Rebar Sizes: #3 to #18 Chart, Grades, Cover Rules and Prices

Tied rebar grid on concrete blocks inside formwork for a commercial slab

US rebar sizes run from #3 to #18, and through #8 the number is the bar diameter in eighths of an inch: a #4 bar is 0.500 in across, 0.20 sq in in area and weighs 0.668 lb per ft.

Key takeaways

  • Eleven standard US bar sizes run from #3 (0.375 in, 0.376 lb/ft) to #18 (2.257 in, 13.600 lb/ft), per Caltrans Bridge Design Details Table 13.1.1 (September 2025).
  • ASTM A615/A615M-25 covers Grades 40, 60, 80 and 100; Grade 75 left the main body of A615 in 2018, and CRSI tells designers to substitute Grade 80.
  • Bars cast against and permanently in contact with soil need 3 in of concrete cover under ACI 318-19 Table 20.5.1.3.1, a rule ACI says dates to the 1920 building code.
  • A Class B tension lap for a Grade 60 #4 bottom bar in 4,000 psi concrete works out to 25 in under ACI 318-19, not the 20 in that the “40 bar diameters” shortcut gives.
  • State DOTs paid $1.53 to $1.79 per lb for black bar in place in 2025 (WisDOT, TDOT), and the BLS index for fabricated rebar rose 30.0% from September 2025 to September 2026.

What are the standard US rebar sizes?

The standard US rebar sizes are #3, #4, #5, #6, #7, #8, #9, #10, #11, #14 and #18, defined in ASTM A615 (carbon steel) and ASTM A706 (low-alloy, weldable). Through #8 the size number is the nominal diameter in eighths of an inch. The table below gives diameter, area and weight from Caltrans Bridge Design Details, Table 13.1.1 (September 2025), which reproduces the ASTM nominal values.

Bar sizeNominal diameter (in)Diameter over deformations (in)Area (sq in)Weight (lb/ft)Weight of a 20 ft bar (lb)Feet per ton
#30.3750.440.110.3767.525,319
#40.5000.560.200.66813.362,994
#50.6250.690.311.04320.861,918
#60.7500.880.441.50230.041,332
#70.8751.000.602.04440.88978
#81.0001.130.792.67053.40749
#91.1281.251.003.40068.00588
#101.2701.441.274.30386.06465
#111.4101.631.565.313106.26376
#141.6931.882.257.650153.00261
#182.2572.504.0013.600272.00147

Use the nominal diameter for design and the larger diameter over the deformations (the ribs) for clearances, as Caltrans Table 13.1.1 notes: a #8 bar is 1.000 in nominal but 1.13 in over the ribs. Weight per foot drives the price, because rebar is bid and paid by the pound; a #6 bar (1.502 lb/ft) weighs 2.25 times a #4 bar (0.668 lb/ft). The last two columns are CB&C arithmetic from the Caltrans weights.

Caltrans Table 13.1.1 with the #4 row boxed: 0.500 in diameter, 0.56 in over ribs, 0.20 sq in, 0.668 lb per ft
Caltrans Bridge Design Details Table 13.1.1 (September 2025) lists ASTM bar data for #3 to #18; the boxed #4 row shows 0.500 in, 0.20 sq in and 0.668 lb per ft. Accessed November 8, 2026.

Above #8 the eighths rule stops being exact: a #9 bar is 1.128 in, not 1.125 in, and a #18 is 2.257 in. ASTM A615/A615M-25 also lists a No. 20 [64] bar, but its scope note warns that design codes may not recognize it and that its use may need building official approval, so most charts stop at #18.

