Construction Documents: What Is in the Set, Phase by Phase

Rolled drawing sets in tubes on a plan room table beside a large-format plotter

Construction documents are the drawings and specifications a building is permitted, bid and built from. They form the third design phase, after schematic design and design development; two public fee guides give it 25% to 31% of the architect’s fee.

Key takeaways

  • AIA B101-2017 §3.4.1 defines construction documents as Drawings and Specifications that set out “in detail the quality levels and performance criteria of materials and systems”; §3.4.3 adds the project manual (AIA B101-2017).
  • Washington’s Office of Financial Management assigns 31% of the basic architect and engineer fee to the construction documents phase; Pasco County Schools in Florida assigns 25% in its January 2026 guidelines (WA OFM Chapter 8; Pasco 2026 guidelines).
  • Banks School District in Oregon scheduled its new high school at 3 months of schematic design, 4 of design development and 5 of construction documents, then 4 months of permitting (Banks design schedule, 2025).
  • Under Minnesota Rule 1300.0130, approved documents are stamped “Reviewed for Code Compliance”; the building official keeps one set and the other stays at the site (Minn. R. 1300.0130).
  • Dallas requires U.S. National CAD Standard Version 6 sheet numbers on every e-plan upload, indexed in a fixed order that starts with G (General), then H, V, B, C, L, S and A (City of Dallas EPRS instructions).
  • If bidding has not begun 90 days after the architect submits the construction documents, B101-2017 §6.4 adjusts the owner’s budget to current market prices (B101 §6.4).
NumberWhat it measuresSource
31%Share of the basic A/E fee for the construction documents phase, Washington state projectsWA OFM Ch. 8
25%Same share, Pasco County Schools, Florida (issued January 6, 2026)Pasco 2026
5 monthsConstruction documents phase, Banks High School (September 12, 2025 to February 13, 2026)Banks SD
50% and 90%Progress submittals required inside the construction documents phasePasco; UConn
0%GSA design contingency at final construction documents, down from 5% to 7.5% at design development (new construction)GSA P120 Table 3-1
2,185New listings in MasterFormat 2026, the specification numbering systemCSI

What are construction documents?

Construction documents are the complete drawings and written specifications that describe a building closely enough to permit it, price it and build it (AIA B101-2017 §3.4.1). The set has two halves: drawings organized by discipline, and a project manual holding the specifications and contract conditions. Addenda issued during bidding join the set before the contract is signed.

The AIA A201-2017 general conditions use a wider term, Contract Documents. Under §1.1.1 they are the agreement, the general and supplementary conditions, the drawings, the specifications, addenda issued before signing, other documents the agreement lists, and later Modifications. Instructions to bidders and the contractor’s bid are left out unless the agreement names them.

TermWhat it coversWhere it is defined
DrawingsPlans, elevations, sections, details, schedules and diagrams showing design, location and dimensionsA201-2017 §1.1.5
SpecificationsWritten requirements for materials, equipment, systems, standards and workmanshipA201-2017 §1.1.6
Project manualConditions of the contract plus specifications; may include bidding requirements and sample formsB101-2017 §3.4.3
Construction documentsDrawings and specifications produced in the third design phaseB101-2017 §3.4.1
Contract DocumentsAgreement, conditions, drawings, specifications, pre-signing addenda, listed documents, ModificationsA201-2017 §1.1.1
Permit submittalConstruction documents, a scaled site plan from a boundary survey, and other data the building official requiresMinn. R. 1300.0130 subps. 1 and 4

Several top-ranking guides stretch the term to every project record, from daily logs to closeout files. In B101 and building-code usage it is narrower: the design set. A201-2017 §1.2.1 makes the documents complementary, so a requirement shown in one is binding as if shown in all, and §3.2.2 tells the contractor to report errors it finds as a request for information. Field paperwork answers or supplements the set, as our guide to RFIs in construction explains.

Where do construction documents fit in the design phases?

