

Food Code 8-201.11 requires plans before building a food establishment, converting an existing structure, or remodeling when the regulatory authority decides plans are needed. In practice, moving equipment, adding gas, power or plumbing connections, or installing a hood triggers review. Florida adds one rule of its own: reopening after 18 months or more closed.

SituationPlan review?Source
New construction of a food establishmentRequiredFood Code 2026, 8-201.11(A)
Converting a space that was not a food facilityRequired8-201.11(B); LA County process guide
Changing the layout, including moving equipment or cabinetryRequiredCFP 2025, p. 9
Menu change that adds equipmentRequiredCFP 2025, p. 9
Installing or replacing an exhaust hoodRequired in Los Angeles CountyLA County process guide
Replacing equipment like for like, not gas, plumbing or ventilation connectedUsually not requiredCFP 2025, p. 9
Replacing finishes, such as fiberglass wall panels (FRP) with FRP, tile or stainless steelUsually not requiredCFP 2025, p. 9
Reopening a Florida restaurant closed 18 months or moreRequiredFlorida DBPR
LA County market with prepackaged, non-potentially hazardous food under 300 sq ftPlans not requiredLA County service request form
Decision flowchart: whether a commercial kitchen project needs health department plan reviewDoes your kitchen project need health department plan review?Q1. New building, or converting a spacethat was not a food establishment?Q2. Moving equipment or cabinetry, new hood,or new gas, power or plumbing equipment?Q3. Only a like-for-like swap orreplacing finishes (FRP, tile, stainless)?Q4. Florida: reopening after beingclosed 18 months or more?Plan review requiredFood Code 8-201.11(A) and (B)Plan review requiredCFP 2025; LA County hood ruleUsually not requiredConfirm in writing firstPlan review requiredFlorida DBPRYesYesYesYesNoNoNoNoAsk the health department8-201.11(C): remodel or change of operation
New construction and conversions need plan review under FDA Food Code 8-201.11; layout, hood and utility changes trigger it under CFP 2025 guidance and LA County rules; Florida adds reopening after 18 months closed.

Health plan review runs alongside the building permit, not instead of it. Los Angeles County’s process sends the approved health plans to Building and Safety for permits, and its final step asks for a certificate of occupancy or a signed inspection card. Our guides to commercial building permits and the certificate of occupancy explain those 2 approvals.

What goes in a plan review submittal for commercial kitchen design?

Food Code 8-201.12 lists six items: the menu, expected food volume, the layout with mechanical schematics and finish schedules, an equipment list with makes, models and dimensions, evidence of a food safety management system, and anything else the authority asks for. The 2026 edition reworded item E around that management system. Local checklists then add scale, sheet size and spec sheets.

Submittal itemFood Code 8-201.12CFP 2025Florida DBPRLos Angeles County
MenuIntended menu (A)Menu, seats, daily meal volumeSample menuComplete menu
Floor plan to scaleProposed layout (C)11 x 14 in minimum, e.g. 1/4 in = 1 ftScale drawing, equipment labeledOne set to scale
Equipment scheduleTypes, makes, models, dimensions, capacities (D)Make, model and listingEquipment labeled on planSpec sheets for equipment and sinks
PlumbingMechanical schematics (C)Floor drains, floor sinks, water heater capacity and recovery, backflowGuidelines onlyPlumbing plan if applicable
Finish scheduleConstruction materials, finishes (C)Each room, incl. coved basesDocument finishesFinish plan; physical samples (AB 671 FAQ)
Food safety management systemEvidence (E), reworded in 2026Written procedures (SOPs) and training discussedNot listedSOPs if applicable
Review clockNot setNot set30 days, online20 business days initial

Los Angeles County’s plan check guide names the files that most often delay review: plans, equipment schedule, manufacturer spec sheets, water heater location and menu. Its 9-step sequence runs from a zoning check to the health permit.