Scale drawing of rebar cross sections from #3 at 0.375 in to #18 at 2.257 in, with weight per foot under each US rebar sizes #3 to #18 drawn to scale (nominal diameter) Bar number = diameter in eighths of an inch for #3 to #8; #9 and larger are slightly off that rule #3 0.375 in 0.376 #4 0.500 in 0.668 #5 0.625 in 1.043 #6 0.750 in 1.502 #7 0.875 in 2.044 #8 1.000 in 2.670 #9 1.128 in 3.400 #10 1.270 in 4.303 #11 1.410 in 5.313 #14 1.693 in 7.650 #18 2.257 in 13.600 Teal row = weight in lb per ft. Values: Caltrans Bridge Design Details Table 13.1.1 (Sept 2025)
Rebar sizes #3 to #18 drawn to scale by nominal diameter, with weight per foot. Values from Caltrans Bridge Design Details Table 13.1.1, September 2025, accessed November 8, 2026.

How do metric rebar sizes convert to US bar numbers?

Metric rebar sizes in the US are soft conversions: the same physical bar carries a millimeter name, so a #13 bar is a #4 and a #16 bar is a #5. The metric number is the nominal diameter rounded to the nearest millimeter. The New York State DOT approved list for reinforcing steel (revised September 18, 2026) maps all eleven sizes, from #10 (#3) to #57 (#18).

US bar sizeSoft metric sizeDiameter (mm)Area (sq mm)Mass (kg/m)
#3#109.5710.560
#4#1312.71290.994
#5#1615.92001.552
#6#1919.12842.235
#7#2222.23873.042
#8#2525.45103.973
#9#2928.76455.060
#10#3232.38196.404
#11#3635.81,0067.907
#14#4343.01,45211.384
#18#5757.32,58120.239

Designations and diameters come from the NYSDOT list; area and mass are CB&C conversions of the Caltrans inch-pound values at 645.16 sq mm per sq in and 1.48816 kg/m per lb/ft. A #10 callout is the trap: on a metric drawing it means a 9.5 mm bar (US #3), while on an inch-pound drawing it means a 1.270 in bar. Check the unit system in the general notes before pricing a bar list.

What do rebar grades 40, 60, 80 and 100 mean?

The grade is the minimum yield strength in thousands of psi: Grade 60 bars yield at 60,000 psi or more. ASTM A615/A615M-25 lists Grades 40, 60, 80 and 100, and ASTM A706/A706M-24 lists Grades 60, 80 and 100 with limits on chemistry for welding. Grade 60 is the default on most commercial drawings; higher grades cut bar count where the engineer allows them.

Grade (metric)Min. yieldStandardsWhat to checkSource
40 [280]40,000 psiA615Lowest grade still in A615ASTM A615-25 scope 1.2
60 [420]60,000 psiA615, A706Default grade on most structural drawings; tensile to yield ratio 1.25 to 1.50 for grades below 100ASTM A615-25 scope, Note 1
75 [520]75,000 psiA615 Annex A2 onlyRemoved from the main body of A615 in 2018; substitute Grade 80CRSI announcement, Oct 1, 2018
80 [550]80,000 psiA615, A706Longer laps: ACI 318-19 multiplies development length by 1.15ACI 318-19 Table 25.4.2.5
100 [690]100,000 psiA615, A706Tensile to yield ratio only 1.15 in A615; mechanical and welded splices need 115,000 psi tensileASTM A615-25 Note 1

Each bar is rolled with marks in a set order, per CRSI’s bar identification guide: a letter or symbol for the mill, the bar size, a type letter (“S” for A615 carbon steel, “W” for A706 low-alloy steel) and a grade mark. Grade 60 shows “60” or one longitudinal line; Grade 80 shows “80” or three lines. CRSI notes that every grade has the same modulus of elasticity, 29,000,000 psi, so higher grades add strength, not stiffness.

Which rebar sizes go in slabs, footings, walls and columns?

No code assigns one bar size to a member type; the engineer of record picks size and spacing to meet the minimum steel ratios, spacing caps and detailing rules in ACI 318-19, the concrete code the IBC adopts by reference. The table lists the rules that decide which bar sizes are workable in each commercial element, with the ACI section to quote in a submittal review or RFI.

