Soil bearing capacity is the pressure a footing may put on the ground: the 2024 IBC allows 1,500 psf on clay to 12,000 psf on bedrock without a report, and four public reports gave 2,000 to 3,000 psf.
Key takeaways
- Without approved test data, footing pressure may not exceed the presumptive values in IBC 2024 Table 1806.2: 1,500 psf for clay and silt, 2,000 psf for sand, 3,000 psf for gravel, 4,000 psf for sedimentary rock and 12,000 psf for crystalline bedrock.
- Allowable bearing capacity is the ultimate (failure) pressure divided by a factor of safety; the Caltrans building foundations module (July 2024) uses a factor of safety of 3.
- Mud, organic silt and clay (OL, OH), peat (Pt) and undocumented fill get no presumptive value at all under IBC Section 1806.2 until test data is submitted.
- A 70 kip column on a net allowable bearing pressure of 2,000 psf, the value in the Tampa Fire Station 19 geotechnical report (2013), needs a 6 ft 0 in square footing; on 1,500 psf clay it needs 6.83 ft.
- Table 1806.2 values may be raised by one-third only with the IBC 1605.2 alternative allowable stress load combinations that include wind or earthquake (IBC 1806.1).
- Fixing weak soil is priced in cubic yards and linear feet: Tennessee DOT 2025 averages were $19.20 per cubic yard for undercutting, $93.52 for foundation fill and $94.97 per linear foot for 12 inch steel piles (TDOT average unit prices, 2025).
What is soil bearing capacity?
Soil bearing capacity is the vertical pressure, in pounds per square foot (psf), that soil under a footing can carry without shear failure or excessive settlement. Designers use the allowable value, which is the ultimate failure pressure divided by a factor of safety. IBC Section 1808.2 requires foundations to stay within the allowable bearing capacity and to minimize differential settlement.
Five terms show up in reports and code tables; mixing them up changes footing size.
| Term | What it means | Typical unit | Where you will see it |
|---|---|---|---|
| Ultimate bearing capacity | Pressure at which the soil fails in shear under the footing | psf or ksf | Engineer’s calculation; Caltrans calls it the gross nominal bearing resistance |
| Allowable bearing capacity (pressure) | Ultimate divided by a factor of safety, and kept low enough to meet a settlement limit | psf | Geotechnical report; IBC 1808.2 |
| Net allowable bearing pressure | Pressure above the weight of soil removed to the footing base (overburden) | psf | New Bern, NC report (2020): net 2,000 psf |
| Gross allowable bearing pressure | Total pressure under the footing, including the footing and backfill weight | psf | Reports that do not say net; IBC 1808.3 lets dead load include footing and fill weight |
| Presumptive load-bearing value | Code default used without a site-specific report | psf | IBC 2024 Table 1806.2: 1,500 to 12,000 psf |
One ksf is 1,000 psf, and one kip is 1,000 lb. The Table 1806.2 footnote gives the SI conversion: 1 psf equals 0.0479 kPa, so 2,000 psf is about 96 kPa.
What is the difference between ultimate and allowable bearing capacity?
Ultimate bearing capacity is where the soil fails; allowable bearing capacity is what you design to. The allowable value equals the ultimate value divided by a factor of safety, which is 3 for shallow building footings in the Caltrans Geotechnical Manual (July 2024). An ultimate pressure of 6,000 psf therefore gives an allowable pressure of 2,000 psf.
The factor of safety changes with the element and the method: IBC 1810.3.3.1.5 asks for 3 on uplift found by analysis but 2 when a load test measured it.
| Element or check | Minimum factor of safety | Source |
|---|---|---|
| Shallow spread and strip footings (allowable stress design) | 3 on ultimate bearing pressure | Caltrans, Building and Miscellaneous Structure Foundations, July 2024 |
| Deep foundation element, load-tested | 2: allowable load not more than one-half the ultimate from the test | IBC 2024 Section 1810.3.3.1.2 |
| Deep foundation, bearing layer and layers below | 2: ultimate at least twice the working load | IBC 2024 Section 1810.3.3.1.7 |
| Deep foundation uplift | 3 by analysis, 2 by load test (2 and 1.5 for wind or seismic uplift) | IBC 2024 Section 1810.3.3.1.5 |
| Footing sliding and passive resistance (one report) | About 1.5, already built into the values | Fircrest, WA report, March 2016 |
Ask the geotechnical engineer which factor of safety sits inside the number in the report, and whether the value is limited by shear or by settlement. Two reports with the same 2,000 psf can carry different margins.
