Curtain Wall Guide: Stick-Built vs Unitized vs Storefront, Specs and Cost

Mid-rise commercial building with a glass and aluminum facade partly installed on its lower floors

A curtain wall is a non-load-bearing exterior wall of aluminum framing filled with glass or panels that hangs off the floor slabs and carries only its own weight and wind load, never floor or roof loads.

Key takeaways

  • A stick-built curtain wall is assembled piece by piece on site; a unitized curtain wall arrives as factory-built units that cost more to ship because of their size and weight (U.S. Patent 8,413,403, April 2013).
  • Owner specs ask curtain walls to leak no more than 0.06 cfm of air per sq ft under ASTM E283 and show no water at 15 psf under ASTM E331, while storefront specs accept a water test as low as 8 psf (University of Houston master specs 08 44 13 and 08 41 13, 2018).
  • The 2021 IECC caps the U-factor of fixed curtain wall glazing at 0.50 in climate zone 1 and 0.26 in zone 8 (Table C402.4, U.S. DOE Building Energy Codes Program, February 2021).
  • Where a curtain wall passes a fire-rated floor, the gap needs a perimeter fire containment system tested to ASTM E2307 with an F-rating at least equal to the floor rating (IBC Section 715.4).
  • Miami-Dade County’s 2023 Caleb Center curtain wall bid came in at $5,826,643.47, 37% above the $4,247,991.74 estimate, after storefront material for the job rose from $1.1 million to $2.5 million between 2021 and 2023 (Miami-Dade County agenda item 8(F)(2), December 2023).

What is a curtain wall?

A curtain wall is a lightweight exterior cladding, usually aluminum framing with glass and opaque spandrel panels, that is fastened to the building frame floor to floor. It is generally nonloadbearing: it hangs from the concrete or steel frame instead of being built up from the ground, and it is designed to take structural deflection, control wind-driven rain and air leakage and limit solar heat (U.S. Patent 8,413,403 B2, background section, 2013).

Because the wall carries only its own dead load and the wind on it, the slab edge and anchor clips do the work, and owner specs limit mullion deflection to 1/175 of the span. Each vertical mullion is anchored at the slab, the glass and spandrel panels sit in gasketed pockets, and the gap between the wall and the floor is sealed against fire and smoke. The section diagram below labels the nine parts an owner sees in shop drawings, and the table repeats each label with the standard or spec clause behind it.

Labeled section of a stick-built curtain wall at a floor slab: glass, mullion, spandrel, anchor and fire containment Stick-built curtain wall: vertical section at a floor slab EXTERIOR INTERIOR Concrete floor slab 1 Insulating glass unit(vision glass) 2 Vertical mullion(continuous past slab) 3 Horizontal (transom) 4 Pressure plateand cover cap 5 Spandrel panel, back panand insulation 6 Anchor clip at slab edge 7 Perimeter fire containment(ASTM E2307, IBC 715.4) 8 Weeps drainwater to exterior 9 Thermal break andgaskets on four sides Schematic, not to scale. Parts and standards listed in the table below the figure.
The nine parts of a stick-built curtain wall at a floor slab, from vision glass to the ASTM E2307 perimeter fire containment required by IBC 715.4. Compiled by CB&C from University of Houston and Illinois CDB Section 08 44 13 specs, accessed November 8, 2026.
#PartWhat it doesSpec or standardSource
1Insulating glass unit (vision glass)Lets in light and view; carries the U-factor and SHGC ratingNFRC 100 (U-factor), NFRC 200 (SHGC)Illinois CDB 08 44 13, 2021
2Vertical mullionSpans floor to floor and takes wind load to the anchorsDeflection 1/175 of span up to 13 ft 6 in.UH 08 44 13
3Horizontal (transom)Holds the glass and spandrel edges between mullionsSame deflection limits, glazing bite kept at 75% or moreUH 08 44 13
4Pressure plate and cover capClamps the glass from outside in a stick systemGlazing plane: front; gaskets on four sidesIllinois CDB 08 44 13
5Spandrel panel, back pan and insulationHides the slab edge and ceiling plenumCounted as opaque wall, not fenestration, in the window-to-wall ratioWAC 51-11C-40231
6Anchor clip at slab edgeConnects the wall to the frame and allows movementDesigned for story drift, creep and live load deflectionUH 08 44 13
7Perimeter fire containmentSeals the gap between wall and rated floorASTM E2307, F-rating at least the floor ratingIBC 715.4
8WeepsDrain water that gets into the frame back outsideShop drawings must show drainage to the exteriorUH 08 44 13
9Thermal break and gasketsCut heat flow through the aluminum and seal the glassFraming construction: thermally brokenIllinois CDB 08 44 13
Concrete floor slabThe structure the wall hangs from (interior side)Exterior and interior faces shown left and rightU.S. Patent 8,413,403