ElementACI 318-19 ruleEffect on bar sizeSection
Slab on groundOutside the code’s scope unless the slab carries vertical loads or lateral forces from the structureBar size comes from the engineer’s slab design, not an ACI tableChapter 1 scope
Structural slab, shrinkage and temperature steelAt least 0.0018 times the gross concrete area (Grade 60 and up); spacing no more than 5h or 18 in#4 at 18 in meets a 6 in slab; see the next table24.4.3.2, 24.4.3.3
One-way slab, flexural steelSpacing no more than 3h or 18 inA thin slab forces smaller bars at closer spacing7.7.2.3
Footing3 in cover where cast against soil; at least 6 in of footing depth above the bottom steelBottom mat sits 3 in up on chairs or bricks20.5.1.3.1, 13.3.1.2
Wall, low in-plane shearVertical steel ratio 0.0012 and horizontal 0.0020 for #5 and smaller (0.0015 and 0.0025 for larger bars); spacing no more than 3h or 18 in#5 and smaller earn the lower ratio, so most walls use #4 or #511.6.1, 11.7.2.1
Wall over 10 in thickTwo curtains (layers) of steel, except basement walls and cantilevered retaining wallsBars split between two faces11.7.2.3
Tied columnVertical steel 1% to 8% of the gross area; at least 4 barsVertical bars are usually #6 and larger to fit the ratio10.6.1.1, 10.7.3.1
Column ties#3 ties for vertical bars #10 and smaller; #4 ties for #11, #14, #18 and bundles; spacing no more than 16 bar diameters, 48 tie diameters or the least column dimensionTie size follows the vertical bar size25.7.2.2, 25.7.2.1

For a structural slab or a mat, the 0.0018 ratio sets the lightest legal layout. The table below is CB&C arithmetic: required steel per foot of width equals 0.0018 times 12 in times the thickness, and the spacing is the bar area times 12 divided by that requirement, rounded down and capped at 18 in.

Slab thicknessRequired steel (sq in per ft)Max spacing, #3Max spacing, #4Max spacing, #5
5 in0.10812 in18 in18 in
6 in0.13010 in18 in18 in
8 in0.1737 in13 in18 in
10 in0.2166 in11 in17 in
12 in0.2595 in9 in14 in

Thicker slabs and mats on poor soil carry far more than this minimum, and the soil bearing value in the geotechnical report for the site sets footing size before any bar is drawn. Bar schedules come from the structural engineer; a structural engineer’s fee on a small commercial job is usually a smaller line than the steel it saves.

How much concrete cover and spacing does rebar need?

ACI 318-19 Table 20.5.1.3.1 sets minimum cover for cast-in-place concrete: 3 in where concrete is cast against and permanently in contact with soil, 2 in for #6 to #18 bars exposed to weather or soil, 1.5 in for #5 and smaller in that exposure, 3/4 in for #11 and smaller in interior slabs and walls, and 1.5 in in interior beams and columns.

Dimensioned sections showing 3 in, 2 in, 3/4 in and 1.5 in minimum concrete cover over rebar by exposure Minimum concrete cover over rebar, ACI 318-19 Table 20.5.1.3.1 Cast-in-place, nonprestressed concrete; measured from the concrete face to the outermost bar Cast against and in contact with ground soil below 3 in 3 in Footings, grade beams All bar sizes Exposed to weather or ground (formed) 2 in 2 in Exterior walls, piers #6 to #18 (1.5 in for #5 and smaller) Not exposed: slabs, joists, walls 3/4 in 3/4 in Interior slabs and walls #11 and smaller (1.5 in for #14 and #18) Not exposed: beams, columns, pedestals 1.5 in 1.5 in Interior members Primary bars, ties, stirrups and spirals
Minimum cover over rebar for cast-in-place nonprestressed concrete, ACI 318-19 Table 20.5.1.3.1: 3 in against soil, 2 in exposed (#6 to #18), 3/4 in interior slabs and walls, 1.5 in beams and columns.
ConditionBar sizesMinimum coverSource
Cast against and permanently in contact with ground (footings, grade beams)All3 inACI 318-19 Table 20.5.1.3.1; ACI FAQ
Exposed to weather or in contact with ground, formed#6 to #182 inACI 318-19 Table 20.5.1.3.1
Exposed to weather or in contact with ground, formed#5 and smaller1.5 inACI 318-19 Table 20.5.1.3.1
Not exposed: slabs, joists, walls#14 and #181.5 inACI 318-19 Table 20.5.1.3.1
Not exposed: slabs, joists, walls#11 and smaller3/4 inACI 318-19 Table 20.5.1.3.1
Not exposed: beams, columns, pedestals, tension tiesPrimary bars, ties, stirrups, spirals1.5 inACI 318-19 Table 20.5.1.3.1
Cast-in-place deep foundation (drilled pier) without casingAll2.5 inIBC 2021 Table 1808.8.2, as adopted in Illinois
Cast-in-place deep foundation inside a steel pipe or permanent casingAll1 inIBC 2021 Table 1808.8.2, as adopted in Illinois