What are the IBC presumptive load-bearing values by soil type?
IBC 2024 Table 1806.2 sets five presumptive vertical pressures: 12,000 psf for crystalline bedrock, 4,000 psf for sedimentary and foliated rock, 3,000 psf for sandy gravel and gravel, 2,000 psf for sands and silty or clayey gravels, and 1,500 psf for clays and silts. Section 1806.2 caps design at these values unless approved data supports more (ICC, 2024 IBC Chapter 18).
| Table 1806.2 class | USCS symbols | Vertical pressure (psf) | Lateral bearing (psf per ft of depth) | Sliding: friction coefficient or cohesion |
|---|---|---|---|---|
| 1. Crystalline bedrock | None | 12,000 | 1,200 | 0.70 |
| 2. Sedimentary and foliated rock | None | 4,000 | 400 | 0.35 |
| 3. Sandy gravel and gravel | GW, GP | 3,000 | 200 | 0.35 |
| 4. Sand, silty sand, clayey sand, silty gravel, clayey gravel | SW, SP, SM, SC, GM, GC | 2,000 | 150 | 0.25 |
| 5. Clay, sandy clay, silty clay, clayey silt, silt, sandy silt | CL, ML, MH, CH | 1,500 | 100 | 130 psf cohesion |
| Mud, organic silt and clay, peat, undocumented fill | OL, OH, Pt | No presumptive value without data | None | None |
USCS is the Unified Soil Classification System in ASTM D2487, the method IBC Section 1803.5.1 names for classifying soil. Three code rules travel with the table:
- Section 1806.1: the values go with allowable stress design load combinations (ASCE 7 Section 2.4 or IBC 1605.2), and may be raised by one-third only with the 1605.2 alternative combinations that include wind or earthquake.
- Section 1806.3.3: lateral bearing may rise by the tabular value for each extra foot of depth, up to 15 times the tabular value; Section 1806.3.2 limits clay sliding resistance to one-half the dead load.
- Section 1806.2 Exception: the building official may accept a presumptive value for lightweight or temporary structures even on the excluded soils.
These are the 2024 IBC values. Your jurisdiction may enforce an earlier edition or a local amendment, so ask the building department which edition and which Table 1806.2 it enforces before the structural engineer sizes footings.
When do you need a geotechnical report instead of the table?
Under IBC 2024 Section 1803.2 a geotechnical investigation is the default for every building, waived only when the building official accepts data from adjacent sites. Section 1803.5.2 lets the official require one whenever soil strength or compressibility is in doubt, and any bearing value above Table 1806.2 needs approved substantiating data. The geotechnical report is that data.
For most commercial sites the report is also the cheaper route, because a higher number shrinks every footing. A 70 kip column needs 46.67 sq ft of footing at the clay value of 1,500 psf but 23.33 sq ft at a report value of 3,000 psf, half the concrete area. Caltrans states it as policy: it computes bearing at each building rather than using Table 1806.2, except where footings bear on rock.
| Situation | What the code or agency says | Source |
|---|---|---|
| Any new building | Investigation required unless waived on adjacent-site data | IBC 2024 Section 1803.2 |
| You want more than Table 1806.2 | Submit approved substantiating data | IBC 2024 Section 1806.2 |
| Organic soil, peat or undocumented fill under footings | No presumptive value; data required | IBC 2024 Section 1806.2 |
| How many borings | At least one boring or cone test per building and per 10,000 sq ft of footprint | Caltrans, July 2024 |
| How deep and how often to test | Standard penetration test (SPT) samples every 2.5 ft to 15 ft below footing bottom | Caltrans, July 2024 |
| Footings on rock | Table 1806.2 values may be used; test pits can confirm the rock | Caltrans, July 2024 |
The SPT, run under ASTM D1586, counts hammer blows to drive a sampler 12 inches; low counts flag loose sand or soft clay. Ask for the boring logs as an appendix so the structural engineer can see which layer each footing bears on.