B101-2017 runs the architect’s basic services in 5 phases: schematic design (§3.2), design development (§3.3), construction documents (§3.4), procurement (§3.5) and construction (§3.6). Each design phase ends with an updated cost estimate and a request for the owner’s approval, and the next phase starts from the approved documents. Washington’s fee guide states the same rule: approve essential elements before the next phase begins (WA OFM).

PhaseWhat the architect deliversCost checkOwner actionGSA design contingency, new building
Schematic design (§3.2)Preliminary design showing scale and relationships (§3.2.4); site plan, preliminary plans, sections and elevations; preliminary selection of major systems and materials (§3.2.5)Estimate of the Cost of the Work (§3.2.6)Approve SD documents (§3.2.7)7.5% to 10% (concept design)
Design development (§3.3)Plans, sections, elevations, typical construction details, diagrammatic layouts of building systems, outline specifications (§3.3.1)Updated estimate (§3.3.2)Approve DD documents and any budget change (§3.3.3)5% to 7.5%
Construction documents (§3.4)Detailed drawings and specifications (§3.4.1); requirements of authorities having jurisdiction (§3.4.2); bidding information, agreement form, conditions and project manual (§3.4.3)Updated estimate (§3.4.4)Approve CDs; act under §6.5 if over budget (§3.4.5)2% to 5% at 75% CD; 1% to 3% at 90%; 0% at final
Procurement (§3.5)Bidding documents: bidding requirements plus proposed Contract Documents; addenda answering bidders (§3.5.2)Bids or proposalsAward, or choose a §6.6 option if bids exceed budgetNot applicable

Clause text is from the AIA B101-2017 preview; contingency ranges are from GSA P120 Table 3-1 (November 7, 2022), a percentage of direct cost that shows how much design uncertainty a federal estimator still carries at each stage.

Banks High School design schedule by phase Gantt bars: schematic design 3 months, design development 4 months, construction documents 5 months, then bidding 2 months and permitting 4 months starting February 16, 2026. Banks High School design schedule: deliverables and durations by phase Banks School District, Oregon, preliminary schedule dated February 12, 2025 Feb 2025 May Sep Jan 2026 Apr Jul Schematic design: 3 months Site plan, preliminary plans, sections, elevations, estimate Design development: 4 months Typical details, system layouts, outline specifications, estimate Construction documents: 5 months Detailed drawings, specifications, project manual; 50% set Nov 25, 2025 Bidding: 2 months Bid set out Feb 16, 2026 Permitting: 4 months Permit set submitted Feb 16, 2026 District review after each design phase: 2 weeks. 100% construction documents set = permit set and bid set (February 13, 2026). Construction listed at 19 months.
Banks School District scheduled 3 months of schematic design, 4 of design development and 5 of construction documents for its new high school, then 4 months of permitting and 2 of bidding (preliminary schedule dated February 12, 2025; deliverables per AIA B101-2017 §3.2 to §3.4).

What happens in the schematic design phase?

The schematic design phase turns the owner’s program into a first design. Under B101-2017 §3.2.2 the architect first tests program, schedule, budget, site and delivery method against each other, then presents a preliminary design for approval (§3.2.4). Pasco County Schools caps it at 3 design solutions and asks for 1/8-inch scale floor plans labeled with room names and areas (Pasco 2026).

What happens in the design development phase?

The design development phase fixes the size and character of the building. B101-2017 §3.3.1 calls for typical construction details, diagrammatic layouts of structural, mechanical and electrical systems, and outline specifications that set quality levels. Washington’s guide asks DD structural documents to set the basic structural system, foundation design criteria and preliminary sizes of major members, and mechanical documents to give approximate equipment sizes and capacities.

What changes in the construction documents phase?

The construction documents phase turns approved DD drawings into a set a contractor can price and build without guessing. Public owners usually check it before 100%: Pasco requires 50% and 90% submittals, UConn asks for cost estimates at 50% and 90% CDs, and GSA cuts design contingency from 2% to 5% at 75% CDs to 0% at final.

