Skip to content

Compaction Test: Proctor vs Field Density, Required Percentages, Frequency and Cost

Vibratory roller on a graded fill pad at a commercial building site

A compaction test compares the dry density of a compacted fill lift, read in the field by nuclear gauge or sand cone, with the lab maximum from a Proctor test: commercial pads usually need 90 to 95 percent.

Key takeaways

  • Percent compaction is field dry density divided by lab maximum dry density, times 100: a lift at 105.7 lb/ft3 against a 111.3 lb/ft3 standard is 95 percent (WAQTC FOP for AASHTO T 310, WSDOT Materials Manual, January 2026).
  • The modified Proctor (ASTM D1557) uses a 10 lb rammer dropped 18 in on 5 layers, about 4.5 times the 12,375 ft-lb/ft3 of the standard test (ASTM D698) (WAQTC FOP for AASHTO T 99/T 180).
  • The federal earthwork guide spec asks for 90 percent of lab maximum for cohesive structural fill and 95 percent for cohesionless fill, in loose lifts of 8 in or less (UFGS 31 00 00, August 2023).
  • Its default test rate is one density test per 2,000 sq ft of each lift, doubled where hand tampers do the compacting, plus one Proctor per 500 cubic yards of fill (UFGS 31 00 00 Table 1).
  • Public rate sheets price a Proctor at $140 to $288 and a field density test at $28 to $34 each, plus a technician at $55 to $129 an hour (Utah DFCM, July 2026; City of Hidalgo, Texas, 2022).

What is a compaction test?

A compaction test is a pair of measurements. A lab compacts samples of the fill at rising moisture contents to find its maximum dry density and optimum moisture (the Proctor test). A field technician then reads the density and moisture of each compacted lift on site and reports it as a percentage of that lab maximum. The specification sets the minimum percentage and often a moisture window around optimum.

Under the 2024 International Building Code, a special inspector verifies “materials, densities and lift thicknesses during placement and compaction of compacted fill” on a continuous basis (IBC Section 1705.6 and Table 1705.6). Our guide to special inspections covers who hires that inspector and what the full program costs. The numbers below are the ones a commercial owner or builder meets most often.

ItemValueSource
Standard Proctor energy12,375 ft-lb/ft3 (ASTM D698 / AASHTO T 99)WAQTC FOP T 99/T 180, Table 2
Modified Proctor energy56,250 ft-lb/ft3 (ASTM D1557 / AASHTO T 180)WAQTC FOP T 99/T 180, Table 2
Nuclear gauge depth, direct transmissionUp to 12 inASTM D6938-23, section 1.2
Sand cone limitNo appreciable rock over 1 1/2 in; hole up to 0.1 ft3ASTM D1556/D1556M-24, sections 1.2 and 1.5
Structural fill target90% cohesive, 95% cohesionlessUFGS 31 00 00, 3.6.2
Fill 12 in or less under footings, no geotechnical reportAt least 90% of ASTM D1557IBC Section 1804.6 exception
Texas embankment, PI 15 or lessAt least 98% of Tex-114-E maximumTxDOT Item 132, Table 2

Standard or modified Proctor: which lab test does your spec call for?

Your specification names one of two lab tests, and the choice changes the target. ASTM D698 (standard Proctor) drops a 5.5 lb rammer 12 in onto 3 layers; ASTM D1557 (modified Proctor) drops a 10 lb rammer 18 in onto 5 layers. The modified test packs in about 4.5 times the energy, so 95 percent of a D1557 maximum is a denser, harder target than 95 percent of a D698 maximum.

The UFGS 31 00 00 designer note says to use ASTM D698 “for most projects” and ASTM D1557 “for roads, airfields, and other heavily loaded areas,” and to name one method per contract where possible (UFGS 31 00 00, paragraph 3.6.6 note). The ASTM D698 and ASTM D1557 titles round the energies to 12,400 and 56,000 ft-lb/ft3.