What bearing values do real commercial geotechnical reports give?
Four public-agency reports for fire stations and recreation buildings recommended allowable bearing pressures of 2,000 to 3,000 psf, up to 5,000 psf with deeper and wider footings in San Diego. Each value came with conditions: compacted or densified soil, minimum footing widths and a settlement estimate of about 1/2 to 1 inch.
| Project and report date | Soil under footings | Recommended bearing value | Conditions attached | Source |
|---|---|---|---|---|
| Fire Station 19, Tampa, Florida (2013) | Densified existing sand or structural fill | Net 2,000 psf | Columns up to 70 kips; strip 18 in and pad 24 in minimum width; 16 in embedment; 95% Modified Proctor (ASTM D1557); about 1/2 in settlement | City of Tampa Addendum 2, June 28, 2013 |
| Community Center and Pool, Fircrest, Washington (2016) | Native glacial deposits or structural fill | 3,000 psf, excluding footing and backfill weight | Plus one-third for wind or seismic; settlement under 1 in, differential under 1/2 in over 50 ft | Report dated March 18, 2016 |
| Fairmount Avenue Fire Station, San Diego, California (2019) | Compacted fill after overexcavation | 2,500 psf | Plus 500 psf per ft of extra depth and 250 psf per ft of extra width, to 5,000 psf; plus one-third for wind or seismic | Report dated March 15, 2019 |
| Stanley White Recreation Center, New Bern, North Carolina (2020) | Sands or approved structural fill | Net 2,000 psf | Columns up to 50 kips, walls 3 klf; 30 in column and 18 in wall minimum width; 1 in total settlement | Report dated March 23, 2020 |
The column loads in these reports, 50 to 70 kips, are typical of one-story public buildings. A two-story building with a basement can reach 375 kips per column, the figure Portage County, Wisconsin gave bidders for its law enforcement center in 2025, which our geotechnical report guide covers.
How do you size a footing from the soil bearing capacity?
Footing area equals the service load divided by the allowable bearing pressure. For the 70 kip column in the Tampa report at a net 2,000 psf, that is 70,000 lb divided by 2,000 psf, or 35.0 sq ft, which rounds up to a 6 ft 0 in square footing. Width then has to meet the report minimum and IBC 1809.4, which sets 12 inches as the floor.
- Take the column or wall service load from the structural engineer in kips (1 kip = 1,000 lb), using the allowable stress load combinations in IBC 1806.1 or 1808.3.
- Confirm whether the report value is net or gross. If gross, subtract the footing and backfill weight per square foot from the allowable pressure first.
- Divide the load by the allowable pressure to get the area in square feet; take the square root for a square footing side.
- Round up to a buildable size (usually the next 3 inches) and check the report minimum: 24 in for pads in Tampa, 30 in in New Bern.
- Set depth: at least 12 in below undisturbed ground (IBC 1809.4), below the local frost line (IBC 1809.5), or the deeper report value (16 in in Tampa, 18 in in San Diego).
- Check the pressure on the rounded size against the allowable value and have the engineer confirm settlement.
The same arithmetic shows how much the bearing number matters. The table runs the 70 kip Tampa column across the five Table 1806.2 values and adds the gross case and a wall footing.