The deep foundation rows come from IBC Table 1808.8.2, which also sends shallow footings back to ACI 318 Section 20.5. ACI’s technical FAQ says the 3 in rule is mostly about constructability in footings, retaining walls, grade beams and uncased drilled shafts, and that epoxy coating does not reduce it unless the building official approves an equivalent under Section 1.10.

Minimum clear spacing between parallel bars in a layer is the greatest of 1 in, one bar diameter and 4/3 of the largest aggregate size (ACI 318-19 Section 25.2.1, carried into local codes such as New York City’s Building Code Section 1907.6). With 3/4 in aggregate that is 1 in for bars up to #8. Column vertical bars need the greatest of 1.5 in, 1.5 bar diameters and 4/3 of the aggregate (Section 25.2.3).

How long should a rebar lap splice be?

A lap splice length comes from the bar’s development length: ACI 318-19 Section 25.5.2 sets a Class B tension lap, the common case, at 1.3 times development length and never under 12 in. For Grade 60 uncoated bottom bars in 4,000 psi normalweight concrete with normal cover and spacing, that is 25 in for a #4, 31 in for a #5 and 62 in for a #8.

BarDevelopment length, bottom barClass B lap, bottom barClass B lap, top bar (x1.3)Class B lap, Grade 80 (x1.15)"40 bar diameters" shortcut
#315 in19 in25 in22 in15 in
#419 in25 in33 in29 in20 in
#524 in31 in41 in36 in25 in
#629 in37 in49 in43 in30 in
#742 in54 in71 in63 in35 in
#848 in62 in81 in71 in40 in
#954 in70 in91 in80 in46 in
#1061 in79 in102 in91 in51 in
#1167 in87 in114 in100 in57 in

The table is CB&C arithmetic from the simplified equation in ACI 318-19 Table 25.4.2.3: development length equals 60,000 psi divided by 25 times the square root of 4,000 psi, times the bar diameter, for #6 and smaller (37.9 diameters), and divided by 20 for #7 and larger (47.4 diameters). It assumes clear spacing and cover of at least one bar diameter with code-minimum ties or stirrups. Top bars have more than 12 in of fresh concrete placed below them, and ACI multiplies their length by 1.3.

A top-ranking chart, updated October 2026, says laps “must overlap by 40 bar diameters”, 20 in for a #4. Under the ACI 318-19 conditions above, the Class B lap is 49.3 diameters for #6 and smaller and 61.7 diameters for #7 and larger, so the shortcut is short by 5 in on a #4 and by 22 in on a #8. Lap splices are not allowed for #14 and #18 bars except in narrow cases (Section 25.5.1.1), so those sizes use mechanical couplers; CRSI adds that lap lengths always appear on the placing drawings and that tack welding crossing bars is linked to brittle failure. South Dakota DOT paid $62.98 per #4 mechanical splice and $76.35 per #6 splice in 2024 (SDDOT 2024 Bid Item Price Report).

How much does rebar cost per pound, per foot and per ton?