Stick-built vs unitized vs storefront: what is the difference?

Stick-built and unitized curtain walls both hang off the slab edge and span floors; they differ in where the wall is put together. Storefront is a separate product, specified under Section 08 41 13, set between the floor and the structure above and tested to lower water pressure. The table sets the three side by side with each row’s source (UH 08 41 13 storefront spec).

FeatureStick-built curtain wallUnitized curtain wallStorefrontSource
Spec section (MasterFormat)08 44 1308 44 13 family08 41 13UH master specs
Where it is assembledOn site, part by partIn a factory as complete unitsOn site, frame then glassU.S. Patent 8,413,403
Main cost riskSite labor; quality control of wet sealants on siteShipping: large, heavy units, few per containerLower water test floor; not specified as a slab-hung wallU.S. Patent 8,413,403
Static water test (ASTM E331)20% of design wind pressure, not less than 15 psfSame as stick in owner specs20% of design wind pressure, not less than 8 psfUH 08 41 13 and 08 44 13
Dynamic water testAAMA 501.1 in lab mockupAAMA 501.1 in lab mockupNot required in the UH storefront specIllinois CDB 08 44 13
Air leakage (ASTM E283)0.06 cfm/sq ft at 6.24 psf0.06 cfm/sq ft at 6.24 psf0.06 cfm/sq ft at 6.24 psfUH 08 41 13 and 08 44 13
Seismic and interstory movementAAMA 501.4 and 501.7 at 1.5 times design displacementSameStory drift design only; no AAMA 501.4 test listedIllinois CDB 08 44 13
Typical useGlazed aluminum walls installed as stick assemblies (UH spec)Ready-to-install units anchored to the structure, often high-riseExterior storefront framing, ribbon walls, punched openings, entrance doorsUH 08 41 13

When is storefront enough instead of a curtain wall?

Storefront is enough when the glass sits inside one story, spans from the floor to the structure above and the specified water test is 8 psf rather than 15 psf. The University of Houston storefront spec covers ground-floor framing, ribbon walls, punched openings and swing entrance doors, and asks for the same 0.06 cfm/sq ft air leakage as its curtain wall spec (UH 08 41 13, revision January 29, 2018).

Two lines in a spec push a project from storefront to curtain wall. The first is any glazing that runs past a floor slab or hangs from the slab edge, because storefront framing is not anchored as a floor-to-floor hung wall. The second is a water test above 8 psf or an AAMA 501.1 dynamic water test, which the University of Houston storefront spec does not call for. A one-story retail shell with 10 ft of glass and a 25 psf design wind pressure meets the storefront floor of 8 psf, since 20% of 25 psf is 5 psf.

What tests must a curtain wall pass?

A curtain wall is tested twice: in a laboratory mockup before fabrication and on the building after install. The lab sequence checks air leakage (ASTM E283), static water (ASTM E331), dynamic water (AAMA 501.1), structural load (ASTM E330) and movement (AAMA 501.4 and 501.7). Field checks repeat air and water tests on a bay at least 30 ft wide and one story tall (UH 08 44 13, Section 3.3).