| Case | Load | Allowable pressure | Required area | Footing size | Source of inputs |
|---|---|---|---|---|---|
| Clay or silt, presumptive | 70 kips | 1,500 psf | 46.67 sq ft | 6.83 ft square | IBC Table 1806.2 class 5 |
| Tampa report, net | 70 kips | 2,000 psf | 35.0 sq ft | 5.92 ft, use 6 ft 0 in (1,944 psf) | Tampa report, 2013 |
| Gross 2,000 psf, 16 in footing at an assumed 150 pcf | 70 kips | 2,000 minus 200 = 1,800 psf | 38.9 sq ft | 6.24 ft, use 6 ft 3 in | CB&C arithmetic |
| Gravel, presumptive | 70 kips | 3,000 psf | 23.33 sq ft | 4.83 ft square | IBC Table 1806.2 class 3 |
| Sedimentary rock, presumptive | 70 kips | 4,000 psf | 17.50 sq ft | 4.18 ft square | IBC Table 1806.2 class 2 |
| Crystalline bedrock, presumptive | 70 kips | 12,000 psf | 5.83 sq ft | 2.42 ft square | IBC Table 1806.2 class 1 |
| New Bern wall footing | 3 klf | 2,000 psf | 1.5 sq ft per ft | 18 in wide, equal to the report minimum | New Bern report, 2020 |
| Fircrest column, wind or seismic combination | 50 kips | 3,000 x 4/3 = 4,000 psf | 12.5 sq ft | 3.54 ft square | Fircrest report, 2016 |
These sizes ignore moments, uplift and eccentric loads, which the structural engineer adds under the IBC 1808.3 load combinations. Footing thickness and reinforcement come from the concrete design, so pair this page with our concrete psi guide and our rebar size chart.
Why can settlement, not soil strength, set the number?
A footing can be safe against shear failure and still sink too much, so reports cap the allowable pressure at whatever keeps settlement within a target. Three of the public reports above estimated about 1/2 to 1 inch total settlement, and two held differential settlement under 1/2 inch. Wider footings stress soil deeper, which is why the same pressure settles more under a big footing.
| Report | Total settlement estimate | Differential settlement | Source |
|---|---|---|---|
| Tampa Fire Station 19 (2013) | About 1/2 in | Not stated | Tampa report |
| Fircrest Community Center (2016) | Less than 1 in | Less than 1/2 in over 50 ft of wall footing | Fircrest report |
| New Bern Recreation Center (2020) | 1 in | Less than 0.5 in | New Bern report |
| Portage County, WI law enforcement center RFB (2025) | 1 in design target | 1/2 in design target | our geotechnical report guide |
Metal building frames and tilt-up panel joints are sensitive to differential movement, so give the geotechnical engineer the structure type and column loads when you order the report; the 1/2 inch differential limit in the Fircrest report assumed 50 kip columns. Our pre-engineered metal building guide and our tilt-up construction guide cover those systems.
What can you do when the soil bearing capacity is too low?
There are four standard fixes, in rising cost order: overexcavate the weak soil and replace it with compacted structural fill, preload it with a surcharge, reinforce it with aggregate piers or other ground improvement, or carry loads past it on driven piles or drilled shafts. Depth of the weak layer decides which one fits; the public reports used 3 to 6 ft of overexcavation.
| Fix | When reports recommend it | Numbers from the record | Source |
|---|---|---|---|
| Overexcavate and replace | Weak or uncontrolled fill a few feet thick | San Diego: at least 3 ft below pad and 2 ft below deepest footing, 10 ft outside the footing perimeter. Fircrest: extend past each footing edge by the overexcavation depth or 2 ft, whichever is less. New Bern: isolated undercuts to about 6 ft | San Diego 2019; Fircrest 2016; New Bern 2020 |
| Compact or densify in place | Loose sands near the surface | Tampa: densify to 95% Modified Proctor (ASTM D1557) at bearing level | Tampa 2013 |
| Surcharge (preload) | Soft compressible deposits where time is available | Fircrest lake deposits: about 5 ft of temporary fill, 6 to 8 weeks for most primary consolidation | Fircrest 2016 |
| Ground improvement (aggregate piers, chemical stabilization) | Soft layers too deep to dig out economically | IBC 1808.6.4 lists chemical stabilization, dewatering and presaturation for expansive soil | IBC 2024 Section 1808.6 |
| Deep foundations | No adequate bearing stratum near the surface, or organic soils | Allowable load not over one-half the load-test ultimate (IBC 1810.3.3.1.2); Caltrans uses them only after shallow options are exhausted | IBC 1810; Caltrans 2024 |
Earthwork under footings over 12 inches deep needs a fill specification in the report under IBC 1803.5.8, and the compaction is checked during construction under the soils special inspections in IBC 1705.6. Our special inspections guide covers who hires that inspector.