A builder hired early under construction management at risk prices the same checkpoints, and our guide to preconstruction services lists what the contractor delivers at each one.

How much of the design fee goes to construction documents?

No single national split exists. AIA B101-2017 §11.5 prints a blank percentage for each phase, so owner and architect write their own. Two public guides fill the blanks differently: Washington’s Office of Financial Management gives the construction documents phase 31% of the basic fee, and Pasco County Schools in Florida gives it 25% in guidelines issued January 6, 2026.

PhaseWashington OFM (2027-29 instructions)Pasco County Schools (2026)AIA B101-2017 §11.5
Program verificationNot a basic-services line5%Not a B101 phase
Schematic design18%15%Blank
Design development20%20%Blank
Construction documents31%25%Blank
Bidding or procurement2%5%Blank
Construction administration27%25%Blank
Closeout2%5%Inside the construction phase
Total100%100%100%
Share of the basic design fee by phase, two public fee guidesGrouped bars: construction documents take 31% of the fee in Washington and 25% at Pasco; design development is 20% in both010.020.030.040.0% of basic A/E fee05Programverification18.015.0Schematicdesign20.020.0Designdevelopment31.025.0Constructiondocuments25Bidding27.025.0Constructionadministration25CloseoutWashington OFMPasco County Schools
Construction documents earn the largest design-phase share in both public guides: 31% in Washington’s 2027-29 instructions and 25% in Pasco County Schools’ January 2026 guidelines. Washington has no program verification line.
What a top-ranking guide saysWhat the primary documents saySource
A design-phase explainer gives about 15% for schematic design, 20% for design development and 40% for construction documents, citing “the AIA five-phase model”B101-2017 §11.5 leaves every phase percentage blank; Washington uses 31% and Pasco 25% for construction documents, so neither public guide reaches 40%B101 §11.5; WA OFM; Pasco
Construction documents include contracts, schedules and site paperworkB101 §3.4.1 limits them to drawings and specifications; the agreement and conditions join them as Contract Documents under A201 §1.1.1B101; A201

What does the split look like on a $6 million office building?

Utah’s Division of Facilities and Construction Management puts office buildings in its Schedule B and sets a 6.73% guideline fee for construction budgets of $5,000,000 to $7,999,999, effective August 1, 2026 (Utah DFCM). On a $6,000,000 budget that is a $403,800 basic fee. The construction documents phase is then worth $125,178 at Washington’s 31% or $100,950 at Pasco’s 25%.

PhaseWashington splitWashington dollarsPasco splitPasco dollars
Program verification0%$05%$20,190
Schematic design18%$72,68415%$60,570
Design development20%$80,76020%$80,760
Construction documents31%$125,17825%$100,950
Bidding2%$8,0765%$20,190
Construction administration27%$109,02625%$100,950
Closeout2%$8,0765%$20,190
Paid by the end of construction documents69%$278,62265%$262,470

Inputs: $6,000,000 construction budget times Utah’s 6.73% gives $403,800; each row multiplies that fee by the phase share. Utah calls its table “guidelines, not a schedule”, and the splits come from other owners, so treat the dollars as an illustration. B101-2017 §11.6 bills each phase against the owner’s most recent budget. Fee levels also move with project type: an Ohio university’s 2026 request for qualifications set 9% to 11.5% on a $1,280,000 walks project, or $115,200 to $147,200 (Ohio FCC RFQ).

How are construction drawing sheets numbered?

Most US drawing sets follow the U.S. National CAD Standard (NCS): each sheet number starts with a discipline letter, then a sheet-type digit, then a sequence number. The City of Dallas requires NCS Version 6 identifiers on every sheet uploaded to its electronic plan review, so its sample sheet A2.00 reads as architectural, elevations, sheet 00 (Dallas EPRS instructions).