SettingStandard (ASTM D698 / AASHTO T 99)Modified (ASTM D1557 / AASHTO T 180)Source
Rammer mass5.5 lb10 lbWAQTC FOP T 99/T 180
Drop height12 in18 inWAQTC FOP T 99/T 180
Layers35WAQTC FOP T 99/T 180
Blows per layer25 (4 in mold), 56 (6 in mold)25 (4 in mold), 56 (6 in mold)WAQTC FOP T 99/T 180
4 in mold volume0.0333 ft30.0333 ft3WAQTC FOP T 99/T 180
Energy12,375 ft-lb/ft356,250 ft-lb/ft3WAQTC FOP T 99/T 180
Typical use in UFGSMost building and site workRoads, airfields, heavy loadsUFGS 31 00 00 note
Oversize limit30% or less retained on the 3/4 in sieve (Methods C, D)SameWAQTC FOP T 99/T 180

The lab runs at least 3 points on the dry side of optimum and 2 on the wet side, adding 1 to 2 percentage points of water per point, per the WAQTC field procedure adopted by WSDOT. The peak of the curve gives the two numbers every field test depends on. In the published example below, the peak sits at 117.3 lb/ft3 and 13.2 percent moisture.

PointMoisture contentDry densitySource
111.3%114.3 lb/ft3WAQTC FOP T 99/T 180 example
212.1%115.7 lb/ft3WAQTC FOP T 99/T 180 example
312.8%116.9 lb/ft3WAQTC FOP T 99/T 180 example
413.6%116.7 lb/ft3WAQTC FOP T 99/T 180 example
514.2%115.9 lb/ft3WAQTC FOP T 99/T 180 example
Curve peak (sketched)13.2% optimum117.3 lb/ft3 maximumWAQTC FOP T 99/T 180 example
A published Proctor curve: dry density vs moistureLine chart: dry density rises from 114.3 lb/ft3 at 11.3% moisture to 116.9 at 12.8%, then falls to 115.9 at 14.2%.108110112115118120122lb/ft3 dry density11.3%12.1%12.8%13.6%14.2%
The example soil peaks at a maximum dry density of 117.3 lb/ft3 at 13.2 percent optimum moisture; wetter or drier fill compacts less densely. Source: WAQTC FOP for AASHTO T 99/T 180, WSDOT Materials Manual, January 2026, accessed November 15, 2026.

How is field density measured: nuclear gauge or sand cone?

Most commercial sites use a nuclear density gauge under ASTM D6938, because one test takes two 1 minute readings and gives density and moisture on the spot. The sand cone under ASTM D1556 digs a small hole, fills it with calibrated sand to get its volume, and needs a separate moisture result. UFGS 31 00 00 uses the sand cone to check the gauge: one check per lift for every 6 or 10 gauge tests.

FeatureNuclear gauge (ASTM D6938)Sand cone (ASTM D1556)Source
How it reads densityGamma radiation, source rod up to 12 in deep (direct transmission)Weighs soil dug from a hole, sand measures the hole volumeASTM D6938-23; ASTM D1556-24
MoistureNeutron reading at surface; accept if within 1 point of oven drySeparate oven test (ASTM D2216)WAQTC FOP T 310; UFGS 31 00 00
ReadingTwo 1 minute readings within 2.0 lb/ft3 (one direction) or 3.0 lb/ft3 (two directions)One hole per testWAQTC FOP T 310
Daily setup10 to 20 minute warm-up, standard count each day, calibration every 12 monthsCalibrated sand and coneWAQTC FOP T 310
Site limits30 ft from other radioactive sources, 10 ft from large objects, trench correction within 24 in of a wallNot for organic, saturated or highly plastic soils, or loose granular soils that caveWAQTC FOP T 310; ASTM D1556-24, 1.4
Role on a UFGS jobProduction testingCalibration check, 1 per 6 or 10 gauge tests per liftUFGS 31 00 00 Table 1

The gauge holds radioactive sources, so the operator carries the licensing and transport papers the T 310 procedure lists in its equipment section. Ask the testing agency for the gauge’s last calibration date; T 310 calls for verifying calibration every 12 months. Where the gauge and the oven disagree on moisture by more than 1 point, the oven value controls.

How do you calculate percent compaction?

Percent compaction is the field dry density divided by the lab maximum dry density, times 100. The gauge reads wet density, so dry density is wet density divided by 1 plus the moisture content as a decimal. The worked example below is the one published in the WAQTC FOP for AASHTO T 310, including its moisture check, which threw out the gauge moisture.

StepInput or formulaResultSource
1. Wet density, two readings121.6 and 123.4 lb/ft3Average 122.5 lb/ft3WAQTC FOP T 310 example
2. Gauge moisture14.2% and 15.4%Average 14.8%WAQTC FOP T 310 example
3. Oven moisture check15.9% (AASHTO T 255/T 265)Differs by more than 1 point, so use 15.9%WAQTC FOP T 310 example
4. Dry density122.5 / (1 + 0.159)105.7 lb/ft3WAQTC FOP T 310 example
5. Percent compaction105.7 / 111.3 x 10095%WAQTC FOP T 310 example

Run the same arithmetic backwards to find the field number a lift must hit. Against the 117.3 lb/ft3 maximum from the Proctor example above, the pass line is 105.6 lb/ft3 at 90 percent, 111.4 lb/ft3 at 95 percent and 115.0 lb/ft3 at 98 percent. A plus or minus 2 point moisture window around the 13.2 percent optimum, a bracketed option in UFGS 31 00 00, means 11.2 to 15.2 percent.