TestWhat it measuresPass line in public owner specsSource
ASTM E283Air leakage through fixed glazing and framing0.06 cfm/sq ft at 6.24 psf (UH); 0.06 cfm/sq ft at 1.57 psf, 75 Pa (Illinois)UH and Illinois CDB 08 44 13
ASTM E331Water penetration under static pressureNo leak at 20% of positive design wind pressure, not less than 15 psfUH 08 44 13
AAMA 501.1Water under dynamic pressure (wind generator)No uncontrolled water on interior facesIllinois CDB 08 44 13
ASTM E330Structural performance under uniform loadNo failure at 150% of design pressure; permanent set 0.2% of span or less; 10 s durationUH 08 44 13
AAMA 501.4Seismic racking (in-plane drift)Pass at design displacement and 1.5 times design displacementIllinois CDB 08 44 13
AAMA 501.7Vertical interstory movementPass at design displacement and 1.5 times design displacementIllinois CDB 08 44 13
AAMA 1503Condensation resistance factor (CRF)CRF 80 or moreIllinois CDB 08 44 13
ASTM E783 (field)Air leakage of installed wall1.5 times the lab rate; at least three test areasUH 08 44 13
ASTM E1105 (field)Water of installed wall, static pressure0.67 times the lab pressure, not less than 8 psf; at least three testsUH 08 44 13
AAMA 501.2 (field)Water spray hose test at jointsNo penetration; at least five tests before interior finishesUH 08 44 13

How do the test numbers work out on a real project?

The pass lines are formulas, so the wind design pressure on the drawings sets the actual test pressure. The worked table applies the University of Houston and Illinois clauses to two example design pressures (40 and 90 psf) and two mullion spans (12 and 16 ft); every input is shown so an owner can repeat the arithmetic for their own building.

CheckInputsArithmeticResultRule source
Lab water test, low-riseDesign pressure 40 psf20% x 40 = 8 psf; floor is 15 psfTest at 15 psfUH 08 44 13, 1.2.E
Lab water test, high-riseDesign pressure 90 psf20% x 90 = 18 psfTest at 18 psfUH 08 44 13, 1.2.E
Field water testLab pressure 15 psf0.67 x 15 = 10.05 psf; floor is 8 psfTest at 10.05 psfUH 08 44 13, 3.3.B.2
Field air testLab limit 0.06 cfm/sq ft1.5 x 0.060.09 cfm/sq ftUH 08 44 13, 3.3.B.1
Structural proof loadDesign pressure 40 psf, 144 in. span1.5 x 40 = 60 psf; 0.2% x 144 in.60 psf, set 0.29 in. or lessUH 08 44 13, 1.2.C
Deflection, 12 ft mullionSpan 144 in.144 / 1750.82 in. maximumIllinois CDB 08 44 13, D.1
Deflection, 16 ft mullionSpan 192 in. (over 13 ft 6 in.)192 / 240 + 0.251.05 in. maximumIllinois CDB 08 44 13, D.1

What U-factor and SHGC does the energy code require for a curtain wall?

Under the 2021 International Energy Conservation Code (IECC), fixed vertical fenestration, which includes curtain wall glazing, must have a U-factor of 0.50 or less in climate zone 1, tightening to 0.36 in zones 4 and 5 and 0.26 in zone 8. Solar heat gain coefficient (SHGC) limits run from 0.23 to 0.40 for fixed glazing with little shading (Table C402.4, U.S. DOE webinar slides 15 and 16, February 2021).

U-factor is the heat flow through the whole product in Btu per hour per sq ft per degree F, so lower is better in cold zones. SHGC is the share of solar heat that passes through, so lower is better in hot zones. The 2021 edition splits both limits into fixed and operable rows, and the SHGC values below apply where the projection factor (PF, the overhang depth divided by its height above the sill) is under 0.2.