Index orderDesignatorDisciplineExample sheets in the Dallas sample index
1GGeneralG0.00 Cover sheet; G0.01 Index; G0.02 Code analysis
2HHazardous materialsNone in sample
3VSurvey/mappingNone in sample
4BGeotechnicalNone in sample
5CCivilC06 Paving plan; C07 Grading plan; C11 Erosion control
6LLandscapeNone in sample
7SStructuralS2 Foundation and framing plans; S3 Foundation sections and details
8AArchitecturalA1.00 First and second floors; A2.00 Elevations; A3.00 Wall sections; A4.00 Details
9IInteriorsI1.2A Ground level reflected ceiling plan; I4.0 Window details and door schedule
10QEquipmentQF-1.0 Equipment plan (food service)
11FFire protectionNone in sample
12PPlumbingP2.01 Ground level floor plan, plumbing
13DProcessNone in sample
14MMechanicalM2.01 Ground level floor plan, mechanical
15EElectricalE2.01 Ground level floor plan, electrical; EL2.01 Lighting
16WDistributed energyNone in sample
17TTelecommunicationsNone in sample
18RResourceNone in sample
19XOther disciplinesNone in sample
20ZContractor/shop drawingsNone in sample
21OOperationsNone in sample
City of Dallas table of National CAD Standard designators with the drawing sheet index order boxed in red
Dallas e-plan rules list the NCS Version 6 discipline designators, the order sheets appear in the index (G, H, V, B, C, L, S, A, I, Q, F, P, D, M, E, W, T, R, X, Z, O) and 10 sheet types. City of Dallas EPRS Drawing Sheet Filename Format Instructions, page 2, accessed November 2, 2026.

The digit after the letters is the sheet type, and Dallas lists 10 of them. A second letter is an optional Level 2 designator: Dallas wants kitchen plans filed under QF (equipment, food service), not FS or K. When plan review comments come back, a revised sheet must keep its exact filename so the system stores it as version 2 rather than a new sheet.

Sheet type digitSheet type
0General
1Plans
2Elevations
3Sections
4Large-scale views
5Details
6Schedules and diagrams
7User defined
8User defined
9Three-dimensional drawings
How to read a National CAD Standard sheet number Sheet A2.00 splits into discipline A, sheet type 2 for elevations and sequence 00; sheet QF1.05 splits into Q equipment, F food service, 1 plans and sequence 05. How to read a National CAD Standard sheet number Two sheet numbers from the City of Dallas plan-set examples (NCS Version 6) A2.00 A Discipline designator A = Architectural 2 Sheet type designator 2 = Elevations .00 Sequence number orders sheets of one type QF1.05 Q Level 1 discipline Q = Equipment F Level 2 discipline (optional) F = Food service 1 Sheet type designator 1 = Plans .05 Sequence number orders sheets of one type Sheet types: 0 General, 1 Plans, 2 Elevations, 3 Sections, 4 Large-scale views, 5 Details, 6 Schedules and diagrams, 7 and 8 User defined, 9 Three-dimensional drawings.
Sheet A2.00 reads as Architectural, Elevations, sequence 00; QF1.05 as Equipment, Food service, Plans, sequence 05. Examples from the City of Dallas EPRS instructions (NCS Version 6), accessed November 2, 2026.

How is the project manual organized?

The project manual is the written half of the construction documents. It follows CSI MasterFormat, whose 2026 edition added 2,185 listings and reorganized 617 (CSI standards overview). Sections carry 6-digit numbers grouped into divisions, and each is written in 3 parts, General, Products and Execution, as in federal section UFGS 01 33 00 (August 2026).

A real example shows the scale. The Ojai Permanent Supportive Housing permit-set project manual, dated November 7, 2025, runs to 3 volumes and uses 18 divisions; volume 3 holds the 28-page soil report.

