Commercial Construction Blog
Practical guides for project owners, plus industry news, jobsite culture, safety and careers for the people who build.
Browse by topic: Owner guides · Industry and culture · Florida construction · Research · All guides
-

TPO Roofing Cost: What Public Bids, Spec Sheets and Codes Show
TPO roofing cost on five April 2026 public re-roof bids in Columbus, Georgia ran $11.76 to $18.93 per sq ft; insulation and cover board made up 61.8% of…
-

Commercial Painting: Costs From Public Bids, Specs and How to Compare Quotes
Commercial painting ran $0.50 to $3.80 per square foot in a 2024 county unit-price bid (median $1.11) and $2.13 to $2.45 on competed federal awards.
-

Fire Sprinkler System Cost: New Build, Retrofit and Water Supply
Commercial sprinkler work ran a median $7.74 per sq ft in 2024 to 2025 Massachusetts school estimates before markups, with Texas retrofits at $5.66 to $44.91.
-

Commercial Plumbing Contractor: Licenses, Hourly Rates and How to Hire One
A commercial plumbing contractor needs a license class with no house-only limit; 2025 and 2026 public bids price a master plumber at $75 to $149 an hour.
-

AIA A101: How to Fill In the 2017 Stipulated Sum Agreement
AIA A101-2017 blank by blank: what to write in each fill point, what the form prints if you leave it empty, Exhibit A limits and the $179.99 price.
-

Concrete Slab Cost Per Square Foot: Commercial Prices From Public Bids
Commercial slab-on-grade concrete bid at $9.07 to $14.20 per sq ft in South Dakota DOT’s 2024 averages, about $10 to $16 escalated to 2026.
-

Commercial Construction Loan: How Owners Size the Loan, Equity, Draws and SBA Options
A commercial construction loan is capped near 80% of appraised value under 12 CFR 365; a worked $5.7 million budget compares bank, SBA 504 and 7(a).
-

Geotechnical Report: What It Contains, When the IBC Requires One, and What It Costs
A geotechnical report records borings, lab tests and groundwater and sets the bearing pressure for footings; the 2024 IBC requires one at permit application unless waived, and public…
-

General Conditions in Construction: The Contract Document and the Cost Line
General conditions are both the contract’s standard terms and the builder’s site overhead, which ran 5.18% to 7.16% of three county GMPs from 2017 to 2026.
-

Grease Trap and Grease Interceptor Guide: Sizing, Pumping and Cost
A grease trap or interceptor sized under seven utility rules, with the 25% pumping rule and installed and pumping costs from public records.