Public bid data put black (uncoated) rebar furnished and placed at $1.53 to $1.79 per lb in 2025, or $3,060 to $3,580 per ton, in Wisconsin and Tennessee DOT averages, and $3.08 per lb in South Dakota’s 2024 averages. Epoxy coating added little in Tennessee ($1.73), while stainless bar ran $4.87 to $5.20 per lb. All prices below are DOT pay items for bar in place, not mill or yard prices.

Pay itemPeriod and quantity$ per lb, in place$ per tonSource
WisDOT, bar steel reinforcement HS, structures (505.0400)FY2025$1.53$3,060Wisconsin DOT list dated Oct 21, 2025
TDOT, steel bar reinforcement, roadway (604-01.02)2025, 945,201 lb$1.62$3,240Tennessee DOT 2025 average unit prices
TDOT, steel bar reinforcement, box bridges (604-02.02)2025, 1,068,933 lb$1.72$3,440Tennessee DOT 2025 average unit prices
TDOT, epoxy coated reinforcing steel (604-02.03)2025, 4,215,085 lb$1.73$3,460Tennessee DOT 2025 average unit prices
TDOT, steel bar reinforcement, bridges (604-03.02)2025, 2,492,873 lb$1.79$3,580Tennessee DOT 2025 average unit prices
SDDOT, reinforcing steel (480E0100)2024, 2,015,088 lb, 45 items$3.08$6,160South Dakota DOT 2024 report
SDDOT, epoxy coated reinforcing steel (480E0200)2024, 699,453 lb$3.29$6,580South Dakota DOT 2024 report
WisDOT, HS stainless bar (505.0800.S)FY2025$4.87$9,740Wisconsin DOT list dated Oct 21, 2025
SDDOT, stainless reinforcing steel (480E0300)2024, 909,617 lb$5.20$10,400South Dakota DOT 2024 report
Rebar in place: public DOT average prices per poundBar chart: rebar in place from $1.53 per lb (WisDOT FY2025) to $3.08 (SDDOT 2024) for black bar and $5.20 for stainless.$ per lbWisDOT HS bar, FY20251.53TDOT roadway bar, 20251.62TDOT box bridge bar, 20251.72TDOT epoxy coated bar, 20251.73TDOT bridge bar, 20251.79SDDOT reinforcing steel, 20243.08SDDOT epoxy coated, 20243.29WisDOT stainless, FY20254.87SDDOT stainless, 20245.2
Black rebar in place averaged $1.53 to $1.79 per lb in 2025 DOT data and $3.08 in South Dakota’s 2024 data. Sources: WisDOT, TDOT and SDDOT reports, accessed November 8, 2026.

Per ton is the per-lb price times 2,000. Wisconsin’s list (FY2023 $1.29, FY2024 $1.36, FY2025 $1.53) and South Dakota’s group average ($1.48 in 2020 against $3.12 in 2024, a 110.5% rise on projects over 10,000 lb) show how fast bid prices moved. South Dakota’s $3.08 item average spans 45 bid items, about 44,780 lb per item on average, so it averages many highway projects of different sizes.

To price by the foot, multiply the per-lb price by the weight per foot. The table uses the low (WisDOT FY2025), middle (TDOT bridges 2025) and high (SDDOT 2024) public prices from the table above.

BarWeight (lb/ft)At $1.53/lbAt $1.79/lbAt $3.08/lb
#30.376$0.58$0.67$1.16
#40.668$1.02$1.20$2.06
#51.043$1.60$1.87$3.21
#61.502$2.30$2.69$4.63
#72.044$3.13$3.66$6.30
#82.670$4.09$4.78$8.22
#93.400$5.20$6.09$10.47
#104.303$6.58$7.70$13.25
#115.313$8.13$9.51$16.36
#147.650$11.70$13.69$23.56
#1813.600$20.81$24.34$41.89

These 2024 and 2025 bids predate a sharp 2026 run-up. The Bureau of Labor Statistics producer price index for fabricated structural bar joists and concrete reinforcing bars (series WPU1074051) stood at 313.812 in September 2025 and 408.026 in September 2026 (preliminary), up 30.0%, and 90.0% above its September 2019 level of 214.8. If a bid holds a 2025 rebar price in late 2026, ask the rebar subcontractor for a mill escalation clause or a price hold date.