Climate zoneFixed U-factorOperable U-factorEntrance door U-factorFixed SHGC (PF under 0.2)Operable SHGC (PF under 0.2)Source
Zone 10.500.620.830.230.212021 IECC Table C402.4 via DOE
Zone 20.450.600.770.250.232021 IECC Table C402.4 via DOE
Zone 30.420.540.680.250.232021 IECC Table C402.4 via DOE
Zone 4 except marine0.360.450.630.360.332021 IECC Table C402.4 via DOE
Zone 5 and marine 40.360.450.630.380.332021 IECC Table C402.4 via DOE
Zone 60.340.420.630.380.342021 IECC Table C402.4 via DOE
Zone 70.290.360.630.400.362021 IECC Table C402.4 via DOE
Zone 80.260.320.630.400.362021 IECC Table C402.4 via DOE
2021 IECC Table C402.4 U-factor rows from a DOE slide, fixed fenestration row boxed from 0.50 to 0.26
2021 IECC Table C402.4 as shown on U.S. DOE Building Energy Codes Program slide 15 (February 2021): the boxed fixed fenestration row falls from U-0.50 in zone 1 to U-0.26 in zone 8. Struck values are the 2018 limits. Accessed November 8, 2026.
Maximum U-factor for curtain wall glazing by climate zoneBar chart: fixed U-factor limits fall from 0.50 in zone 1 to 0.26 in zone 8; operable from 0.62 to 0.32.00.20.40.60.8Btu/h-sq ft-F0.50.62Zone 10.450.6Zone 20.420.54Zone 30.360.45Zone 4except mari…0.360.45Zone 5 andmarine 40.340.42Zone 60.290.36Zone 70.260.32Zone 8FixedOperable
Fixed curtain wall glazing must reach U-0.36 in zones 4 and 5 and U-0.26 in zone 8 under the 2021 IECC; operable units get looser limits, 0.45 and 0.32. Source: Table C402.4 via U.S. DOE, accessed November 8, 2026.

Which edition applies depends on the state. As of October 2026, 15 states use ASHRAE 90.1-2019 or the 2021 IECC, 10 enforce the newer 90.1-2022 or 2024 IECC and 10 have no statewide commercial code, as tracked in our commercial energy code by state report.

How much of the wall can be glass?

The prescriptive path limits total glass, not just its quality. Washington’s version of the 2021 IECC caps vertical fenestration at 30% of gross above-grade wall area, excluding opaque spandrel panels, and allows up to 40% when the building meets an optimized daylighting or high-performance fenestration alternate (WAC 51-11C-40231).

That high-performance alternate sets curtain wall U-factors of 0.31 fixed and 0.36 operable. On a building with 40,000 sq ft of gross wall, 30% is 12,000 sq ft of glass and 40% is 16,000 sq ft. A fully glazed tower usually goes through the performance path instead, so check your state’s text.

How do fire codes treat a curtain wall?

The building code treats a curtain wall as a nonbearing exterior wall, so its rating comes from fire separation distance, not from construction type alone. Where it passes a fire-resistance-rated floor, International Building Code (IBC) Section 715.4 requires an approved perimeter fire containment system tested to ASTM E2307, with an F-rating at least equal to the floor’s rating; at a nonrated floor, Section 715.5 asks for an approved fill (IBC Chapter 7, ICC).

Exterior nonbearing walls are rated separately from the frame under IBC Table 601, by distance to the lot line under Table 705.5, which is why our types of construction guide lists them apart from the five frame elements. In a Type IIB building, a Group M or S-1 exterior wall needs 2 hours under 5 ft from the lot line and 1 hour at 5 to under 10 ft, and Table 705.9 limits unprotected openings in that band. A glass curtain wall therefore works best at 10 ft or more of separation, and the build-ups for rated walls closer in are in our fire rated wall guide.

SituationCode ruleWhat the curtain wall needsSource
Wall passes a rated floor (most multi-story offices)IBC 715.4, 715.4.1Perimeter fire containment tested to ASTM E2307; F-rating at least the floor ratingIBC 2024 Ch. 7
Wall passes a nonrated floorIBC 715.5Void filled with approved material to slow fire and hot gasIBC 2024 Ch. 7
Wall under 10 ft from the lot lineIBC Table 705.5 and 705.9Fire-resistance rating for the wall and limits on unprotected glass openingsIBC 2024 Ch. 7
Wall 30 ft or more from the lot lineIBC Table 705.5No exterior wall rating for Groups B, M and S-1IBC 2024 Ch. 7

How much does a curtain wall cost?

Public records show curtain wall jobs from about $24,000 for one replaced glass panel to $5.8 million for a four-floor replacement, with the size of the wall rarely stated. Miami-Dade County’s Caleb Center base bid was $5,826,643.47 in April 2023 for curtain wall on floors 3 to 6, storefront, waterproofing and HVAC retrofit (Miami-Dade County, December 2023).