  1. Confirm zoning with LA County Regional Planning or the city planning department.
  2. Submit one set of plans to scale with the application, equipment and sink plan, mechanical, plumbing and electrical plans if applicable, spec sheets and the complete menu.
  3. Pay the plan check fee from the emailed invoice; review starts after payment.
  4. Initial review: 20 business days standard, 10 business days expedited.
  5. Resubmit corrections; corrected plans are reviewed within 10 business days.
  6. Take approved plans to Building and Safety and get permits before construction.
  7. Build, and book a preliminary inspection when the project is 80% complete.
  8. Pass final inspection and show a certificate of occupancy or signed building inspection card.
  9. Submit the public health permit application, pay the permit fee and open.
Process diagram: nine steps of Los Angeles County retail food plan check with review timesLos Angeles County retail food plan check, step by step1. Zoning checkRegional Planning or city2. Submit plansto scale, specs, menu3. Pay plan check feeinvoice; review starts4. Initial review20 business days5. Corrections10 business days6. Building and Safetypermits before work7. Buildpreliminary inspection at 80%8. Final inspectionCO or signed card9. Health permitapplication and fee, then openExpedited review: 10 business days where available. Fee covers two plan reviews and two inspections.
Los Angeles County reviews initial restaurant plans within 20 business days (10 expedited) and corrections within 10, with a preliminary inspection at 80% complete, per its plan check guide accessed October 2026.

How long does plan review take and what does it cost?

Review clocks and fees are set locally. As of October 2026, Los Angeles County charges $1,044 to $2,723 for a new restaurant plan check depending on square footage, with expedited review at about 1.5 times the regular fee. Florida DBPR reviews online applications within 30 days, and California’s AB 671 sets 10 business days for restaurant tenant improvement resubmittals.

LA County restaurant or caterer plan checkRegular feeExpedited fee
New, 500 sq ft or less$1,044$1,566
New or remodel, 501 to 1,999 sq ft$1,530$2,295
New or remodel, 2,000 to 3,999 sq ft$1,865$2,798
New or remodel, 4,000 to 9,999 sq ft$2,276$3,414
New or remodel, 10,000 sq ft or more$2,723$4,085
Remodel, 300 sq ft or less$315$473
Remodel, 301 to 500 sq ft$1,044$1,566
Los Angeles County restaurant plan check fees by sizeBar chart: LA County restaurant plan check costs $315 for small remodels and $1,044 to $2,723 for new kitchens; expedited $473 to $4,085.01,0002,0003,0004,0005,000$315473Remodel, 300 sqft or less1,0441,566New, 500 sq ftor less1,5302,295501 to 1,999 sqft1,8652,7982,000 to 3,999sq ft2,2763,4144,000 to 9,999sq ft2,7234,08510,000 sq ft ormoreRegularExpedited
A new 501 to 1,999 sq ft restaurant pays $1,530 for Los Angeles County plan check, or $2,295 expedited, under the county’s Rev 11/2025 service request form, accessed October 2026.

Fees come from the LA County service request form (Rev 11/2025), and the county’s plan check guide says the fee covers 2 plan reviews and 2 inspections, with extra fees for scope changes or incomplete work. Under AB 671, effective January 1, 2026, restaurant tenant improvement resubmittals get a 10-business-day review; fast-food restaurants and new buildings are excluded, and a change of scope gets 20 business days.

Florida DBPR’s plan review page lists no review fee, and its variance process has no fee, with routine variance answers within 90 days and emergency answers within 30 (DBPR). Budget the health review inside the design schedule in our commercial construction process guide, since review time on a 20-business-day clock is about 4 calendar weeks before any corrections. Construction cost records for whole kitchens are in our commercial kitchen guide.

Which design rule applies to your project?

Use the thresholds below to settle the questions reviewers flag most often. Each row names the trigger, the design response and the rule behind it, so the drawings answer the comment before it is written. Where a local rule is stricter than the FDA model code, the local rule wins, as in California’s 24-inch warewashing sink spacing.