How much do poor soils add to foundation cost?
Order of magnitude only: Tennessee DOT’s 2025 statewide averages were $19.20 per cubic yard to undercut unsuitable soil and $93.52 per cubic yard for foundation fill, so overexcavating 3 ft under one 6 ft square footing costs roughly $1,250 in unit prices. Piles run about $45 to $95 per linear foot for 12 inch steel sections (TDOT, 2025; WisDOT, October 2025).
| Item | Unit price | Scope and quantity | Source |
|---|---|---|---|
| Undercutting (excavate unsuitable soil) | $19.20 per CY | Tennessee statewide average, 183,440 CY on awarded 2025 contracts | TDOT Average Unit Prices 2025, item 203-05 |
| Foundation fill material | $93.52 per CY | Tennessee statewide average, 5,986 CY | TDOT 2025, item 204-08 |
| Select borrow | $16.47 per CY | Wisconsin FY2025 average | WisDOT Average Unit Price List, Oct 21, 2025, item 208.1100 |
| Steel piles, 12 inch | $94.97 per LF | Tennessee statewide average, 19,723 LF | TDOT 2025, item 606-03.03 |
| Steel H-piling HP 12 x 53 | $45.00 per LF | Wisconsin FY2025 average | WisDOT 2025, item 550.1120 |
| Drilled shaft in soil (bridge size) | $2,029.90 per vertical ft | Tennessee region 1, 210 vertical ft; far larger diameter than building piers | TDOT 2025, item 625-02.01 |
Worked example with every input shown, using Tennessee 2025 averages and a 6 ft square footing:
| Step | Arithmetic | Result |
|---|---|---|
| Overexcavation footprint | 6 ft footing plus 2 ft each side (Fircrest rule) = 10 ft by 10 ft | 100 sq ft |
| Volume at 3 ft deep | 100 sq ft x 3 ft = 300 cu ft, divided by 27 | 11.1 CY |
| Dig out and replace | 11.1 CY x ($19.20 + $93.52) | About $1,250 per footing |
| Alternative: two 40 ft steel piles | 80 LF x $94.97 (TDOT) or x $45.00 (WisDOT) | $7,598 or $3,600, before pile cap and mobilization |
These are highway unit prices, not building bids: a small building job carries mobilization and testing on a fraction of the volume, so expect higher unit costs than averages built on 183,440 CY of Tennessee undercutting. Carry a soils allowance in the budget until the report is in, as our construction contingency guide explains, and price surprise undercuts as unit-price items so they do not arrive as a lump-sum change order.
Which bearing number and foundation should you use?
Use the geotechnical report value whenever one exists, and Table 1806.2 only where the building official waived the investigation or footings bear on rock. If footings come out too large to fit, or the soil is organic or undocumented fill, the depth of the weak layer picks the fix. The table and the flowchart hold the same logic.
| If | Then | Rule or record |
|---|---|---|
| The report gives an allowable value | Size footings to it, with its minimum widths and settlement limit | IBC 1806.2; report conditions |
| No report, investigation waived in writing | Use Table 1806.2: 1,500 psf clay, 2,000 psf sand, 3,000 psf gravel | IBC 1803.2 Exception; Table 1806.2 |
| Footings bear on rock | Table 1806.2 rock values (4,000 or 12,000 psf) may be enough; test pits confirm rock | Caltrans, July 2024 |
| Soil is OL, OH, Pt or undocumented fill | No presumptive value; remove, improve or go deep | IBC 1806.2 |
| Weak soil only a few feet deep | Overexcavate and replace with compacted structural fill | San Diego 2019, Fircrest 2016, New Bern 2020 |
| Thick soft deposit and schedule slack of about 2 months | Surcharge or ground improvement | Fircrest 2016: 5 ft surcharge, 6 to 8 weeks |
| No adequate bearing layer near the surface | Driven piles or drilled shafts sized by load test or analysis | IBC 1810.3.3.1 |
Structural engineering fees for the footing design are covered in our structural engineer cost guide. The slab sits on the same subgrade but is designed with a subgrade modulus rather than a bearing pressure, over a 3 1/2 inch code minimum thickness (IBC 1907.3); slab pricing is in our concrete slab cost per square foot guide.