The table lists 10 public awards and bids, dated 2019 to 2025, found on USAspending.gov and in county and university records. Every amount is the total contract or low bid, installed, and most include other scope, so treat them as project-scale anchors rather than unit prices. Contractor names are left out.

Owner and placeScopeAmountDateSource
Miami-Dade County, Caleb Center, Miami, FLReplace curtain wall floors 3 to 6, storefront, waterproofing, VAV retrofit; 365-day contract; 1 bid$5,826,643.47 base bid ($6,409,307.82 with 10% contingency)Bid April 13, 2023Miami-Dade agenda 8(F)(2)
U.S. Army Corps of Engineers, VirginiaDemolish and replace two curtain wall systems with doors$4,033,740Sept. 29, 2025USAspending W912DR25CA013
GSA, Dan M. Russell Jr. U.S. Courthouse, Gulfport, MSRepairs to south curtain wall and sunscreens$2,915,780.54July 9, 2021USAspending 47PE0521F0098
GSA, Charles F. Prevedel Federal Building, Olivette, MOReplace the curtain wall$2,673,502Nov. 15, 2023USAspending 47PG0224F0004
Penn State, Warnock Commons, University Park, PAReplace windows, curtain walls and storefront, new canopies and entrance doors$1,261,361 low base bid; bird-safe glass alternate $72,000March 13, 2025Penn State bid tab 00-09954.00
Department of Veterans Affairs, OhioReplace surgery curtain wall$849,378.02March 14, 2019USAspending 36C25019C0096
Summit County, Medical Examiner, Akron, OHRedesign and replace two-story curtain walls and two entry storefronts; 1 bid$385,332 (authorized up to $450,000)May 28, 2025Summit County Res. 2025-168
FAA, O’Hare air traffic control tower, Chicago, ILRepair ground-floor curtain wall$50,969.25April 1, 2025USAspending 697DCK25C00118
GSA, Neal Smith Federal Building, Des Moines, IAReplace 6th floor curtain wall glass$26,714July 10, 2023USAspending 47PG0423F0049
GSA, Federal Building, Pierre, SDRemove and replace one curtain wall glass panel$23,993Sept. 16, 2020USAspending 47PJ0020P0134

None of the 59 federal award records we pulled or the four local award documents states the glazed area, so a defensible installed cost per sq ft could not be computed from them. To get one, ask bidders to price the curtain wall as its own line in the bid comparison and divide by the elevation area on the drawings. Single-bid results like Miami-Dade’s and Summit County’s, both drawing one responsive bid in 2023 and 2025, are a sign to carry extra construction contingency for the envelope.

What moves curtain wall prices and lead times?

Aluminum and fabricated metal prices moved curtain wall costs more than glass did. From the 2019 average to the 2026 January to September average, the producer price index for metal window and door manufacturing rose 91.7%, aluminum rolling, drawing and extruding rose 101.5%, and flat glass rose 35.6% (BLS PPI, series PCU332321332321).

YearMetal window and door mfg. (2019 = 100)Flat glass (2019 = 100)Aluminum extruding (2019 = 100)Source
2019100.0100.0100.0BLS PPI annual averages
2020102.3102.294.2BLS PPI annual averages
2021119.3107.0121.4BLS PPI annual averages
2022155.4117.0141.6BLS PPI annual averages
2023159.5125.7133.2BLS PPI annual averages
2024161.4131.5132.0BLS PPI annual averages
2025173.8134.0152.8BLS PPI annual averages
2026 (Jan to Sep)191.7135.6201.5BLS PPI annual averages
Curtain wall input prices since 2019Line chart: from 2019 = 100, aluminum extruding reached 201.5, metal windows and doors 191.7 and flat glass 135.6 in 2026.75.0100125150175200225index (2019 = 100)20192020202120222023202420252026 (Jan to Sep)Metal window and door mfg.Flat glassAluminum extruding
Against 2019 prices, aluminum extruding roughly doubled (201.5) and metal window and door manufacturing reached 191.7 by January to September 2026, while flat glass rose to 135.6. Source: BLS PPI, accessed November 8, 2026.