DivisionTitle in the Ojai manualExample section
00Procurement and contracting requirements00 00 00 Introduction to procurement and contracting documents (54 pages)
01General requirements01 25 00 Substitution procedures; 01 33 00 Submittal procedures
03Concrete03 30 00 Cast in place concrete
04Masonry04 20 00 Unit masonry
05Metals05 50 00 Metal fabrications
06Wood, plastics, and composites06 17 53 Metal-plate-connected wood trusses
07Thermal and moisture protection07 21 00 Thermal insulation; 07 84 13 Penetration firestopping
08Openings08 71 00 Door hardware
09Finishes09 29 00 Gypsum board
10Specialties10 44 16 Fire extinguishers
11Equipment11 30 13 Appliances
12Furnishings12 36 23.13 Plastic laminate clad countertops
22Plumbing22 40 00 Plumbing fixtures
23Heating, ventilating and air conditioning23 05 93 Testing, adjusting and balancing
26Electrical26 00 00 Electrical (23 pages)
31Earthwork31 23 16 Excavation
32Exterior improvements32 12 16 Asphalt paving
33Utilities33 31 00 Sanitary sewerage piping

Division 01 is where the paperwork rules sit. Section 01 33 00 sets how shop drawings and product data come back for review, and our guide to submittals in construction covers review periods and the log.

What is the difference between a permit set, bid set and construction set?

They are the same construction documents issued for 3 different jobs. The permit set goes to the building department for code review, the bid set goes to contractors with bidding requirements attached, and the construction set folds in addenda and bid-phase answers once the contract is signed. On Banks School District’s 2025 schedule, one 100% CD set served as both permit set and bid set (Banks).

SetPurposeWhat it containsSigned or stamped bySource
Permit setCode review and building permitConstruction documents, scaled site plan, other data; Pasco asks for 3 signed and sealed 24 x 36 inch sets and 3 specification booksDesign professional’s seal; building official’s “Reviewed for Code Compliance” stampFla. Stat. 481.221(2); Minn. R. 1300.0130; Pasco
Bid setContractor pricingBidding requirements plus proposed Contract Documents; addenda answer bidder questionsArchitect issues addenda for the ownerB101 §3.5.2
Conformed set issued for constructionBuilding the workDrawings and specifications updated with addenda, supplemental instructions, sketches and RFI answers from the bid phaseDesign team; becomes the stamped Contract DocumentsUConn solicitation, 2025
Revised permit sheetsChanges after approvalRevised sheets keep the original filename in Dallas; nonconforming work stops until changes are approvedBuilding officialDallas; Minn. R. 1300.0130 subp. 6

Permits can also be split. Minnesota Rule 1300.0130 subpart 8 lets the building official permit foundations or other parts before the whole set is submitted, at the permit holder’s own risk. Banks scheduled early utilities on a separate permit, with 3 months of permitting from March 3 to June 2, 2025, starting while the high school was still in schematic design.

Florida Statutes 481.221(2) requires final construction documents filed for public record to carry the architect’s signature, seal and date, and allows electronic sealing. Plan review timing and fees are set locally, and our guide to commercial building permits covers that step.

What does the owner approve, and when?

Under B101-2017 the owner signs off at least 3 times before bidding: schematic design (§3.2.7), design development (§3.3.3) and construction documents (§3.4.5). Section 5.3 requires decisions “in a timely manner”, and §4.2.1.4 makes extra work caused by late owner decisions a paid Additional Service. Public owners write review windows into their contracts: Pasco allows at least 1 week for SD and 2 weeks for DD and CDs.

  1. Before design starts: give the architect a written program (§5.1), a budget for the Cost of the Work (§5.2), a named representative (§5.3), site surveys (§5.4) and geotechnical reports (§5.5).
  2. Schematic design: approve the preliminary design (§3.2.4), then the SD documents and estimate (§3.2.6, §3.2.7). Review window: 1 week minimum at Pasco, 2 weeks at Banks.
  3. Design development: approve the DD documents, outline specifications and updated estimate, and authorize any budget change (§3.3.1, §3.3.3). Review window: 2 weeks at Pasco and Banks.
  4. Progress sets: review the 50% and 90% CD sets and their cost estimates where the contract calls for them; Banks allowed 2 weeks for its 50% estimate.
  5. Construction documents: approve the set (§3.4.5). If the architect’s estimate exceeds the budget, adjust size, quality or budget (§6.5).
  6. Procurement: start bidding within 90 days of CD submission, or the budget is re-based to market prices (§6.4).
  7. Bids over budget: choose one of 5 §6.6 options: raise the budget, rebid, terminate, cut scope with the architect, or another agreed path. Under §6.7 the architect redesigns at no extra fee unless market conditions it could not foresee caused the overrun.