The values come from a geotechnical report, and field compaction tests confirm the fill meets them.
How we compiled this
We read the 2024 IBC Chapter 18 text, the July 2024 Caltrans building foundations module, four geotechnical reports posted by the cities of Tampa, Fircrest, San Diego and New Bern, and two state DOT average unit price lists (Tennessee 2025, Wisconsin October 2025), all accessed in November 2026. Footing sizes are our arithmetic from those inputs. We did not test soil or design foundations; local amendments to Table 1806.2 were not reviewed.
Frequently asked questions
What is a good soil bearing capacity for a commercial building?
For one-story commercial buildings, public geotechnical reports commonly recommend 2,000 to 3,000 psf: net 2,000 psf for a Tampa fire station (2013) and a New Bern recreation center (2020), 3,000 psf for a Fircrest, Washington community center (2016). Below 1,500 psf, the IBC 2024 Table 1806.2 value for clay, footings grow large and engineers start weighing overexcavation, ground improvement or piles.
How do you calculate soil bearing capacity?
The geotechnical engineer calculates the ultimate bearing capacity from soil strength found in borings and lab tests, then divides by a factor of safety, 3 in the July 2024 Caltrans building foundations module, and lowers it further if settlement would exceed the target, usually about 1 inch. Owners and contractors then use the allowable value: footing area equals service load divided by allowable pressure.
What is the bearing capacity of clay?
Without a geotechnical report, IBC 2024 Table 1806.2 allows 1,500 psf for clay, sandy clay, silty clay and silts (USCS CL, ML, MH and CH), with a lateral bearing of 100 psf per foot of depth and 130 psf cohesion for sliding. Organic clays (OL, OH) get no presumptive value. A report can justify more for stiff clay or require less for soft clay.
Can allowable bearing pressure be increased for wind and seismic loads?
Yes, by one-third in many cases. IBC 2024 Section 1806.1 allows Table 1806.2 vertical and lateral values to rise by one-third only with the Section 1605.2 alternative allowable stress load combinations that include wind or earthquake. Reports for Fircrest (2016) and San Diego (2019) allow the same one-third increase for total loads including wind or seismic forces.
How is soil bearing capacity tested on a commercial site?
By soil borings with standard penetration tests (ASTM D1586), sometimes cone soundings, plus lab tests. The July 2024 Caltrans building module calls for at least one boring or cone test per building and per 10,000 sq ft of footprint, with SPT samples every 2.5 feet to 15 feet below the bottom of the footings, and groundwater readings from the boreholes.
Is net or gross allowable bearing pressure larger?
The numbers are not interchangeable. Net allowable bearing pressure is the pressure above the weight of soil removed to the footing base, as the 2020 New Bern report defines it, so the footing and backfill weight need not be added. With a gross value, subtract that weight first: a 16 inch footing at 150 pcf takes about 200 psf off 2,000 psf.
Sources
- 2024 International Building Code, Chapter 18 Soils and Foundations (Sections 1803, 1806, 1808, 1809, 1810), International Code Council, accessed November 15, 2026.
- Geotechnical Manual: Building and Miscellaneous Structure Foundations (July 2024), California Department of Transportation, accessed November 15, 2026.
- Contract 13-C-00033 Fire Station 19 Improvements, Addendum No. 2 with geotechnical report (June 28, 2013), City of Tampa, accessed November 15, 2026.
- Geotechnical Engineering Services Report, Fircrest Community Center and Pool (March 18, 2016), City of Fircrest, accessed November 15, 2026.
- Geotechnical Investigation, Fairmount Avenue Fire Station, Appendix E.1 (March 15, 2019), City of San Diego, accessed November 15, 2026.
- Geotechnical Engineering Report, Stanley White Rec Center (March 23, 2020), City of New Bern, accessed November 15, 2026.
- Average Unit Prices, Awarded Contracts January 1 to December 31, 2025, Tennessee Department of Transportation, accessed November 15, 2026.
- Average Unit Price List (October 21, 2025), Wisconsin Department of Transportation, accessed November 15, 2026.