IfThenRule
Unpackaged food, clean equipment or utensils are within about 18 in of a hand sinkAdd a splash guard at least as high as the faucet outlet, or move the sinkCFP 2025; Sauk County
The nearest hand sink is in another room or out of the worker’s sightAdd a hand sink inside that work areaCFP 2025, p. 38; Food Code 5-204.11
Your state enforces the 2022 or later Food CodeSpecify tempered water of at least 85°FFood Code 2022 and 2026, 5-202.12(A)
Your state is on the 2017 or an older edition and has not amended the ruleSpecify at least 100°FFood Code 2017, 5-202.12(A)
The kitchen is in Los Angeles County, or in Georgia under DPH rulesSpecify at least 100°F; California caps non-adjustable faucets at 108°FLA County guideline; Cal. H&S 113953(c); Georgia DPH Section F
A California hand sink sits closer than 24 in to a warewashing sink drainboardInstall a metal splashguard at least 6 in high along the drainboardCal. H&S 113953(b)(2)
Floor equipment cannot be moved easilySeal it to the floor or set it on 6 in legsFood Code 4-402.12(A)
A unit or line is 8 ft long or more and not sealedHold 18 in to walls and neighboring equipmentCFP 2025, Fig. 5
The menu needs produce washing, thawing or ice bathsAdd a food prep sink with an indirect drain (LA County minimum tub 18 x 18 x 12 in)LA County; Sauk County
You will move equipment or add gas, power or plumbing equipmentFile health plan review before work startsCFP 2025; Food Code 8-201.11
A Florida restaurant has been closed 18 months or moreFile plan review before reopeningFlorida DBPR

When bids come in, check that each one prices the same hand sinks, splash guards, floor sinks and 6-inch equipment legs shown on the approved plan. Our guide on how to compare construction bids covers exclusions line by line, and tenant improvement contractors explains second-generation restaurant space. This page is general information, not legal or code advice; your health department and building official make the final call.

The layout fixes where equipment, sinks and floor drains go, and each has its own guide: commercial kitchen equipment, commercial kitchen sinks and commercial kitchen flooring.

How we compiled this

In October 2026, CB&C editors read 16 primary documents: the FDA Food Code 2026, FDA’s 2024 adoption report, the CFP 2025 plan review guidance, California Health and Safety Code 113953, plan review pages and forms from Florida DBPR and Los Angeles County, and design rules from Georgia DPH, Sauk County and the 2010 ADA Standards, plus the 2022 and 2017 Food Code texts for the hand sink temperature change. We contacted no health department; the sizing inputs are our example.

Frequently asked questions

What are the main types of commercial kitchen layouts?

Guides name five: assembly line, island, zone-style, galley and open kitchen. None is a code category. Whichever you pick, FDA Food Code 2026 section 5-204.11 still requires a hand sink in every food prep, food dispensing and warewashing area, and the CFP 2025 plan review guidance treats 36 inches as the minimum aisle and working space.

How far does a hand sink need to be from a prep sink or prep table?

The FDA Food Code sets no distance. The Conference for Food Protection’s 2025 guidance and Sauk County, Wisconsin, call for a splash guard as high as the faucet outlet when unpackaged food or clean equipment is within about 18 inches. California Health and Safety Code 113953 requires a 6-inch metal splashguard between a hand sink and a warewashing drainboard unless they are 24 inches apart. Ask your health department which number it enforces.

How do I design a commercial kitchen?

Start with the menu and daily meal count, then choose a layout, draw one-way food flow and place a hand sink in every prep, dispensing and warewashing area under FDA Food Code 2026 section 5-204.11. Size the walk-in from CFP’s 0.1 cubic feet per meal, keep 36-inch aisles, and file health plan review before construction, as Food Code 8-201.11 requires.

What do I submit for health department plan review?

Food Code 8-201.12 lists the menu, expected food volume, a layout with mechanical schematics and finish schedules, an equipment list with makes, models and dimensions, and evidence of a food safety management system. Florida DBPR asks for an application, a scale floor plan with equipment labeled and a sample menu; Los Angeles County adds spec sheets.

How long does commercial kitchen plan review take?

It depends on the jurisdiction’s own clock. Los Angeles County targets 20 business days for an initial review, 10 business days for expedited review, and 10 business days for corrected plans. Florida DBPR says online applications are reviewed within 30 days. California’s AB 671, effective January 1, 2026, sets 10 business days for restaurant tenant improvement resubmittals.

Do ADA rules apply inside a commercial kitchen?

Partly. Section 203.9 of the 2010 ADA Standards says employee work areas only need to let people with disabilities approach, enter and exit, so a cook line does not need full accessibility. The route to the kitchen needs 36 inches of clear width under section 403.5.1, and 5 percent of dining seats must meet section 902.