The 2026 jump in aluminum follows the Section 232 duty of 50% on aluminum, charged on full customs value since April 6, 2026 (Proclamation 11021, 91 FR 18201). Our construction material tariffs tracker follows each action. In September 2026 the aluminum extruding index stood at 406.526, 26.3% above September 2025, while the metal window and door index rose 7.1% over the same 12 months.

Public records show durations more often than fabrication lead times. Miami-Dade set 365 calendar days for its four-floor replacement, and the Illinois bridging spec requires a contractor-run laboratory mockup before fabrication, which adds a test cycle to the front of the schedule. Ask each bidder for submittal, mockup, fabrication and install durations as separate lines so they can be compared.

How is a curtain wall designed, tested and warrantied?

Owner specs make the curtain wall a delegated design: the architect sets performance criteria, and the installer’s licensed engineer designs the anchors, mullions and glass to meet them. Shop drawings, lab mockup tests, field tests and a two-part warranty follow, in the order below (Illinois CDB 08 44 13, August 2021).

  1. Architect sets wind load, deflection (1/175 of span up to 13 ft 6 in.), air, water, U-factor and SHGC targets in Section 08 44 13.
  2. Installer’s professional engineer completes the delegated design for anchors, framing and glass.
  3. Shop drawings, product data and energy labels go through submittals, including details of drainage to the exterior and expansion joints.
  4. A laboratory mockup is tested to ASTM E283, ASTM E331, AAMA 501.1, ASTM E330, AAMA 501.4 and AAMA 501.7 before fabrication.
  5. Units or parts are fabricated and installed; perimeter fire containment is placed at each rated floor to ASTM E2307.
  6. A testing agency hired by the owner runs field tests: at least three ASTM E783 air tests, three ASTM E1105 water tests and five AAMA 501.2 hose tests before interior finishes.
  7. The owner records the warranty: 10 years on materials and workmanship and 20 years on the finish in the Illinois spec.

Field tests and the envelope checks in building commissioning overlap, so assign each test to one party in the contract. The UH spec, revised January 29, 2018, makes failed areas defective and charges retesting to the contractor.

Which curtain wall system fits your project?

Pick the system from three facts: whether the glass crosses a floor slab, whether the specs require water testing at 8 psf or 15 psf, and whether on-site labor and sealing or shipping large units is the bigger risk on your site. The decision table carries the thresholds, and the flowchart below it shows the same logic with the code checks that apply to every option.

If your project hasThen useWhy (threshold)Source
Glass inside one story, floor to structure above, water test 8 psf, no dynamic water testStorefront (08 41 13)Storefront spec floor is 8 psf under ASTM E331UH 08 41 13
Glass crossing a floor slab, or a water test of 15 psf or moreCurtain wall (08 44 13)Curtain wall spec floor is 15 psf plus AAMA 501.1UH 08 44 13
Curtain wall, modest quantity, varied bays, skilled glazing labor availableStick-builtBuilt up on site; labor and sealant quality control happen on siteU.S. Patent 8,413,403
Curtain wall, many repeated units, on-site labor or sealing is the main riskUnitizedFactory assembly; shipping cost rises with unit size and weightU.S. Patent 8,413,403
Design wind pressure above 75 psfCurtain wall tested at 20% of designWater test rises above the 15 psf floor (for example 18 psf at 90 psf)UH 08 44 13
Seismic regionSystem tested to AAMA 501.4 and 501.7Pass at 1.5 times design displacementIllinois CDB 08 44 13
Climate zone 7 or 8Glazing with fixed U-factor 0.29 or 0.26 or less2021 IECC Table C402.4DOE, 2021
Hurricane coastImpact-rated systemMiami-Dade specified a hurricane impact resistant curtain wall in 2023Miami-Dade 2023
Flowchart choosing storefront, stick-built or unitized curtain wall from three questions, plus four code checks Storefront, stick-built or unitized curtain wall? Q1: Does the glass run past a floor slab or hang off the slab edge? No Q2: Does the spec accept a water test of 8 psf (ASTM E331) and no AAMA 501.1 dynamic water test? Yes No Storefront Section 08 41 13 Stick-built curtain wall, 08 44 13 Yes Q3: Is on-site labor and on-site sealing a bigger risk than shipping large, heavy factory-built units? No Yes Stick-built assembled on site Unitized factory-built panels Then check, whichever system you pick: Rated floor? Perimeter fire containment tested to ASTM E2307, F-rating at least the floor rating (IBC 715.4). Energy code: fixed U-factor 0.50 (zone 1) to 0.26 (zone 8) under 2021 IECC Table C402.4. Glass area: Washington caps vertical fenestration at 30% of wall, 40% with alternates (C402.4.1). Near a lot line? Exterior wall rating and opening limits come from IBC Tables 705.5 and 705.8.
Three questions pick the system: does glass cross a slab, does the spec accept an 8 psf water test, and is on-site labor and sealing a bigger risk than shipping large units. Then check IBC 715.4, IECC Table C402.4, the 30% glass cap and IBC 705.5. Compiled by CB&C.