What compaction percentage is required for a building pad, slab, pavement and trench?

The project specification and geotechnical report set the numbers, but the federal guide spec shows the usual pattern: 95 percent for fill that carries a building or pavement, 90 percent for cohesive structural fill, and 85 to 90 percent for lawns and open areas. The geotechnical report can raise or lower these, which is why our geotechnical report guide tells owners to find the fill section first.

AreaRequirementLift and moistureSource
Structural fill under and next to structures90% of lab max (cohesive), 95% (cohesionless)8 in loose; 4 in with hand equipment; optional plus or minus 2 points of optimumUFGS 31 00 00, 3.6.2
Building footprint over-excavation (option)Scarify 6 to 8 in, compact to 95%Footprint plus 5 ft beyondUFGS 31 00 00, 3.4.5
Within 5 ft of structures95% of D698 or D1557As structural fillUFGS 31 00 00, 3.6.6.2
Pavement subgrade, top 12 in95% of D698 or D1557Surface within 0.05 ft under a 12 ft straightedgeUFGS 31 00 00, 3.5.4
Utility bedding to top of pipe95% of D698 or 85% of D1557Tamped to 1 ft above pipeUFGS 31 00 00, 3.6.1.3
Trench final backfill under buildings or pavementSame as structural fillNo flooding or jettingUFGS 31 00 00, 3.6.1.4.1
Trench backfill in turf and other areas85% cohesive, 90% cohesionless12 in looseUFGS 31 00 00, 3.6.1.4.2
General site, landscaped areas85% or 90%Designer picksUFGS 31 00 00, 3.6.6.1
Fill 12 in or less under shallow footings, no reportAt least 90% of ASTM D1557, special inspectionNot statedIBC 2024, 1804.6 exception
Texas embankment, PI 15 or less98% of Tex-114-E maximum16 in loose or 12 in compactedTxDOT Item 132, Table 2
Texas embankment, PI over 3595% to 100%, moisture at or above optimum16 in loose or 12 in compactedTxDOT Item 132, Table 2
Minimum compaction by areaBar chart: minimum compaction ranges from 98% for Texas low-PI embankment to 85% for cohesive trench backfill in turf.% of lab maximumTexas embankment, PI 15 or less (TxDOT Ite98.0Pavement subgrade, top 12 in (UFGS)95.0Fill within 5 ft of structures (UFGS)95.0Structural fill, cohesionless (UFGS)95.0Structural fill, cohesive (UFGS)90.0Footing fill 12 in or less, no report (IBC90.0Trench backfill in turf, cohesionless (UFG90.0Trench backfill in turf, cohesive (UFGS)85.0
Fill that carries a building or pavement is usually held to 95 percent; open-area trench backfill drops to 85 or 90 percent. Sources: UFGS 31 00 00 (August 2023), IBC 2024 Section 1804.6, TxDOT Item 132 (2024), accessed November 15, 2026.

Texas Department of Transportation Item 132 (2024) shows why high-plasticity clay gets an upper limit too: for soils with a plasticity index (PI) over 35 it caps density at 100 percent and requires moisture at or above optimum, which limits swell (TxDOT 2024 Standard Specifications, Item 132). Under the slab itself, a vapor retarder and base course sit on this subgrade, and our concrete slab cost guide prices that whole section.

How often is compaction tested?

Every lift is tested before the next lift goes on, and the count per lift comes from area. UFGS 31 00 00 Table 1 defaults to one density test per 2,000 sq ft of each lift compacted by rollers, doubled for hand-tamped areas, two moisture tests per day per fill type, and one Proctor per 500 cubic yards or whenever the material changes. Its designer note gives a range of one test per 100 sq ft for small areas up to one per 10,000 sq ft.