This is a summary of standard-form text, not legal advice; the signed agreement and its amendments control. Our overview of AIA contract documents shows which forms pair with B101, and the builder-side duties sit in AIA A201.

How long does the construction documents phase take?

Public schedules put the construction documents phase at 22 calendar days for a library reroof and 3 to 5 months for school buildings, and in each of the 3 schedules below it is the longest or equal-longest design phase. Banks School District gave its auxiliary gym 3 months of CDs and its high school 5, followed by 3 and 4 months of permitting.

ProjectSchematic designDesign developmentConstruction documentsPermittingBiddingSource
Banks High School, Oregon (schedule of February 12, 2025)3 months4 months5 months4 months2 months, alongside permittingBanks SD
Banks auxiliary gym, pre-engineered metal building2 months3 months3 months3 months2 monthsBanks SD
Lopez Island Library reroof, Washington (revision of May 12, 2026)15 days, with as-built survey15 days22 days30 days39 daysLopez Island schedule

Owner reviews and parallel approvals stretch the calendar. Banks added 2-week district reviews after each phase, a 2-week cost estimate at 50% CDs and a 120-day land-use review based on DD documents. From the start of schematic design to permit submittal, the high school took about 12 months (February 10, 2025 to February 16, 2026); the gym’s design phase was listed at 8 months, and high school construction at 19 months.

For a lump-sum bid, the bid set goes out only after 100% CDs, and our comparison of design-build and design-bid-build shows how other delivery methods overlap design and pricing.

Which construction document set do you need for your next step?

Match the set to the decision in front of you. Pull a permit on the 100% set, sign a lump-sum contract on the bid set plus addenda, and build from the conformed set. If you need a price ceiling sooner, a construction manager at risk can estimate at design development and at 50%, 75% and 100% CDs, as in the Texas State University System contract §5.4.2.

IfThenThreshold or ruleSource
You are applying for a building permitSubmit the 100% CD set, signed and sealedFinal documents filed for public record carry signature, seal and dateFla. Stat. 481.221(2)
Foundations must start before the full set is doneAsk for a phased permitIssued at the holder’s own risk, with no assurance of the full permitMinn. R. 1300.0130 subp. 8
You are bidding a lump sumIssue the bid set and answer every question by addendumAddenda issued before signing are Contract DocumentsB101 §3.5.2; A201 §1.1.1
You need a price before CDs are finishedHire a CM at risk and take estimates at DD and 50% to 100% CDsGSA still carries 5% to 7.5% design contingency at DDTXST CMAR §5.4.2; GSA P120
Bidding has not started 90 days after CD submissionRe-base the budget to current prices90 daysB101 §6.4
The lowest bid is over budgetPick one of 5 options; redesign is at the architect’s cost unless market conditions caused it§6.6 and §6.7B101-2017
The contract is signed and addenda existIssue a conformed set for constructionIncludes addenda, supplemental instructions and RFI answersUConn, 2025
The building is finishedCollect record and as-built drawingsSeparate closeout deliverableSee below
Which construction document set do you need next Three yes or no questions route the reader to the permit set, the bid set, the conformed construction set, or earlier pricing at DD or 50 to 90 percent CDs. Which construction document set do you need next? Applying for the building permit? Yes: go right. No: go down. Yes Permit set 100% CDs, signed and sealed; plan review comments answered Pricing a lump-sum bid? Yes: go right. No: go down. Yes Bid set 100% CDs plus bidding requirements; questions answered by addendum Contract signed and addenda issued? Yes: go right. No: go down. Yes Conformed set for construction CDs updated with addenda and bid-phase RFI answers No No No Not yet: price earlier A CM at risk can estimate at design development and at 50%, 75% and 100% CDs (Texas State University System CM-at-Risk contract, section 5.4.2)
Three questions pick the set: permit set for code review, bid set with addenda for lump-sum pricing, conformed set once the contract is signed; earlier prices come from a CM at risk (B101-2017 §3.5.2; TXST CMAR §5.4.2). The decision table holds the same logic with sources.