In Florida’s High-Velocity Hurricane Zone, impact and product approval rules add a further layer covered in our High-Velocity Hurricane Zone construction guide.

Interior partitions that meet the curtain wall are framed with the studs in our metal stud sizes guide.

Our fire separation distance guide lists the full Table 705.8 opening limits, from none under 3 ft to no limit at 30 ft.

How we compiled this

We read 13 primary documents in November 2026: two University of Houston master specs, an Illinois Capital Development Board curtain wall spec, U.S. DOE’s 2021 IECC slides with Table C402.4, Washington’s adopted energy code text, a U.S. patent background, IBC Chapter 7, two county records, one university bid tab and federal tariff and price data. We added 59 USAspending.gov award records and three BLS producer price series. The ICC code reader refused automated access, so IBC 715.4 was checked in a public reproduction of the California code. We did no testing, and local amendments can change any number here.

Frequently asked questions

Is a curtain wall load-bearing?

No. A curtain wall is generally nonloadbearing: it hangs from the concrete or steel frame and carries only its own weight plus wind, seismic and thermal movement loads to anchors at each slab edge (U.S. Patent 8,413,403, 2013). Floor and roof loads stay in the frame, which is why the anchor clips and mullion spans, limited to 1/175 of span up to 13 ft 6 in., matter most.

What is the difference between a curtain wall and storefront?

Storefront sits within one story, from the floor to the structure above, and owner specs test it for water at 8 psf or more. A curtain wall hangs off the slab edge, can span several floors and is tested at 15 psf or more plus an AAMA 501.1 dynamic water test (University of Houston specs 08 41 13 and 08 44 13, 2018).

What is a spandrel panel in a curtain wall?

A spandrel panel is the opaque section of a curtain wall that hides the slab edge, ceiling plenum and fire containment between vision glass bands. It can be glass or metal, and shop drawings show any back pan and insulation behind it. Washington’s energy code excludes opaque spandrel panels from the 30% window-to-wall limit in Section C402.4.1, so they count as wall, not glass.

Does a curtain wall need to be fire rated?

The glass itself usually does not, but the joint does. At each fire-resistance-rated floor, IBC Section 715.4 requires a perimeter fire containment system tested to ASTM E2307 with an F-rating at least equal to the floor. The wall needs its own rating only when it sits close to a lot line under IBC Table 705.5, for example 2 hours under 5 ft for Group M in Type IIB.

What is AAMA 501.2 testing?

AAMA 501.2 is a field water spray test: installed curtain wall joints are sprayed from outside while the inside is checked for leaks. The University of Houston spec requires at least five of these tests, in areas the architect picks, before interior finishes go in, alongside three ASTM E1105 tests at 0.67 times the lab water pressure but not less than 8 psf.

How long is a curtain wall warranty?

Public owner specs set two terms. The Illinois Capital Development Board’s 2021 curtain wall section asks for 10 years on materials and workmanship and 20 years on the finish. Ask the bidder which party holds each warranty, whether the glass seal failure term is separate, and whether failed field tests void any part of it.