Material or areaTest frequencySource
Fill and backfill, roller compacted1 density test per 2,000 sq ft per lift (bracketed default)UFGS 31 00 00 Table 1
Fill and backfill, hand-operated compactorsDouble the rate aboveUFGS 31 00 00 Table 1
Nuclear gauge check by sand cone1 per lift for every 6 or 10 gauge testsUFGS 31 00 00 Table 1
Moisture content (ASTM D2216)2 tests per day per fill typeUFGS 31 00 00 Table 1
Proctor (D698 or D1557)1 per 500 cu yd, or on any material changeUFGS 31 00 00 Table 1
Fill next to structures1 per structure per 2,000 sq ft, 1 ft below finished gradeUFGS 31 00 00 designer note
Site subgrades (not airfields)1 per 2,500 sq ftUFGS 31 00 00 designer note
Embankment or borrow1 per lift per 500 cu yd placedUFGS 31 00 00 designer note
Undisturbed native soil under structures2 random tests in footings, 2 on subgrade in the building lineUFGS 31 00 00 designer note
Test reportsWithin 24 hours or 7 days (designer picks)UFGS 31 00 00, 3.11
Lift and test sequence for structural fill under a building pad, per UFGS 31 00 00 Place, compact, test, then the next lift (UFGS 31 00 00, August 2023) Building slab (placed after the last lift passes) Lift 3: max 8 in loose (4 in with hand tampers) Lift 2: max 8 in loose, tested before lift 3 Lift 1: max 8 in loose, tested before lift 2 Prepared subgrade, inspected before fill Each lift, before the next 1 density test per 2,000 sq ft (guide default, roller areas) Double that for hand-tamped areas Sand cone check: 1 per 6 or 10 nuclear gauge tests, per lift Moisture: 2 tests per day per fill type Target density Cohesive fill: 90% of lab max Cohesionless: 95% of lab max Within 5 ft of structures: 95% Moisture window Plus or minus 2 percentage points of optimum moisture (bracketed guide option) Lab Proctor 1 per 500 cu yd of fill, or whenever the material changes
UFGS 31 00 00 places fill in loose lifts of 8 in or less (4 in with hand tampers) and tests each lift, one test per 2,000 sq ft by default, before the next goes on. Source: UFGS 31 00 00, August 2023, accessed November 15, 2026.

Worked count for a 20,000 sq ft building pad with 18 in of compacted fill in 3 lifts: 20,000 / 2,000 = 10 gauge tests per lift, or 30 in total. At one sand cone check per 10 gauge tests, that adds 1 per lift, 3 in total. The fill volume is 20,000 x 1.5 = 30,000 cu ft, or 1,111 cu yd, so 3 Proctors at one per 500 cu yd. The earthwork crew should plan around the wait for each lift’s results before placing the next one, which our construction schedule guide treats as a hold point.

What happens when a compaction test fails?

A failed test stops that lift. The tester checks moisture and the Proctor curve first, extra tests map the low area, the contractor reworks it, and the same lift is retested until it passes. TxDOT Item 132 lets the engineer “perform additional testing to determine the extent of the area to correct” and allows no more than 1 of the 5 most recent tests outside limits, none by more than 3 lb/ft3.

  1. Confirm the reading: check field moisture against optimum and confirm the test used the right Proctor curve for that soil. A material change calls for a new Proctor under UFGS 31 00 00 Table 1.
  2. Map the failure: run extra tests around the spot to find the extent of the area to correct (TxDOT Item 132, section 3.4.2).
  3. Fix the cause. Too dry: scarify, add water, mix and recompact. Too wet: plow or disk and aerate the lift to dry it (UFGS 31 00 00, 3.7.1), or replace it with satisfactory fill; TxDOT Item 132 has soft spots corrected “as directed.” Moisture in range but density low: more passes, a thinner lift or heavier equipment, since TxDOT sets lift thickness by “the ability of the compacting operation and equipment to meet the required density.”
  4. Retest the same lift. UFGS 31 00 00 paragraph 3.6 says to “compact and test each lift before placing overlaying lift.”
  5. File the passing report. The special inspector’s final report lists the result for each lift under IBC Section 1704.2.4.
What happens after a failed compaction test A failed compaction test: the usual path to a passing lift Test reads below the specified percent 1. Check the field moisture against optimum and that the right Proctor curve was used 2. Extra tests around the spot to find the extent of the area to correct Too dry Scarify, add water, mix and recompact Too wet or pumping Disk and aerate to dry, or remove and replace the soil Moisture fine, low density More passes, thinner lift or heavier compactor 3. Retest the same lift; no new lift until it passes Passing report goes to the inspector
After a failed test the lift is checked, mapped with extra tests, reworked for moisture or effort, and retested before the next lift. Sources: TxDOT Item 132 (2024); UFGS 31 00 00 (August 2023), accessed November 15, 2026.