BLS producer price index: fabricated bar joists and concrete reinforcing barsLine chart: the rebar price index went from 214.8 in September 2019 to 362.175 in 2022, 283.504 in 2024 and 408.026 in September 2026.200250300350400450index20192020202120222023202420252026
The BLS rebar index rose 30.0% from September 2025 (313.812) to September 2026 (408.026, preliminary). Source: BLS PPI WPU1074051, accessed November 8, 2026.

How do you estimate rebar quantity for a commercial slab?

Rebar quantity is bar count times bar length, plus laps, times weight per foot, plus waste. For a 5,000 sq ft, 6 in slab with #4 bars at 18 in each way, the arithmetic gives about 6,981 linear feet and 4,896 lb with 5% waste, or 0.98 lb per sq ft, priced at $7,491 to $15,081 in place using 2024 and 2025 DOT averages.

StepCalculationBasis
Slab plan100 ft by 50 ft = 5,000 sq ft, 6 in thickExample input
Bar and spacing#4 at 18 in on center, each way, one matExample input; checked against ACI 318-19 24.4.3
Edge clearanceBars stop 3 in from each slab edgeExample input
Bars running 100 ft(50 ft minus 0.5 ft) / 1.5 ft = 33 spaces, so 34 bars of 99.5 ftArithmetic
Bars running 50 ft(100 ft minus 0.5 ft) / 1.5 ft = 66.3, so 67 bars of 49.5 ftArithmetic
Lap splices40 ft stock bars (example input): 2 laps per long bar, 1 per short bar, 25 in (2.08 ft) eachClass B lap from the lap table
Linear feet34 x 103.67 ft + 67 x 51.58 ft = 6,981 lfArithmetic
Weight6,981 lf x 0.668 lb/ft = 4,663 lbCaltrans Table 13.1.1 weight
Waste and offcuts5% (example input): 4,663 x 1.05 = 4,896 lb, about 2.45 tons, or 0.98 lb per sq ftArithmetic
Ratio check#4 at 18 in = 0.20 x 12 / 18 = 0.133 sq in per ft, above 0.0018 x 6 x 12 = 0.130ACI 318-19 24.4.3.2
Price, in place4,896 lb x $1.53 to $3.08 per lb = $7,491 to $15,081WisDOT FY2025 and SDDOT 2024

The 0.98 lb per sq ft result sits close to the 1.0 lb per sq ft input used in our concrete slab cost per square foot worked example. Real bar lists add dowels, edge bars, trench and pit steel, and chairs; the construction cost estimating method is the same, but take the counts from the structural drawings and the rebar shop drawings in the submittal package.

Which size, grade or spec should you use?

Most size and grade choices on a commercial job are already fixed by the engineer’s general notes; the owner’s and builder’s decisions are about substitutions, splices, coatings and pricing. The table pairs each common situation with the rule that settles it and where that rule is written, so a question raised in an RFI can cite the source.

IfThenSource
Bars will be welded (embed plates, splices by welding)Specify ASTM A706, the low-alloy weldable bar, and weld under AWS D1.4ASTM A706-24 scope 1.5
Drawings call for A615 Grade 75Substitute Grade 80 with the engineer’s approvalCRSI, Oct 1, 2018
Engineer allows Grade 100 to reduce congestionCheck that couplers and welded splices reach 115,000 psi tensileASTM A615-25 Note 1
Bars #14 or #18 must be splicedUse mechanical couplers; lap splices are not permitted in most casesACI 318-19 25.5.1.1
A bid uses "40 bar diameters" for lapsAsk for the lap schedule; Class B laps run about 49 to 62 diameters at 4,000 psiACI 318-19 25.4.2.3, 25.5.2
Concrete is cast directly against soilHold 3 in of cover; size chairs and bricks to matchACI 318-19 Table 20.5.1.3.1
Drawing shows #13, #16 or #19Those are metric names for #4, #5 and #6NYSDOT approved list, Sept 2026
A 2025 rebar price appears in a late 2026 bidAsk for a price hold date or escalation clause; the BLS rebar index rose 30.0% in a yearBLS WPU1074051