At closeout the set is marked up to match what was built, which our guide to as-built drawings covers. Where the documents sit in the full sequence from feasibility to closeout is mapped in our commercial construction process guide.

Before signing, compare how each bidder priced the same bid set and its addenda, using the checks in our guide on how to compare construction bids.

The finished drawings are what estimators price, step by step, in our guide to how to estimate construction costs, and the MEP sheets are explained in our MEP engineering guide.

How we compiled this

We read 17 primary documents in November 2026: AIA B101-2017 and A201-2017 text, fee guidelines from Washington, Utah and Pasco County Schools, an Ohio request for qualifications, 3 public design schedules, a university CM-at-risk contract, the City of Dallas e-plan rules, Minnesota Rule 1300.0130, Florida Statutes 481.221, the CSI standards page, a city permit-set project manual, a UFGS section and GSA P120. Fee and schedule figures are owner-published guidelines and plans, not survey data or our own projects. We left out figures we found only in secondary blogs.

Frequently asked questions

What is the difference between construction documents and construction drawings?

Construction drawings are one half of the construction documents. AIA A201-2017 §1.1.5 defines Drawings as the plans, elevations, sections, details, schedules and diagrams; §1.1.6 defines Specifications as the written requirements for materials, systems and workmanship. Construction documents are both together, plus the project manual that B101-2017 §3.4.3 has the architect compile with the contract conditions.

What are the 5 phases of architectural design?

AIA B101-2017 lists 5 phases of basic services: schematic design (§3.2), design development (§3.3), construction documents (§3.4), procurement (§3.5) and construction (§3.6). Many public owners add program verification at the start and closeout at the end; Pasco County Schools pays 5% of the fee for each of those two extra steps in its 2026 guidelines.

What do 50%, 90% and 100% construction documents mean?

They are progress milestones inside the construction documents phase. Pasco County Schools requires 50% and 90% submittals, and UConn asks for a cost estimate at each. GSA P120 cuts design contingency for new buildings from 2% to 5% at 75% CDs, to 1% to 3% at 90%, and to 0% at final documents, once the set is complete enough to bid.

Who prepares and signs construction documents?

The architect and its engineering consultants prepare them under the owner-architect agreement, such as AIA B101-2017 §3.4. Each licensed professional seals the sheets of their discipline. In Florida, Statutes 481.221(2) requires final construction documents filed for public record to carry the architect’s signature, seal and date, and allows electronic sealing.

Are construction documents legally binding?

They become binding once the owner-contractor agreement lists them. Under AIA A201-2017 §1.1.1, the drawings, specifications and pre-signing addenda form part of the Contract Documents, and §1.2.1 makes them complementary, so a requirement in one binds as if it were in all. Changes after signing need a Modification, such as a Change Order. This is general information, not legal advice.

Can construction start before construction documents are complete?

Sometimes, through a phased permit. Minnesota Rule 1300.0130 subpart 8 lets the building official permit foundations or other parts before the full set is in, at the holder’s own risk. Banks School District scheduled a separate early-utilities permit in 2025, starting while the high school was still in schematic design. Lump-sum bidding still waits for the 100% set.

How many sets of construction documents does the permit office need?

It depends on the jurisdiction. Minnesota Rule 1300.0130 asks for one or more sets and stamps the approved set “Reviewed for Code Compliance”, keeping one and returning the other for the site. Pasco County Schools’ 2026 permit package calls for 3 signed and sealed 24 x 36 inch drawing sets and 3 specification books. Dallas takes PDF sheets through its e-plan system.