Who pays for the retest is a contract term, not a code rule. TxDOT Item 132 makes the contractor replace and recompact test holes “at no additional expense to the Department.” Write the retest charge into the bid form and the testing agreement, and check it when you compare construction bids, so a run of failures does not become a change order.

How much does compaction testing cost?

Public rate sheets price a Proctor at $140 to $288 each, a field density test at $28 to $34, and a soils technician at $55 to $129 an hour. A full earthwork testing budget for one Texas public building was $27,436.20 in 2022, most of it technician time. Prices below are the agencies’ own schedules, in the year shown, not escalated.

ItemRateAgency, place, dateSource
Proctor, standard or modified$140 eachUtah DFCM, state capital projects, July 2026Utah DFCM rate sheet
In-place density, soils technician$55 per hourUtah DFCM, July 2026Utah DFCM rate sheet
Maximum density, ASTM D1557 or D698$190 eachLa Habra, CA on-call agreement, 2022 to 2023 scheduleLa Habra amendment, May 2026
Proctor check point$65 eachLa Habra, CA, 2022 to 2023 scheduleLa Habra amendment
Soils technician$129 per hourLa Habra, CA, 2022 to 2023 scheduleLa Habra amendment
Nuclear gauge$11 per hourLa Habra, CA, 2022 to 2023 scheduleLa Habra amendment
Sand cone equipment$55 per dayLa Habra, CA, 2022 to 2023 scheduleLa Habra amendment
Moisture-density curve (California Test 216)$288 eachHumboldt County, CA schedule, effective February 16, 2026county materials testing schedule
Nuclear density$29 per hole ($34 in 2025)Humboldt County, CA, February 2026County materials testing schedule
Proctor$225 eachCity of Hidalgo, TX, March 2022Hidalgo Exhibit D
Field density test$28 eachCity of Hidalgo, TX, March 2022Hidalgo Exhibit D
Compaction testing, fire station100 hours at $98 = $9,800City of Calexico, CA, 2020Calexico staff report
Price of one lab Proctor (moisture-density) test on public rate sheetsBar chart: one Proctor test costs $288 in Humboldt County, $225 in Hidalgo, $190 in La Habra and $140 in Utah.$ per testHumboldt County, CA, California Test 216 c288City of Hidalgo, TX, 2022225La Habra, CA, D1557 or D698, 2022 to 2023 190Utah DFCM, standard or modified, 2026140
One lab Proctor test ranges from $140 (Utah DFCM, July 2026) to $288 (Humboldt County, California, February 2026) on four public schedules. Sources: agency rate sheets as listed, accessed November 15, 2026.

The best public picture of a whole job is the earthwork section of the City of Hidalgo, Texas testing budget for its Bio Safety Lab, an exhibit to the March 22, 2022 council agenda. It shows that the $28 test fee is the small part: technician time at $85.45 an hour made the density work about $97.95 per test all in.

LineQuantity x rateAmountSource
Proctor3 x $225$675.00Hidalgo Exhibit D
Atterberg limits and two sieve analyses3 x $135, 3 x $60, 2 x $90$765.00Hidalgo Exhibit D
Field density tests (utilities, pad, pavement, building pad)215 x $28$6,020.00Hidalgo Exhibit D
Technician time, sampling and density testing182 h x $85.45$15,551.90Hidalgo Exhibit D
Proof rolling observation4 h x $85.45$341.80Hidalgo Exhibit D
Vehicle travel7,100 mi x $0.575$4,082.50Hidalgo Exhibit D
Earthwork subtotal$27,436.20Hidalgo Exhibit D
Density work per test, CB&C arithmetic($6,020 + 176 h x $85.45) / 215$97.95Derived

Three things move the bill most: how many trips the technician makes (each lift is a trip, and the Calexico agreement set a 2 hour minimum per call), the travel line (15 percent of the Hidalgo earthwork total), and failures, because every retest is another trip. Utah DFCM bills overtime at 1.5 times the hourly rate after 8 hours and on weekends. Clearing and grading before the fill goes in is a separate cost covered in our land clearing cost guide.

Which compaction test plan fits your site?

Match the plan to the soil and the load. Granular fill with little rock suits the nuclear gauge with sand cone checks; rocky fill over 30 percent retained on the 3/4 in sieve needs an oversize correction or a test strip; a thin pad without a geotechnical report must reach 90 percent of D1557 under IBC 1804.6. The table gives the threshold and the action for each case.