Tilt-up panels, warehouse slabs and mat foundations carry heavier steel than a typical office slab, and their bar schedules are in the structural drawings for tilt-up construction and warehouse construction projects. Treat the tables on this page as a check on a bar list or bid, not a substitute for the engineer’s design; this is general information, not engineering advice for a specific project.

Bar choice goes with the concrete strength in our concrete psi guide, and loading waits on the strength gain in our concrete curing time guide.

For what a reinforced block wall costs once bars, grout and footing are added, see our breakdown of cinder block wall cost.

How we compiled this

We compiled this from 12 primary documents opened in November 2026: the Caltrans Bridge Design Details bar table, the NYSDOT approved list, ASTM’s published scopes for A615-25 and A706-24, three CRSI pages and a CRSI announcement, ACI’s technical FAQ, IBC Table 1808.8.2 as adopted in Illinois, and DOT bid price reports from Wisconsin, Tennessee and South Dakota, plus BLS series WPU1074051. ACI sells ACI 318-19, so the code rules are cited by section; we checked the 3 in cover against ACI’s FAQ and the clear-spacing rule against New York City’s adopted text. All quantities and lap lengths are CB&C arithmetic shown on the page.

Frequently asked questions

What size rebar is used in a commercial slab on grade?

There is no single code size; the engineer sets it. If the slab is designed to the ACI 318-19 minimum of 0.0018 times the gross area, a 6 in slab needs 0.130 sq in of steel per foot, which #4 bars at 18 in (0.133 sq in) meet. Industrial floors with rack posts or forklifts often carry more, so take size and spacing from the structural drawings.

What is the difference between #4 and #5 rebar?

A #4 bar is 0.500 in in diameter, 0.20 sq in in area and weighs 0.668 lb per ft; a #5 bar is 0.625 in, 0.31 sq in and 1.043 lb per ft (Caltrans Table 13.1.1, September 2025). The #5 carries 55% more steel area and costs about 56% more per foot, and its Class B lap at 4,000 psi is 31 in against 25 in.

How much does a 20 foot stick of #4 rebar weigh?

A 20 ft #4 bar weighs 13.36 lb, from 0.668 lb per ft in Caltrans Table 13.1.1. A 20 ft #5 weighs 20.86 lb and a 20 ft #8 weighs 53.40 lb. One ton of #4 bar is about 2,994 linear feet, which is the figure to use when a supplier quotes per ton and the takeoff is in feet.

What does #13 rebar mean?

A #13 bar is the soft metric name for a US #4 bar: 12.7 mm in diameter, the same physical bar. The metric number is the diameter rounded to the nearest millimeter, so #16 is a #5, #19 is a #6 and #57 is a #18, per the New York State DOT approved list for reinforcing steel revised September 18, 2026.

Is Grade 60 or Grade 80 rebar better?

Neither is better in general. Grade 80 yields at 80,000 psi against 60,000 psi, so the engineer can use fewer or smaller bars, but ACI 318-19 multiplies development and lap length by 1.15 for Grade 80. Both grades share the same 29,000,000 psi modulus (CRSI), so swapping grades never happens without the engineer of record’s written approval.

Can you weld rebar?

Weld only bars made for it. ASTM A706 limits chemistry and carbon equivalent to make bars weldable and points to AWS D1.4; ASTM A615 notes that it includes no provisions to enhance weldability. CRSI recommends against field arc welding where possible and against tack welds on crossing bars, which it links to brittle failure. Ask the engineer for a welding procedure before any rebar weld.

Sources

Last reviewed November 2026 by the CB&C Editorial Team. See our editorial standards.