IfThenSource
Building or site fill, normal loadsSpecify ASTM D698, 90% cohesive or 95% cohesionless, 95% within 5 ft of structuresUFGS 31 00 00
Pavement, truck court or heavy loadsSpecify ASTM D1557; 95% in the top 12 in of subgradeUFGS 31 00 00
Fill has more than 30% retained on the 3/4 in sieveOversize correction (AASHTO T 180 Annex A) or a test sectionUFGS 31 00 00, 1.2.16 note
Clean sand or gravel, under 5% passing the No. 200 sieveRelative density (ASTM D4253/D4254) instead of ProctorUFGS 31 00 00, 1.2.17
Rock over 1 1/2 in in the fillNot a sand cone job; use the gauge or larger-hole methods (D4914, D5030)ASTM D1556-24, 1.5
Testing in a trench, within 24 in of the wallGauge needs a trench offset correctionWAQTC FOP T 310
Fill 12 in or less under shallow footings and no geotechnical report90% of D1557, verified by special inspectionIBC 1804.6
Fill over 12 in under shallow footingsGeotechnical investigation sets the fill specIBC 1804.6
High-plasticity clay (PI over 35, Texas)95% to 100% with moisture at or above optimumTxDOT Item 132

For concrete placed on that pad, the field tests change but the logic stays the same, as our concrete slump test guide shows for fresh concrete.

Compaction results feed the footing design based on soil bearing capacity and sit alongside the special inspections program.

How we compiled this

We read 9 primary documents in November 2026: UFGS 31 00 00 (August 2023), the WAQTC field procedures for AASHTO T 99/T 180 and T 310 in the WSDOT Materials Manual (January 2026), TxDOT Item 132 (2024), the ASTM D698, D1557, D1556 and D6938 scope pages, and IBC 2024 Chapters 17 and 18. Prices come from five public agency rate sheets and agreements dated 2020 to 2026, shown in their own year. We did not run tests or collect field data.

Frequently asked questions

What is a passing compaction test result?

A passing result meets the percentage in your project specification, usually 90 to 95 percent of the lab maximum dry density. UFGS 31 00 00 (August 2023) sets 90 percent for cohesive structural fill, 95 percent for cohesionless fill and 95 percent for the top 12 inches of pavement subgrade. Some specs also require moisture within 2 points of optimum, so a dense but dry lift can still fail.

Is 95 percent modified Proctor harder to reach than 95 percent standard?

Yes. The modified Proctor (ASTM D1557) compacts the lab sample with 56,250 ft-lb/ft3 of energy against 12,375 for the standard test (ASTM D698), per the WAQTC procedure in the WSDOT Materials Manual (January 2026). The higher-energy test gives a higher maximum dry density, so 95 percent of it demands a denser lift. Check which one your spec names before pricing compaction.

How long does a nuclear gauge compaction test take?

The reading itself is short: the WAQTC procedure for AASHTO T 310 takes two 1 minute readings per test after a 10 to 20 minute warm-up at the start of the day. Site prep, drilling the source rod hole and recording add a few minutes. The Proctor curve the result depends on is a lab test that needs several moisture points, so order it before fill placement starts.

Who pays for compaction testing on a commercial job?

Under IBC Section 1704.2 the owner, or a registered design professional acting for the owner, employs the special inspection agency, not the contractor. Retests after failures are a contract term: TxDOT Item 132 makes the contractor replace and recompact test holes at no cost to the agency. This is general information, not legal advice; put the retest charge in your contract.

Can soil that is too wet pass a compaction test?

Usually not. Past optimum moisture, dry density falls: in the WAQTC example the curve peaks at 117.3 lb/ft3 at 13.2 percent and drops to 115.9 lb/ft3 at 14.2 percent. UFGS 31 00 00 (paragraph 3.7.1) calls for breaking up and aerating wet fill until it reaches the moisture that allows the specified compaction. A soil can also read dense but pump under a proof roll, which TxDOT Item 132 treats as a soft spot to correct.

How accurate is a nuclear density gauge?

The gauge must repeat itself: two readings within 2.0 lb/ft3 in one direction, or 3.0 lb/ft3 in two directions, under the WAQTC T 310 procedure. Its moisture reading is accepted only if it falls within 1 point of an oven test. UFGS 31 00 00 adds a sand cone check (ASTM D1556) for every 6 or 10 gauge tests per lift, and T 310 requires calibration verification every 12 months.

Sources

Last reviewed November 2026 by the CB&C Editorial Team. See our editorial standards.